Document JNXGLajKpGm3no4k458peJK4X
PROGRESS REPORT
JOB NO.
REPORT NO.
| PATL
ITfCHNICAI. SERVICES DEPT.
c. KNJMMRICH PLANT
[ 1716:246
I 93 (final) I 2 , 21/ 6!
W.G. KI1UMMR1CH PLANT
t. 1.. BOEHM
EJ 0. A. Meyer 'gl V. Brawley
RESEARCH ~~S~. 2nd.
Kgg R. H. Munch
GENERA.L 0T F ICE
R. E. BILGER *{]d. danna (4 )
others
H J.R."Ravage *Ec) w. R. KELLOGG
#B)j. M. CONNAUGHTON <|xj D. Fitzgerald 43 V.
jaeger w- p- DUNLAP
B J. Landwehr
[X] 1. W. DALTON C)r>- *- hfisler
s|x) G.
L.
Bratsch
Sc. E. ANAGNoSYOPOULOS Queeny
* D P. W. EDWARDS
n G.O.
T. M. Morrow ea P.orTJeGarmo HR. E. Howard El P.B.Benlgnus
fX) J. r. McClain
'B W. L. Rice *0 J.F. Quinn $. A. HEIN1NGER
G.R.Buchanan
) H. B. PATRICK *[XJw, J. WILSON jD. C . Armstrong
n
43 T.M. Patrick
P- B. HOSMER
*31 J .0.Bright
ELH. C. Carder *pC] J .C .Bryant -Ar
13 W.A.Kuhn-G.O. g] N. L. SAMPLE
*] H.S .Yates
'belli .B. Ray
n
n
K1 R . J . Stratmeye rKl W.R.Richard
* TO RLCtTVE DETAIL SECTION
nut: AROCLOR AND AROCLOR BLENDS: PROCESS IMPROVEMENT PLAN
ptHsoHNt.L: r. m. MoCutchan (T. E. Greenman)
pkoluem:
The objective of this report is to present the Dept. 246 (Aroclorc, Pyranols and Pydrauls) Process Improvement Plan.
SUMMARY
Savings of $14,000 and new earnings of $45>000 (B.T.) will be realized during 1968 as a result of increased capacity.
Ready for 1969 production will be a nevi continuous chlorination
plant with accompanying stills, earth treatment columns, storage
tanks, and increased blend capacity at a cost of $1.5M. Benefits
of the expansion will be:
_
1. Provide a total WGK Aroclor capacity of 70.OM lbs/yr which
will be sufficient to meet sales needs through 1972 with a
25/ excess domestically. Maximum capacity will be needed
by 1976-77. 2. Protect market by achieving corporate quality goals.
3. Ability to supply all customers with Aroclor from either
Anniston or WGK.
4. Lower maintenance costs.
t>. Increased profits will begin in 1970 with payout occurring
in 1974. (See "Appendix H" for manufacturing cost details.)
An estimated 3/4 man-years of TSD process time and 3-1/2 man-years
of PR & D time will be needed during 1968.
ACKNOWLEDGMEDS: Thanks to D. C. Armstrong, V. Brawley, D. Fitzgerald/J. A. Gloeck;ner, and H. F. Ray for their assistance
and cooperation in the gathering of data and writing of this
report.
,,
tz h
0130771
R. M. MeCutchan Technical Services Dept.
/jd
COMPANY CONFIDENTIAL INFORMATION This dcx-iimcnt is the property of Monsanto Company and the recipient is responsible for its safekeeping and disposition. It contains co.fi ton tin! information of Monsanto Company which must not be reproduced, revealed to unauthorised persons or sent outside the company with-vu proper author i* alien. Either retain in secure files or destroy.
';
' TOWOLDMONOQ45178
91570:246(1)
Page 2
2/21/68
DETAILS
1. Synopsis of Process
The Aroclor process consists of the following steps:
Chlorination - Batch chlorination of biphenyl (Bi0) with snift gas-(approximately 86 mole % CIe) at 150C produces Aroclor. The by-product is hydrogen chloride (HCl) gas.
Blowing - Crude Aroclor from the chlorinators is blown with air to remove excess HCl before distillation.
Distillation - Crude Aroclor which has been air blown is continuously fed to the stills. These stills are straight take-over type with no fractionation.
Earth Treatment and Filtration - The distilled Aroclor is earth (attapulgus") treated, filtered, and transferred to storage.
Blending and Loading - The finished product from the storage tanks Is loaded into cans, drums, tank trailers, and tank cars, or used for making blends (electrical and non electrical).
The principal Aroclors produced at WGK are 1242, 1248, 1254, and 1260. The last two digits indicate the % chlorine (weight) contained in the chlorinated biphenyl mixture (Aroclor).
II. Scope of Report
This report pertains to both the existing batch chlorination plant and the proposed continuous chlorination plant which is expected to be on-stream by January, 1969.
0130772
TOWOLDMONOQ45179
91370:246(1)
Page 3
2/21/68
III. TSD Process Job List
Prlority
Job
Capital
1 Install heat exchanger $8,000 on Project 5334 (app roved). Follow startup.
2
Coordinate quality tests
0
in conjunction with PR&D
effort.
3
Make nitrogen blanket
$1,000
system operable.
Determine biphenyl loss es under various chlorinator conditions. Recom mend conditions for 1968.
0
3 Design and install fume $7,000 removal system.
6 Investigate possible blend specification changes.
0
7 Check still operation
0
at pressure lower than
40 mm.
8 Evaluate level recorder $1,500 for still //2, install
if Justified.
9
Evaluate liquid nitro
TBD
gen supply system for
Dept. 246/254.
10 Evaluate automatic drum $200
flushing and drumming
300 M
installation with new
building.
11
Evaluate equipping jj1
$15,000
still with horizontal
pump and boildown
facilities
Savings/Benefits
EDC
Meet 1968 sales needs, insure $25,000 rate savings in 1968.
4/1/68
Protect $5 M market
3/1/68
Quality
Quality, minimize losses
4/1/08 5/1/68
Safety
6/1/68
Increase blend capacity 5/1/68 $l,000/yr in lab costs
Raw material savings
Quality
4/1/68
Process control
6/1/68
Lower nitrogen costs
4/1/68
$20,000/yr labor sav ings and quality Improvement.
Increase distillation capacity by 5 M lbs/ year
1/1/70
0130773
TOWOLDMONOQ45180
91370:246(1)
Page 4
2/21/68
IV. Capacity
A. Aroclor
1. Current Capacity
. Department 246 is rated at 2.5 M lbs Aroclors/month, or 2g.9 M lbs Aroclors/year. The department averaged 2.5 M lbs/month during 1967. Presently the bottle neck is chlorine availability and distillation rate.
2. Sales Forecast - WGK (H. J. Day, 9/7/67)
Aroclor
Made In 1967
TABLE I (M Lbs) 1968 1969 1970
1971
1972
1232 1242 1248 1254
1260 1262
22
12576 5593 6615 4813 154
16107 5049
4831 6638
125
19037 4596
5039 6953
135
21484
4571 5462
7345 145
23772 4447
5957 8l4o
155
25572 4861
6257 8485
165
TOTAL
29773 32750 35760 39007 42471 45340
Dept.Cap. 37200* -----New 40 M lbs/yr Plant ---
Based on installation of still preheater and increased Cl2 rate.
3 Capacity to Meet 1968 Sales
Current department capacity is not sufficient to meet 1968 sales needs. Capacity Increases are planned in both the chlorination and_distillation steps to an overall capacity of 37*2 M lbs Aroclors/year, or 3.1 M lbs/month.
a) Chlorination
1. Project 3824 installs a 6" chlorine feed line to Dept. 246 (EDC 3/1/68).
2. Project 4864 increases chlorine revaporization capacity (EDC 3/1/68).
3- The Brink's mist eliminator elements will be ' replaced to reduce yield losses in the off
gas.
4. In-line specific gravity instruments are needed, and will be installed in the continuous chlorina
tion plant.
0130774
TOWOLDMONOQ45181
91370:246(1)
Page 5
2/21/68
IV. Capacity (Continued)
A. Aroclor (Cont'd)
b. Distillation
Project 5334 installs a spiral heat exchanger to preheat the still feed . (EDC 5/1/68). This gives a 10^ surge capability and insures needed production until the expansion is complete.
4. Storage Capacity, M Gal
Product
Present Capacity, After Blending Project Complete
TABLE II
1968 Add 5 Tanks & Remove Un'gd
1971 Add Three
Tanks
Minimum 1971 Storage Recom. By H. J. Day,
6/67
1242 124 8
1254 1260
55 20 20
30
80 l4o 152.0 40 40 25.2 40 4o 54.4 20 20 20.2
TOTAL
125
180
240
211.8
All new tanks will be 20,000 gallon aluminum tanks with nitrogen blanket facilities.
B. Aroclor Blends
1. Current Capacity
Dept. A-246 is rated at 1.2 M lbs/month Pyranols (14.4 M lbs/year) and B-246 at 0.575 M lbs/month Pydrauls (6.9 M lbs/year). However, the Pyrariol capacity can not be achieved because of lack of mix tank capacity. During 1967 these blends were produced while operating at near capacity:
Pyranols:
1260 PPO 1254 PPO
A15B5B
Pydrauls: A-200 280
TOTAL BLENDS
'
1967
4,958,639 3,099,362 1.199.190 9.237.191
2,454,515 191,772
11,885,278
0130775
TOWOLDMONOQ45182
91370:246(1)
Pago 6
2/21/68
IV. Capacity (Continued)
B. Aroclor Blends (Cont'd)
2. Future Capacity and Sales Forecast
Project 2844 (EDC 7/1/68) provides for changes and additions to loading and transfer lines, metering
facilities, and the conversion of No. 8 storage tank to No. 3 mix tank. This will increase mix tank capacity from 27.5 M gal. to 47-5 M gallons, and should make possible capacities of 24.0 M lbs/ year Pyranols and 6.9 M lbs/year Pydrauls.
Aroclor Blend Sales Forecast, M Lbs.
' [HTT: Dly, 9/26/67)
TABLE III
Pyranols:
Expanded Capacity 1968
1269
1970
1971
1972
Inerteen PPO (1260) lnerteen 54201 KA Pyranol A13B3B
7200 2000 1736
7500 8000 1800 1950 1800 _i9_oo
8700 2100 2200
9200 2100 2200
TOTAL PYRANOLS 24000 Pydrauls:
10936 moo 11850 13000 13500
Pydraul A-200 Pydraul 280
TOTAL PYDRAULS
TOTAL BLENDS
C. Drumming
69OO 30900
2340
1700 24o
1600 280
1100 320
1100 350
2537 1940 1880 1420 1450
13473 13040 13730 14420 14950
1. Current Capacity
Drumming is done on two shifts, one standard operator per shift, 5 days per week. The standard operator also helps load trailers and tank cars (25/ of time). During the 12 month period, June 1, 1966 - May 31, 1967, the following drums and cans were filled: (sec Appendix A for detailed drumming report.)
TABLE IV
0130776
Size
55 Gal. 30 Gal. 5 Gal. Total
Aroclors Blends
TOTALS
7221 8249
15470
0 540
540
569 2148
2717
7790 10937
18727
TOWOLDMONOQ45183
91370:2^6(1)
Page 7
2/21/68
IV. Capacity (Continued)
C. Drumming (Cont'd)
1. Current Capacity (Cont'd)
Grand Total: 18,727 drums and cans Average Output: j6 drums and cans/man/shift
2. Future Drumming Needs
table V
Total Production, M Lbs
__ 1967
1972 (Sales Forecast)
5 Year % Increase
Aroclor Blends
29.8 11.9
45.3 14.9
52/ 23/
On the assumption that drumming requirements increase proportionally in 1972 with total production, 26,600 drums and cans will be needed. By adding one man on third shift drumming, these needs can be met with an average output of 34 drums and cans/man/shlft. After 1972, a seven-day operation may be needed.
If drumming requirements increase sharply, a more auto mated drumming facility might be considered. (A rough estimate of such an installation including building is $200-300 M) Another source of justification for an automated system is the possible need of a drum flushing system for improved "as packaged" quality. Anniston TSD has the assignment of determining total company needs for maintaining Aroclor quality while packaged. Results of their studies will dictate drumming needs for future quality requirements.
I). Tank Car and Trailer Loading
The following table shows the number of tank cars and trailers loaded during June 1, 1966 - May 31, 1967, and the projected loadings for 1972:
TABLE VI Number of Trailers or Cars
013077?
Tank Cars: Aroclors Pyranols Total
Trailers: 95% Aroclors 5/ Pydrauls
6/66-5/67 72
if
197
1972
111 125 m
300
TOWOLDMONOQ45184
91370:246(1)
Page 8
2/21/68
IV. Capacity (Continued)
D. Tank Car and Trailer Loading (Cont'd)
The existing loading facilities plus the two unloading docks included in the proposed plant expansion (CKA 1800) will be adequate through 1972.
E. Raw Materials
'
The following raw materials will be needed based on sales forecast.
TABLE VII
(M lbs)
1968
1972
Biphenyl Chlorine TCB TTCB
18.0 M lbs 34.1 3.5 0.9
25.2 M lbs
46.6 4.3 1.2
on - Continuous Chlorination (CEA - 1800)
1. Scope
a) Five new 22,000 gallon aluminum storage tanks
(EDC 7-1-68).
b) Railroad spur and two unloading docks
c) One 100,000 gallon biphenyl storage tank
d) Three existing 15,000 gallon underground tanks
will be dismantled
e) Separate transfer lines for each product from
day tanks to tank farm, and from tank farm to
loading or drumming areas.
f) Chain of four ehlorinators with external cooling
and continuous feed tank (EDC 12-1-68)
g) Continuous blow tank and Intermediate storage tank
h) Two semi-continuous distillation systems
I) Pour continuous porocel column treatirient systems
J) A complete therminol heating system
k) Additions to the existing control room including
instrumentation
l) Electrical substation changes to supply power
mj Motor control center
n) Foreman's office
.
0130778
TOWOLDMONOQ45185
9X570:246(1)
Page 9
2/21/68
IV. Capacity (Continued)
F. Expansion - Continuous Chlorination (Cont'd)
2. Justification for Expansion
' a) Provide a total WGK Aroclor capacity of 65.0 M lbs/year which will be sufficient to meet sales needs through 1972 with a 40$ excess at WGK.
b) Protect market by achieving corporate quality goals as follows:
1242
1254
Q Resistivity, x 10 ohrn-cm 10,000
15,000
Power Factor, %
0.6%
O.J>%
Thermal Chemical Chloride <0.1
<0.1
ppm
c) Ability to supply all customers with Aroclor
from either Anniston or WGK.
d) Lower maintenance costs.
e) Increased profits will begin in 1970 with payout
occurring during 1974. At maximum capacity in
the new plant, profits (B.T.) will be approximately
$2.0 M/year over profits at maximum capacity in
the old plant. If the Aroclor sales growth
pattern continues, and with only a small increase
In Anniston Aroclor capacity, maximum WGK capacity
of 70 M lbs/year will be needed by 1976-77- If
a 25^ surge capacity is required, further expansion
should be anticipated In 1972-73.
3. Capacity
After the continuous chlorination plant is on stream, all biphenyl will be chlorinated to the 1142 level in the new plant. It will then be chlorinated to the 1148, 1154, and 1160 levels in the batch plant. In 1972, based on H. J, Day's forecast of 9/7/67, the capacities and requirements of each plant will be:
a) Chlorlnator Capacity, M lbs/year
TABLE VIII
Maximum Capacity 1972 Sales Based on 1972
Forecast Product SdIU
For Internal Use:
Continuous System (1142) For Sales:
Continuous System (1142)
15-9 25.6
0130779
TOWOLDMONOQ45186
91570:21)6(1)
Page 10
2/21/68
IV. Capacity (Continued)
F. Expansion - Continuous Chlorination (Cont'd)
5. Capacity (Cont'd)
Maximum Capacity 1972 Sales Based on 1972
Forecast Product Split__
For Sales (Cont'd ) Batch System using 1142 as feed for 1148, 1154, and 1160
19.8
9.0
Batch System using Biphenyl as feed for 1148, 1154, 1160
0 __ _
24.5 _____
Total Aroclors For Sales
45-4
70.0
b) Still Capacity, M lbs/year
Still No.
Product __________
TABLE IX
1972 Sales Forecast
Maximum Capacity Based on 1972 Product Split
1 2
5 (new) 4 (new)
1260-62 Boil-down 1242 1242 1248
1254
only,
8.6
all aroclors 25.0
0.6 4.9 6.5
Total Aroclors
45.4
Boil-downs 20.0 25.0 10.0 6.5 8.5
70.0
V. Quality
A. Goals
The following Aroclor quality goals were set at the corporate Aroclor meeting held on May 9-10, 1967:
1242
Resistivity x 10^ ohm-cm
Power Factor, / TCC, ppm
10,000
0.6 <0.1
1254
Resistivity x 10^ ohm-cm
Power Factor, %
TCC, ppm
'
15,000
0.5 <0.1
01307B0
TOWOLDMONOQ45187
91370:2*16(1)
Page 11
2/21/68
V. Quality (Continued)
B. 1967 Aroclor Quality
In December 1966 the removal of the catalyst baskets from the chlorlnators was completed at W.G.K. No other normal operating conditions have been changed.
During 1967 the only quality shift has been an Improvement in the electrical properties of both 12*12 and 1254 during the third quarter. This is unexplained. Normal quality ranges have been as follows:
TABBE X
1242: 1254 :
W.G.K. - 1967 - In Plant Analysis
1907 Normal Range
B/67-II/67
Average
Spec
Resistivity x 10^ ohm-cm Power Factor, % TCC, ppm
1,000-10,000 0.5-3.0 0.45-0.6
6,000
0.7 0.49
500 5-0
0.65
Resistivity x 10^ ohm-cm
Power Factor, % TCC, ppm
5,000-40,000 0.2-1.0 0.6-1.0
40,000 0.2
0.8
None None None
For a complete storage tank analysis record of Aroclor 12*12 and 1254, see Appendix B.
C. Batch Quality Studies and Recommendations
Since early in 1967 there has been a concerted effort to improve Aroclor stability and electrical properties. This is a corporate effort headed by D. C. Armstrong of
W. G. K., PR & D. It was initiated by the realization that Monsanto's Aroclor was surpassed in quality by foreign competitor's products.
The following quality factors have been considered and/ or Investigated: (For a complete report of PR & D batch work, see J. A. Gloeckner's progress report 91370:3794(1).)
1. Chlorination
a) Higher temperature chlorination will improve Aroclor quality. Four storage tanks of 1242 have been made at 195C with an average 0.30 ppm TCC. The normal material made just prior to the tests averaged 0.45 ppm TCC. Optimum temperature has not been determined.
01307B1
TOWOLDMONOQ45188
91370:246(1)
Page 12
2/21/68
V. Quality (Continued)
.
C. Batch Quality Studies and Recommendations (Cont'd)
1. Chlorination (Cont'd)
b) Higher ferric chloride concentrations (0.2/) are beneficial-atT/iO^C. \At 200"C, the benefit is doubtful.
c) Catalyst particle size was checked and found to vary considerably. ("See Appendix C).Pennsalt is the only supplier of anhydrous ferric chloride and they do not attempt to control particle size.
d) Biphenyl quality is an important variable under normal conoitTons. At higher temperature or catalyst level the effect of biphenyl quality is greatly reduced.
e) Initial reaction temperature does not affect quality as long as it is at least 120C.
f) Bromine was added to the chlorine to a 700-800 ppm level and used to make a storage tank of 1242. At reaction conditions of 195C and 8 lbs. FeCls/batch, a TCC of .047 was obtained. This material was life-tested by Electric Utilities and approved.
g) Sparger design has been changed to give better chlorine distribution and to prevent catalyst settling. Resulting quality data has not been obtained .
b) Off-gas condensate is not suitable as a raw material for electrical grade Aroclor, but could be used for non-electrical grade. Off-gas losses increase by five times when increasing the reaction temperature from 150C to 195C. Cost of yield loss, will increase by $30,000 for production of 30 M lbs.
Conclusion: Only one change can be recommended to improve Aroclor quality in the chlorination step. A temperature of 195C should be used.
2. Filtration of Crude Aroclor
If catalyst concentrations higher than 0.05/ are used,
the undlssolved ferric chloride should be removed
before distillation. A centrifuge installation would
cost $25-40,000.
.
0X30762
TOWOLDMONOQ45189
91370:246(1)
Page 13
2/21/66
V. Quality (Continued)
C. Batch Quality Studies and Recommendations (Cont 1 d )
3. Distillation
, a) A lime charge equivalent to 0.8/ of the chlorination mass should be used (present practice),
b) For good process control, a level recorder is
recommended for No. 2 Still. Especially during boil-downs, guess work risks line pluggage and considerable downtime.
4. Earth Treatment vs Porocel
In the present plant, 20 lbs. of attapulgus earth
is mixed into a blend tank of distilled Aroclor for 30 minutes and then filtered to a finished product tank. Varying amounts of earth and porocel were
tried, but no significant quality difference was noted. Power factor was measured on a temporary in line instrument.
5. Storage and Transfers
a) All Aroclor storage tanks should be 21-25,000 gallon aluminum tanks with a nitrogen blanket. The existing nitrogen system does not work and is being checked for modifications. It will be operable by 4/1/66.
b) Separate aluminum transfer lines should be available for each aroclor product.
D. Continuous Chlorination Recommendations
WGK PR & D recommends the following process conditions
be used in the continuous chlorination Aroclor plant
expansion:
'
1. Chlorination
a) Biphenyl
Biphenyl will be monitored for water content. If high levels (80 ppm and above) are encountered
frequently, the biphenyl should be dried with a molecular sieve prior to chlorination.
0130783
TOWOLDMONOQ45190
91370:21)6(1)
Page 14
2/21/68
V. Quality (Continued)
I). Continuous Chlorination Recommendations (Cont 1 d)
TABLE XI
Temperature
Min. Temp.
Max. Temp.
Biphenyl Feed Tank Chlorlnator 1
2
3 4
100 C 140 150 170 190
120C 160 170 190 210
c) Catalyst
Use 0.1$ FeCl3 having a mesh size specification
of 50$ less than 15 microns and 100$ less than 50 microns. Direct addition of the catalyst to the chlorinators is being explored. No baskets are to be used.
d) Yield Losses - Based on laboratory continuous
chlorinations, vapor losses are expected to be 2-3 times that experienced at the Anniston Plant. This material should be used for non-electrical grade Aroclor production. e) Circulation rate should be as high as possible compatible with good maintenance (narrows isomer distribution).
2. Crude Aroclor (1142) Storage
a) Temperature should be as high as possible, 150-190UC minimum.
b) Residence times should be as long as possible with a 12 hour'minimum. The new intermediate storage tanks are sized for a 48 hour residence time.
c) The catalyst present Improves stability. d) Agitation is recommended for optimum contact of
catalyst and 1142. It will also minimize catalyst build-up in the tank. e) HC1 removal will be accomplished by maintaining a mild vacuum (650 mm absolute) on the 1142 storage tank. Further work will determine if this is necessary. Air blowing is not recommended.
0130784
TOWOLDMONOQ45191
91370:21)6(1)
Page 15
2/21/68
V. Quality (Continued)
I). Continuous Chlorination Recommendations (Cont'd)
3. Distillation
a) Lime charge of 0.8/ adequately handles up to 0.2/ catalyst concentration.
b) Pressure is not very critical, but the lower the better. Starting with the same crude and distilling to the same yield, pressure and TCC are related as follows:
TABLE XII
Pressure
Temperature
TCC
5 mm 1)0 60
190C 240 280
0.22 ppm
0.27 0.J2
c) A forecut of 1/ will result in an improvement of 0.01-0.03 ppm TCC, independent of earth treatment method, chlorination conditions, or ageing. The forecut could be added to the condensate from the chlorinators and used for non-electrical
Aroclors. Present plant expansion does not anticipate making this forecut. Further PR & D Investigation is scheduled.
1). Earth Treatment
Use porocel columns as demonstrated at Anniston.
5. Future Work
.
ED
a) Assist in plant demonstration at Anniston using 5/lA
chlorination conditions of 190-195C in the third
chlorinator and FeCl3 added to each mix tank.
Evaluate results. (Test scheduled for 3/11/68).
b) Define where FeCl3 should be added (pending
1)/l/6
Anniston demonstration).
c) Determine necessity and means of HC1 removal
3/l/t
from crude.
d) Investigate effect of water and trace impurities 9/1/C
in:biphenyl on Aroclor stability. Monitor H2O
level in department biphenyl storage.
e) Monitor bromine content of department chlorine. 3/1/1.
f) Evaluate additional routes for improving
9/1/t.
Aroclor stability.
0130785
TOWOLDMONOQ45192
91370:21)6(1)
Page 16
2/21/68
V. Quality (Continued)
E. Aroclor Blends
Specifications are normally met on all Aroclor blends, but sometimes with great difficulty. The following conditions hinder the production of high quality blends:
1. General
a) The blend tanks are inadequate in size and TTCB storage non-existent. Project 28QH will provide a third blend tank (20,000 gallons). It is recommended tint one of the underground storage tanks (15,000 gallons) be retained for TTCB storage.
b) There is only one supplier (Hooker) of TCB and TTCB. These raw materials have poor electrical qualities and are difficult to clean up.
c) To aid in the mixing process, the blends are blown with plant air. This is not a good practice and an alternate method should be used.
d) Earth treatment of the blends does little good, sometimes degrading the electrical properties. During 1967 earth treatment of 126c PPO and 1251) PPO has been stopped. Less difficulty in meeting specifications has resulted.
e) The chloride scavenger harms electrical properties.
2. Specifications
a) Pydrauls - No problems b) 1251) PPO - No problems c) IS60 PPO - Two causes make the specific gravity
and refractive index specification difficult to meet: (1) The specifications for the blepd are
narrower than for the components. (2) The specific gravity and refractive index
specifications do not correlate well with each other. The per batch average is three blend adjustments and eight control sample analyses. This means increased lab costs, but more importantly, delay in shipments, below minimum drummed inventory, and poor TCB and TTCB yields.
A program to correct this problem was set up in 1966 by Don Harris and Bill Caraway, but was dropped after preliminary work because the dollar value was low ($10-12M/year). Completion of this work is still needed as the time factor becomes more important and blend sales increase.
0130786
TOWOLDMONOQ45193
91370:2116(1)
Page 17
2/21/68
V. Quality (Continued)
E. Aroclor Blends (Cont'd)
d) A 13 B 3 B - This blend suffers from the same specific gravity and refractive index problems as does 1260 PPO. In addition, blends must be adjusted with 1260 since there Is no TTCB storage. Finally, because of the poor quality TTCB, the electrical property specifications are difficult, and occasionally impossible to
meet. Five electrical property checks and seven specific gravity and index analyses are made on an average batch.
VI. Yields
A. Biphenyl
TABLE XIII
Year
Actual Yield
Standard
1964
1965 1966 1967
96.57/
98.39 98.66 98.30
97-0/
The yield loss is in the off-gas condensate and is worth $7,000 in 1968 when chlorinating at 150C and $37,000 when chlorinating at 195C. In the continuous chlor ination plant this material will be used in the feed stream when producing non-electrical grade Aroclor.
B. Chlorine
Chlorine usages are calculated by the chlorine department and therefore are not a meaningful gauge to the Aroclor Department operations.
C. TCB and TTCB
TABLE XIV
Actual Yield 1967
Standard
TCB TTCB
98.23 94.11
98.0/ 98.O
The yield losses are worth $10-12 M in 1968 and are due to lack of TTCB storage and mix tank capacity.
0130787
TOWOLDMONOQ45194
91370:246(1)
18 2/21/68
VII. ManUfacturlng Costs (Year 1967)
Total cost variance on the Aroclor production and blending operation was (-) $9,298 for 1967. The following items represent the larger cost variances:
A. Compressed Air Act $12,132 Sch $6,007 Var (-) $6,129
Compressed air is pro-rated to the using departments.
B. Supplies
Act $17,381 Sch $22,543 Var $5,162
Supply costs appear normal and are itemized in Appendix D.
C. Packing Containers '
Act $120,886
Sch $113,295 Var (-) $7,691
A larger than expected percentage of Aroclor and Ardor blends are being sold in drums.
I). Laboratory
Act $35,995 Sch $31,772 Var (-) $'1,223
As noted previously, many control samples are analyzed in achieving blend specifications.
E. TSI), Experimental, and PR & D
Act $107,635 Sch $30,794 Var (-) $76,841
Since early in 1967, an Intensive program has been planned and pursured in an effort to improve Aroclor quality.
F. Mechanical Expense
Act $129,008 Sch $192,778 Var $63,770
A plant expansion expected in 1967 which did not materialize causes the large positive variance.
Mechanical expenses and downtime during 1967 were above 1966, but in line with 1964-65- Other downtime results primarily from low chlorine pressure. This should be corrected with the completion of projects 3824 and 4864.
For a summary of 1964-1967 mechanical expense and downtime, see Appendix E.
Appendix F itemizes the mechanical expenses for 1966 1967. Pumps continue to be a source of high maintenance costs. It is recommended that all new pumps installed be equipped with mechanical seals. Replacement or modification of existing pumps to pumps with mechanical seals will be evaluated.
0130788
TOWOLDMONOQ45195
91370:21t6(l)
Page 19
2/21/68
VII. Manufacturing Costs (Continued)
F. Mechanical Expense (Cont'd)
Appendix G lists all projects currently pending, or completed during 1967.
VIII. Stream and Air Pollution
The principal stream pollutants from Dept. 2^6 are biphenyl and chlorinated biphenyl. These are sewered at a rate of 700-800 lbs/day and are not considered a pollution problem. The sewering of this material will be eliminated with the Aroclor plant expansion by January, 1969.
The principal air pollutant is HC1 gas. This is minimized by drowning the blow tank vapors.
0130789
TOWOLDMONOQ45196
APPENDIX "A" DRUMMING OF AROCLOR & BLENDS, 6/66 - 5/67
Procj ^
'Tlyrj0 Corl`tS.inS2? J
t 55 i
Gallons
30
June 1966
5
55 30 July
5
55 5 Aug.
| 55
1
30 Sept.
1232
1
1242
i
1248
!
1254
;
1260
i
1262
;
A 13 3 3 B ; 1254 PPO i
1620 PPO ;
PYD A-200
: :
PYD A-280
| ;
1254 4. 10^ XYL
j i
THERM 1 THERM 2 THERM 3
i :
88 985 138 249 196
40
39 36
64 16.
302 158 510
66
251 7 95 22 91
203
22 i 40 i 192
402
i 19 i 352
! 96 1
i j
-P? CO
50 .
195 20
183
132 297 153
377
60
148
j 42 ; 104
76 ;
! 190 4i
5 61 255
4
TOTALS
1696 64 91
1656 29
66 : 1641
162
1475
148
320
0130790
TOWOLDMONOQ45197
APPENDIX "A" (CONTINUED) DRUMMING 0? AROCLOR & 3LENDS, 6/66 - 5/67
Pr'od .
>e Container,
Gallons
v 55
30
Oct. 1966
1232 1242 1248 1254
1260 1262
A 13 B 3 3 1254 PPO 1260 PPO
j i j !
1 i
; i 1
150 345 23
216
?yd A-200
; i 366
PYD A-2 80
1254 + 10Y XYL
THERM 1
THERM 2 therm 3
: 59 : 70
5 55 30 Nov.
1
231 12 142 178 91 1
231
39 52
5 55 5 Dec
. 138 ; 84
35 354
1034
' 170 64
: 161
174
200 52
174
55 30 Jan. .
120 221 24 58 70 134
116
152
39 28 75
100 50'
TOTALS
: 1229
142 834
1069
1319
252 ; 1037
15c
0X30791
5
32 103
TOWOLDMONOQ45198
APPENDIX "A" (CONTINUED)
DRUMMING OP AROCLOR & BLEEPS, 6/56 - 5/67
Prod.
Type Container
Gallons
55
5i
55
30
FE3.
MAR.
1232
; 41
1292
176
1248
! 108
12 P 4
i 139
1260
1262
: 37
A 13 3 3 3 1254 PPO
2
1260 PPO
143
PYD A-200
223
53 :
92 72 250
30 14 15 74 -255
60
PYD A-280
1254 105 XYL
THERM 1 THERM 2 THERM 5
39
16 110
38
52 90 16
5 55
30
APRIL
18 104
448
52 35 1
l4l
224 i :
112 193 16 4 4
5 55
98 201 36 456 53 130 151 158
| 34 1 14
30 MAY
99
5
71 175
55 30 5 TOTAL
63 1560
1039 4456 24
79 1571 244
1790
4l6
453
37 50 '
l84g 10 203
2766
212
23!
480 36 825 34 190 16
TOTALS
1029 127 969 15 16 ; 1287 35 123: 1208 99 246 55 Gal. 15.970
0130 79^
50 Gal, 5 Gal,
0^ J 2 , v17
TOWOLDMONOQ45199
APPENDIX B ANALYSIS ELECTRICAL GRADE 1242
Spec.
Mo., 1967 Lot No.
January
February i
March April May June July August September October
November
KI401 4 02 4 OJ 4o4 406
407 4o8 411 412 415
417 421 422 423 427 428 431 436
437 440 444 447 448 451
455 456
457 459 462
465 469 471 472
475 476
477 480 482
December
January 1968 February
485 488 489 492
493 494 KK4 02 403 4o6 4o8
O.65 max.
500 min.
TCC Resistivity x 10^
0.25 O.29 0.30
0.37 0.41 0.49
0.51 0.45
0.33 0.59 0.4o 0.28 0.34 0.45 0.47 0.52 0.48 0.32 0.36 0.62 0.61
0.53 0.28
0.59 0.55 0.49 0.47
0.55 0.63 0.46 0.47
0.38 0.30 0.44 o.4i 0.26 0.50
0.37
0.53 0.64 0.35 1.81 0.40 0.35
0.34 0.37 0.35 0.50
1850 3950 2000
600 800 600 1030 3200 2040 1600 960 700 680 900 1600 880 750 2150 1300 4240 2500 3250 2880 2620 20 4 0
7489 5000 2560 2610 lo4oo 6900 22400 13600 13690 7350 13750 4000 8000
2000 1300 1450 1545 2500 2880
1320 10600
1880 1900
.
5-0 max. P.F.
Comments
0.66 0.82
Normal operating conditioi
I.83 2.20 1.29
2.64
4.44
unless otherwise noted. (150C, 2 lbs
FeCl3)
0.90
All other mat-
0.76
erial sold as
1.80 3.00
non-clectri ca'
3.03
2.37 3-38
1.62
3.06
1.86
0.26
3.24
0.66 0.84
O.85
0.81 -- (195C,8 lbs
0.89
Fe C13 )
1.39
0.31 I.56 -- (195C, 8 lbs
0.99 0.94
FeCl3 700800 ppm Bra)
0.52
0.78
0.40
0.36 -- (195C, 2 lbs
0.23
FeCl3)
o.4o
0.24 ---(195C, 2 lbs
1.26
FeCl3)
0.19 -- (195C, 2 lbs
1.74 2.64
FeCl3)
2.96 -- (195C, 2 lbs
4.41
FeCl3)
2.46 -- (195C, 2 lbs
1.23
FeCl3)
2.49 0.66 1.53 2.27
0X30793
TOWOLDMON0045200
APPENDIX B (Continued)
ANALYSIS ELECTRICAL GRADE 1254
Spec. - No plant specifications.
Mo., 1967 Lot No.
TCC Resistlvitv x 10^
P.F.
January
February March
KI 601
604
605 606
April May
607 609
613
June
616 ' 618
July
619 621
August
623 623
September October
628
631 632
November
633 634
December
636
January 1968 February
637 KK-
602
605
0.69 0.63 0.68 0.69 1.00 1.07 1.00
0.99 1.19 O.89 O.96 O.79 1.06 1.05 0.50 O.67 0.85 1.34 1.24 0.82
0.85 0.57
8800 510
5450 4o8o 22000 1200 104 00 22400 6650 5900 64oo 36020
24015 43250
8oo46o 160000
4l6o 13500
6950 8805
2650 16000
0.63 4.12
1.06 0.90 0.24
2.53 0.49 0.29
0.31 0.63 O.78 0.14
0.15 0.23 0.11 0.20 0.31 0.43 0.76 0.70
1.44 0.31
Comments.
Operating con ditions were 150C, 2 lbs FcC13.
0V30''<,``
TOWOLDMONOQ45201
APPENDIX C FERRIC CHLORIDE PARTICLE SIZE Particle size was determined by St. Louis Testing Laboratories, Inc.
Plant
Date Sample Tested
Per Cent less than 1 micron Per Cent less than 5 micron Per Cent less than 10 micron Per Cent less than 20 micron Per Cent less than 50 micron Per Cent less than 100 micron
WGK 5/8/67
Anniston 5/25/67
----- '
17. *1 4o.6 85-5 96.1
6.6 24.5 42.5 95.4
---
WGK 7/6/67
Anniston 7/6/67
5.4
69.9 91.4
-- --
---
___
8.5 21.8 60.7 89.7
0130795
TOWOLDMONOQ45202
APPENDIX D SUPPLIER
Items over $200 bought from the storeroom during 9 months of 1967:
Filter paper. Sparkler Glass bottles, 5 pt. Oakite cleaner Seals (labels) Filter cartridges Soaps and detergents 16 oz. bottles and caps Kerosene Filter cartridges, Alsop Pressure gauges Rags Steam hose 5-2'' flanged tees, 4 gate
valves
$662,50 607.52 502.26 475.00 462.00 551.88
535-95 277.20 272.00 245.46 244.86 221.61 240.00
The above items account for about 50$ of the total supply cost. The balance is made up of non-repeating items bought through the storeroom and through purchase orders.
0130796
TOWOLDMONOQ45203
APPENDIX E
SUMMARY OF TRUE REPAIR, MECHANICAL EXPENSE, AND DOWNTIME FOR 1964 - 1967
CateRory True Repair . Mechanical Expense Repair D. T. Process D. T. Total D.T,
1964
1965
1966
$80,404 $82,302 $70,450
116,834 100,379 88,592
1.92$ 2.93#
Of
3.29
2.00
0.46
9.03
9.20
2.76
1967 $
129,008 3.1356 4.48 10.50
0n7q7
TOWOLDMONOQ45204
APPENDIX F
Category
Pump
Furnace
'
Dept, repairmen
Instrument
Ejector
Platform
Plant Improvement
Work to Assist
Tank, Closed
Piping
Electrical
Miscellaneous
All Others
Total M.E.
MECHANICAL EXPENSES, 1966-1967 YTD (JULY)
1967 Thru July
$10,571 1,584
.4,799 5,539 2,030 15,338 8,684 5,702
575 2,844
686 1,820 4,236
% of
'
Total M.E.
17.0# 2.2
7-7
5-7 3-3 24.7 14.0 9.2
0.9 4.6 1.1 2.9
6.8
1966
$10,048 1,844 8,560 7,340 2,554
13,208 9,132 9,124 . 2,647 8,722 4,351 3,439 7,623
$62,208
$88,592
% of Total M.E.
11.3$ 2.1
9-7 8.3 2.9 14.9 10.3 10.3 3-0 9-8 4-9 3-9 8.6
0130798
TOWOLDMONOQ45205
APPENDIX G PROJECTS CURRENTLY PENDING
OR COMPLETED DURING 1967
Engr. Auth. No.
Est. No.
5334 2844
Date A,_
8/67 4/66
Description
Install heat exchanger Blending & Loading
Facilities
Cost
$ 8,000 60,000
S-842 S-892 S-893 S-670
S-650
5639 1138
4263 4467 4448
4871 5018 5411 3446
3528 2698
10/67 12/66
1/67 3/67 4/67 4/67 5/67 8/67 7/66 7/66
12/65
Relocate TCB Dock
Install alarms on chlor. Dism. gravity Instrument Replace steel & handrails Replace vacuum Jet Install Exp. Filter P.M. painting steel P.M. Insulation repairs Install safety showers Alter shower tracing Alter three loading docks Dismantle & replace
lean-to
2,100 3,450
500 18,810
4,620 2,600 23,380
5,375 2,700 1,000 5,700 30,500
Upgrade control room
4,000
S-647 S-7060 M-6049
R3771
8/66
M-5034 3491 8/66 Minor
Upgrade office Upgrade lighting Relocate 6" fire
protection line Roof over loading dock Install mech. remote
Ram valve Install spare #2 still
pump
6,000 8,000
Status
EDC 2/1/68 Given to CED for construction; mat'l being ordered. EDC 7/1/68
Comp. 8/67 Complete Complete Complete Complete 6/67 Complete Complete Comp. 5/67 Comp. 5/67 Complete Held up pending study of drumming required. Held up pending department expansion by CED. Est. sub. 8/67
Complete 5/67
Complete 2/67 Scheduled for December 1967 T/A Estimate submitted
0i307'`
TOWOLDMONOQ45206
APPENDIX H
Using the cost standard prepared by H. F. Ray for the expanded Aroclor plant operating at a maximum capacity of 70 M lbs/year, the following manufacturing costs and net profits/year were calculated:
Sales Forecast, M lbs.
Unit Mfg. Cost
Net Profit (B.T.) M $
Increased Profit _ Compared to 1968, M $
1968 Ig6 1970 ' 1921 1221 1976-77
32.75 35.76 39-01 42.47 45.34 70.00
$6.84 $7.66 $7.^7 $7.29 $7.16 $6.48
1.59 1.45 1.65 1.87 2.06
3.65
-- ~0.l4 0.06 0.28 0.47
2.06
Payout should occur during 1974.
Assumptions:
1. Average sales price of 15.0^/lb.
2. SARE of 22%. 5. Salary and wage increase of k% annually over 1968.
A. 1967 prices on biphenyl and ferric chloride, 1968 prices on other raw materials.
5- Depreciation based on addition of 1.5 M $ capital with 12 year life.
6. Addition of four operators, one packer, and one foreman.
7. Biphenyl yield of 97$; chlorine - 93$.
0130800
TOWOLDMONOQ45207