Document JNe3Z5jbj69d62nXbrbEoLp3r
INTRACOMPANY CORRESPONDENCE
R-9 ' Rew 166.
Ronald E. Benton - Industrial Hygiene - GOB - LL E. W. DRESSEN - SAW PATRICIO REDUCTION PLANT H. V. Helton, E. Jack Gates, R. W. Winstead, P. R. Laden, W. A. Wright, J. R. Amos, Dr. E. C. Irby - EXO
January 30, 1984
ASBESTOS SURVEY - SAN PATRICIO
In the early 1970's, Reynolds Metals Company instituted a program to remove all non-essential asbestos-containing products from our manufacturing facilities. Although this program has been quite successful, several areas still remain where asbestos is currently being used. Consequently, the Medical Department, along with Central Engineering, has begun a final effort to eliminate all inhalation exposure to asbestos. In order to accomplish this goal, all asbestoscontaining products which have feasible substitutes will be eliminated from RMC facilities. Where there are no feasible substitutes, appropriate work practices will be developed, so that there will be no inhalation exposure to asbestos while using the product.
As part of this efforti the San Patricio Reduction Plant was visited on November 9 and 10, 1983, to evaluate the status of the plant's asbestos control program. During this audit, those asbestos-con taining products in inventory were identified, as well as those already in place or currently being used by the plant.
Results of this survey indicate that the San Patricio Reduction Plant has made considerable progress in eliminating the use of most asbestos-containing products. The audit did reveal, however, several areas which need some additional attention.
First, those asbestos-containing products currently being used by the plant were identified. For several of the products, it was determined that a potential exposure to asbestos may exist due to the application or condition of the material. For several others, feasible sub stitutes have been identified and are readily obtainable. Consequently, it is our recommendation that the plant should remove these items from use and substitute a non-asbestos product. Table 1 lists each of these products, as well as potential substitutes. Where possible, the plant should Tetum its current inventory of these items for credit. If this is not feasible, then the plant should stock only Chose items necessary, until the substitutes have been obtained. The remaining asbestos-containing products should be placed in labeled, sealed plastic bags and disposed of in an approved sanitary landfill. Contact the Environmental Control Department for information on proper disposal procedures and approved landfills.
RMC0800260000459
ASBESTOS SURVEY SAN PATRICIO REDUCTION PLANT
-2-
Second, ten (10) bulk samples of material already in place or currently being used were collected and screened for asbestos. In addition, a number of products were positively identified during the audit as containing asbestos (Appendix II & III). Based on these results, Table 2 was developed, identifying the various applications of chose products found to contain asbestos. It should be noted that, for those products already in place, (e.g., pipe insulation, transite hood liners, boiler insulation, etc.), the presence of undisturbed, non-friable asbestos does not represent an exposure hazard. Consequently, there is no requirement to remove those types of products from the plant. If, however, work is performed on any of these products (e.g., demolition, repair), then non-asbestos substitutes should be utilized, where available, and appropriate work practices followed to eliminate any inhalation exposure to asbestos (Appendix IV). The non-asbestos substitutes should be color coded (e.g., Reynolds blue) and accurate records kept to prevent the need for expensive and unnecessary controls during future work. Due to the many disadvantages and continuing expense of encapsulation, it is not a recommended control method for most loose or damaged insulation. In certain situation, enclosure of existing asbestos pipe or duct insulation with a lagging material may be an acceptable control method. Please contact the Industrial Hygiene Department for specifics. If work is performed on an item not listed in Tables 1 or II, it should be handled as asbestos, until appropriate analytical results can be obtained.
Third, although marinite is no longer used by the San Patricio Plant (other than molten metal plugs), numerous items (donuts and slab floats) were found in the warehouse and storage area adjacent to the bag filter equipment. In order to prevent exposure to asbestos from the inadvertent handling, cutting or sawing oi the marinite, it should be removed from the plant and properly disposed of in an approved landfill. Again, contact the Environmental Control Department for information on proper disposal procedures and approved landfills.
Finally, in order to accomplish the objectives of this program and to ensure its continued effectiveness, it is recommended that someone at the San Patricio Plant be designated as contact person. In this regard, that individual would receive and disseminate information concerning non-asbestos substitutes.
In addition, he would review all Material Safety Data sheets (MSDS) for new products, to ensure that no asbestos is contained in them. (Note: A procedure is currently being developed through Purchasing which wi 1 allow Reynolds Metals Company to determine whether or not a product contains asbestos before it enters the plant.) Finally,
RMC0800260000460
ASBESTOS SURVEY SAN PATRICIO REDUCTION PLANT
2- -
this person would be responsible for making certain that the appropriate safe-handling procedures are utilized when working with asbestos-containing products.
If you have any questions concerning this report, or if further information is desired, please feel free to contact us.
Ronald E. Benton
REB/csd Att.
Robert C. Burton
RMC0800260000461
cation
Xht
mO
Co
*v9*
e
*C*l --wm*
hik.i %>v
exu
st/j
0W oo
N
---
U
ea
1 O8
fhigi 10 HV
>
VC9 --
X0
>>H a*oo>g
W9C>t w1o*
---aa.
5 fZ
X
*W>
(&-- '*
--9cOl
ht X -h-i
0C *c0W.
5
-<1
a.
vfl
u. 3 &9
2g
5
gI
S S
o- ou u
ei
5 S3
>u* o&
cx
4J CO
XU0 --bCIJIl
1 U
x It 32
--9E> cOe
o
X
Vi
<u o
hi a.
o o
0-41
Xv> o --u
hi <o o-o
en h. c*
2
xm-i
mwaJOuC2--xu9t>
e
*3 *o
a.
n
ata4
MyaMu
T5
41
HO
xo
sa.
V > 2 V
<H W1*- XW at 5 bI MX Xhi OW
V
9
HW S M< O
xoV. e e o
Cl
ei > o
Zxu w
&0
* o<
a.
RMC0800260000463
TABLE 2 SAN PATRICIO REDUCTION P U N T
ASBESTOS CONTAINING MATERIALS
RMC0800260000464
I
APPENDIX II
Page 1 of 2
PLANT SAN PATRICIO REDUCTION PLANT
SURVEYED BY RONALD E. BENTON
LOCATION
ROBERT C. BURTON
DATE ____
DIVISION_______________
ASBESTOS SURVEY
SAMPLE
ARALYTICAL
SAMPLE #LOCATIONAPPLICATIONRESULTS
IT
Powerhouse
water stand pipe insulation
Yes
bldg. 4i
LFMlUilE pipe (suap
"--
Powerhouse Maine.
machine & hot water pipe)
Yes
Bldg. 41 Powerhouse Maint.
lub oil sep. transite sleeves
Yes
Bldg. 40
(Cooper Bessesier) old
Yes
Bldg. 40 Powerhouse Bldg. 42 Powerhouse Bldg. 41 Powerhouse
Power Plant Control Room
toil, H^O, exhaust ducts
1exhaust ana pipe insul. natural gas) vessel & pipe insul., sheet mill board against wi 11
water pipe in rest room
Yes Yes Yes Yes
2T Bldg. 42
natural gas line Cement over mineral wool/
3T
Boiler Piping
fiberglass
Straight run white diock
4T
Boiler Piping
material
5T Potroom
leg isolator
pot leg isolators, pot
Potroom
duct isolator
asbestos jacket, scrap
Pot rebuilding
sheet gasket, several
sheets transite under a
Pot rebuildine
hood pipe cement insul. - at
Boilers
elbows A joints
6T Potroom
siphon tip gasket
Yes Yes No Yes Yes
Yes Yes Yes Yes
7T Fac. 160
sheets of material
Yes
8T Lab- Environmental pipe insul.
Yes
distillation column has
Lab - Environmental damps with asb. sleeves, also tap ot unit transite,
Yes
Lab-Environmental
HO pipe insul., lab cart
Yes
taps - transite, several
Lab-Environmental
paper discs (new part lab) ,
Yes
piece of rope
Lab-Environmental
Yes
9T
Carbon Plant
mixer insulation
Yes
Carbon Plant
old mixer & pipe insul.
Yes
RMC0800260000471
PLANT San Patricio Reduction Plant .. LOCATION _______________
DIVISION
Page 2 of 2
SURVEYED BY RONALD E. BENTON i ROBERT G. BURTON
DATE
ASBESTOS SURVEY
SAMPLE
SAMPLE #LOCATIONAPPLICATIONNESULTS Prpg~niumten ------------------------
10T Wet Lab
outaide long hood
ANALYTICAL YeB
Wet Lab Wet Lab Wet Lab Wet Lab
lined with tranaite (front
"A1 BicR'T, ring giuRuiv,------------
sleeves,Prec. Sci. oven aso. door seals, plpt! illUUl behind cabinet, Haskins hea er> CFABU1E6 11(160 DISC Ui.UI UU (outside hood)
Yes Yes Yea Yes
Elec. Shop Elec. Shop
_TC wire ideal batterv mil
Red/White & bin.wire, glove s iner
Yes Yes
Tin Shoo Area t Tin Shop Area
asb. iacket under table by stop aigna
Yes Yes
Foree Area Maint. Shoo Maint. Shop Maint. Shop Casthouse Caathouae Storeroom Storeroom Storeroom Garage Garage
millboard in front 2 fees. htr. for molten metal pumpi tranaite linine (scran oca next to pump), clutch plate s
e shoe assemblys, packing
rope in storage area acrose from #7 fee.. ? atoooera for molten metal
Yes Yes Yeft Yes Yes
packing, gaskets (sheet & woven cloth), brake linine & pads, gloves, rolls sheel gasket
f tranaite, marinite, TC win
tranaite walla on food wan er, roll sheet zasket material brake assembly, precut gasl eta and metal zaskets
Yes Ye* Ye* Yea Yes
Carpenter Shoo Reaeent Bide.
small roll 6" zasket mater al rinz zaskets (mill board t'
Yea
Fac 60 Fac.60
zasket material, asb. blan et 3 sheets board material
Yes Yes
Storage area(bay) Filter Area
.3 boxes marinite slab floats
Yes Yes
RMC0800260000472
APPENDIX III SAN PATRICIO REDUCTION PLANT STOREROOM ASBESTOS PRODUCTS*
PRODUCT
Woven asbestos gaskets Woven asbestos gaskets Flexataulic gasket Flexataulic gasket Flexataulic gasket Flexataulic gasket Packing Packing Packing
Packing Gloves Brake lining Brake pads Brake pads Brake pads Brake pads Brake pads Brake pads Brake pads Woven gasket Head gasket Gasket Gasket Gasket Round rolled metal asbestos Round rolled metal asbestos Metal jacketed asbestos wire Sheet gasket Marinite donuts
Powerhouse Maintenance Shop (Bldg. 41) Ring gasket Packing Gaskets Gaskets Gaskets Copper clad asb. gaskets Copper clad asb. gaskets Copper clad asb. gaskets Copper clad asb. gaskets
STOCK NUMBER
16-05-0110 16-05-0160 16-06-0010 16-06-0020 16-06-0030 16-06-0040 16-25-0500 16-25-5500 16-25-0495
16-25-2800 22-60-1225 54-43-6545 54-43-6560 78-86-5600 78-86-6050 78-86-7257 78-86-3685 78-86-7471 78-86-7551 72-76-3560 86-14-1294 86-14-1300 86-14-1305 86-14-1310 87-13-2560 87-13-2590 87-13-3280 87-13-3370 72-77-0083
82-15-2778 82-15-2813 82-15-2798 82-15-3398 82-15-3610 82-15-3570 82-15-3815 82-15-3862 82-15-3870
RMC0800260000473
APPENDIX III
SAN PATRICIO REDUCTION PLANT
STOREROOM ASBESTOS PRODUCTS*
PRODUCT
Copper clad asb. gaskets Copper clad asb. gaskets Copper clad asb. gaskets Copper clad asb. gaskets Copper clad asb. gaskets Asb. disc gaskets Asb. disc gaskets Asb. disc gaskets Gaskets Caskets Gaskets Gaskets Asb. cloth gasket Gasket (sheet) Gasket (sheet) Gasket (sheet) Gasket (sheet) Gasket (sheet) Sheet gasket Sheet gasket Sheet gasket Sheet gasket Sheet gasket Sheet gasket Sheet gasket Sheet gasket Sheet gasket Sheet gasket Sheet gasket Sheet gasket Sheet gasket Sheet gasket Sheet gasket Sheet gasket Sheet gasket Sheet gasket Sheet gasket
Page 2 of 2
STOCK NUMBER
82-15-3810 82-15-4157 82-15-4162 82-15-3908 82-15-3890 84-23-2310 84-23-2575 84-23-2580 83-28-3554 83-28-3610 83-28-3620 83-28-3623 83-28-3557 87-11-1713 87-11-1800 87-28-3889 87-28-1375 87-25-1443 83-28-4337 83-28-4339 83-28-4338 83-28-4305 83-28-4485 83-28-4475 83-28-4455 83-28-4065 83-28-4055 83-28-4100 83-28-4210 83-28-4200 83-28-4108 83-28-4015 83-28-4106 83-28-4170 83-28-4140 83-28-4120 83-28-4157
* Note: This liat is not all inclusive, but only contains those items noted during this survey to contain asbestos.
RMC0800260000474
apfdcdc IV SPECIAL IWCLSC HCCHlUHfcS
RMC0800260000475
SPECIAL SMIDLX1I6 PAOC^MJAE
A*
this praeedise is ter them products tfdeh should poee.so Antes swpooure tdiile moving or handling t#* Material* feonples Of the types of awtaxials included ant **? covered wire, * clutch facings, conpnued gaskets, ma asphalt roof coating.
emWL K3UZJWKT KQUDGDt labeled S edl plastic tzesh hags with ties (available fron
local safety sipply distributor). MBKOO. EOKOKlOSt
msaw. FHjnmvr wiumbpi
Rare required.
K2K mCXZGB:
1. lb asbestos scrap ahall be left cn the fleers, waDarays, er equipmt.
2. All asbestos scrap shall be plaead and sealed in labeled plastic hags and disposed of st an approved sanitary landfill. CD* plant er corporate tevircmentel Control Eepament should be contacted for specifics.)
3. lb blowing er dry sweeping, acreping, er sanding of esbestos enteritis er surfases cpvtrtd with asbestos-containing aetarial shall be peaaittad.
2t la the position of WC that the aiaehining or cutting of transite and aeriaite cannot be perfused without an inhalation eepoeure to sabestee. lhexe say be, bowever, certain laolated inatanoas where in-pleoe transite auat be sawed. In those situations. Special Handling Procedure should be followed.
(Em. 11/13)
RMC0800260000476
SPECIAL WHDLXMG PAOCEBORE
This procedure is for thoee products Mich* Man hsndlad or sawed
Cram existing surfaces, Mould not result in
saqpoeurss Above the
CEHA permissible exposure lsvsl. t&cposurm* aay, however he Move the 0.1
fihar/cc sediesl Maintenance level.) EsMiples of the types of Materials
Included szei Dope, cloth* gloves, blankets, and oosts.
SPECIAL nUUMEMT:
Labeled 6 ail plastic trash begs with ties (available iron local safety svgply distributor).
MEDICAL OAKQAJZOSs
%
Annually, personnel involved in the renewal or handling of neterials in this gzoig> Mall be provided e physical examination* if exposures exceed 0.1 fibers/cc. this examination Mall include a chest x-ray, pulmonary fisjction test (FVC and I3EV), and e ocxrplete history.
FEKSGNU. KROnCTIVE EBnMEHTi
Half-weak air-purifying respirator (bcaiples: Si 18710 or 19900 Series, American Optical 11050, or any other HIC6H respirator approved for asbestos). MOTE: Employees Issued respirators Bust be Instructed as to the proper use, ease* and fit of the respirator.
MORE PRACTICES:
1. Mo asbestos scrap Mall be left on the floors, walkways, or equipment.
2. Mo blowing or dry-weeping, scraping, or sanding of asbestos seteriel or surfaces covered with asbestos-containing mtarial Mall be permitted.*
2. All disposable respirators end scrap asbestos seterlal Mall be placed and sealed in labeled plastic bags and disposed of at an approved sanitary landfill. (The plant or corporate Envircmantal Oontrol Departnant ahoald be oontaetsd for
Periodic acnitorlng will be carried out by* or under the direction of, the corporate Industrial Bygiane Department. Based on the results of the Monitoring study, any necessary naoinnendatlcns will be neds.
All asbestos-containing Material shall be kept thorouMly wetted, while bndling and/or rawing the aetaxial.
RMC0800260000477
SPECIAL BANDLZMC PROCEDURE C*
fhis procedure is for those products which, than hsndlsd or moved trm existing surfaces, say result in aa^osuros above the OBA standard. Bcanples of tie types of estarisls eovered szet Furnace and oven wall, door, and ceiling insulation and ateeipipe and boiler insulation. SPECIAL EQUXXMDtXi
1. labeled 6 sdl plastic begs with ties (available from local safety supply distributor).
2. If available, vacuisn cleaner equipped with special filter, to prevent re-sntrainoant of asbestos fibers into tbs work place.
3. Kerning signs indicating>ASBESTOS 1MMO.
MEDICAL MOOICKXNG:
Annually, personnel involved in the rwoval or handling of seterisls in this groiq> Shall be provided e physical examination, if ajqposures aatoasrl 0.1 fibers/oc. This examination shall include s chest x-ray, pulmonary fisietion test (FVC and FEV), end a oorplete history. FSSOAL noncnVE EQUXMENT:
1. Balf-tnack air-jxirifying respirator, equipped with a high efficiency filter (Dcanplas: KXX2SGN 11210, NORTON 17506, t6A COnfo ZX (4459440), or any other KXOSB-epprovad non-disposable zespirster. NOTE: Biplcyees issued respirators suit be instructed as to the proper use, ears, and fit of the respirator.
2. Disposable coveralls, head and foot coverings, and gloves Shall be provided to each atployae involved in the ctoroliticn, removal, and/or handling of asbestos insulation.
WORK PRACTICES:
1. Prior to beginning roioval or dmolltion of any asbestos material, caution sipis shall be placed around the work area, at a distance safety away Iran ny duet which say be crested. For large projects (l.e. furnaces, ovwns, boilers, etc.), the iansdiate work eras shall be ancloead in a plastic roan.
RMC0800260000478
2* A daccntaairiaticn area rttall fat astabliriwd, to allow tfat workers a pitot to dai and move tht personal fntaetlw oquipant.
2. PitrnatMt coveralls, gloves, and fattd and foot eovtrlngt afaall fat diapottd of in tht lahtlafl S ail plastic bags.
4. JU1 asbestos Insulation satarial rttall fat kapt thoccuily wettad, tdiile handling and/or moving tht aatarial.
5. Mo blowing oar dry swatping, senping, or sanding of akbestos aatarial or aurfaott couerad with asbestos-containing at* ttrial Shall fat pexalttad. there practical, the residual scrap aatarial on work surfaces should fat vacuoiad with a racial vacuon elaaner equipped with an HEW filter, to peasant re antrainoant of the asbestos fibers into tht tmkplaae. Otherwise, work surfaces should fae double^tt cleaned.
6. All senp aahrstna aatarial, as well as the disposable peracnal protective equipment, ahall fat placed and aaalad in a labeled plastic bag and disposed of at an approved sanitary landfill. (The plant or corporate Bnvixcmntal Control Department ahould be ecntactad for any pacifies.)
MOKTlCRSCs
1. Maasumwits of airborne asbestos fibers, during the handling and/or xaroval of asbestos aatarial, ahall be conducted by,
or wider the direction of, the Corporate Industrial Hygiene Departsamt.
2. Based cn the results of the senitoring study, the Corporate
Industrial Hygiene Department will make any necessary swoon-
aandatiens concerning additional acnitoring, anploywe notifi
cation and training, and ary changes in
protective
aquiptant.
RMC0800260000479
SPECIAL 1ANDLIAG PAOCEBOAE
P-
Bvis procedure cowers the Twriumi ilart work practises to be and when changing/installing brake rim.
1. labeled 6 nil plastic bags with lias (available at local safety svpply distributor).
2. Haavy-duty paper bowls or rags, for wiping brake drone.
MEDICAL SAKDA37CKS:
Annually, personnel lnvolvad in the xrovalor handling of aotarials in this gmp ahall be provided a physical examination, if exposures exoaad 0.1 fibers/oc. Shis examination shall include a chest x-ray, pulmonary twoticn test (TVC and FEV), and a complete history.
PBftSQOL PROTECTIVE BQUIMDITt
Half-mask air-purifying respirator (bcanplas: M 18710, 9900 Series, American Optical 41QS0, or any other HIOSH-epprovad respirator for asbestos). WK: Employees issued respirators Bust be instructed as to the proper use, care, and fit of the respirator.
MGRR PRACTICES:
1. All brake drone ahall be wiped clean, using e wet paper towel or rag. MO blowing or dry sweeping ahall be pexsdttad.
2. All disposable respirators, towels, and/or rags used to dean the brake drome ahall be pieced and sealed in labeled plastic bags and disposed of at an approved sanitary landfill. (The plant or corporate Emvircmemtal Control Department should be contacted for ary specifics.)
MOKnCftSG:
1. Measurements of airborne asbestos fibers during the removal, cleaning, and reinstallation of brake shoes ahall be oouctad by, or under the direction of, the Corporate Industrial Hygiene
2. Baaed on the results of the aonitorlng study, the Corporate Industrial pygiane Dapartnant will Bake any necessary recommendaticns concerning additional eonitaring, employee ratification and training, and any changes in personal protective equipment.
RMC0800260000480