INTERNAL CORRESPONDENCE
UNION CARBIDE CORPORATION technical center
P.O. BOX 8361, SOUTH CHARLESTON. WV 25303
W. L. Browning J. W. Perry, Jr. Institute Plant
h < October 20, 1981 oIH/EP
C. W. Carman M. L. Mills L. R. Noble D. R. Paugh R. E. Peele
H. H. Frazier
R. J. Sexton, M.D.
F. Williams
Asbestos Monitoring in Gasket Shop, 512 Construction
Gentlemen:
Attached are the results of the area and personal exposure monitoring done for asbestos in the Gasket Shop - laundry. Building 3 of the Construction Department, Institute Plant. This monitoring was done by the Institute Plant Industrial Hygiene group on October and 9, 1981.
2,
The last for that the 2 fibers
gasket cutting is done infrequently and it would generally a short period of time. The results of the survey indicate asbestos exposure in excess of the permissible limit of per centimeter cube of air did not occur.
The workers wore a respiratory protective device while working with the gasket material. It is emphasized that all workers continue to follow this practice while working in the area during gasket cut ting. Please notify the monitored workers of their exposure results.
If I can be of further assistance, please give me a call at extension 3750.
Very truly yours,
MAP/sc Attachment
Manhar A. Patel
UCC 008967
AU405
*
ASBESTOS MONITORING CONSTRUCTION GASKET SHOP INSTITUTE PLANT
# Name/Area Monitored Date
Sampling Time Minutes
Asbestos Cone. Fibers >5 pm/cm^
1 F. M. Hatfield
10/2/81
18
< 0.1
2 3 Feet from cutting 10/2/81 17
blade
< 0.1
3 F. M. Hatfield
4 3 Feet from cutting blade
10/9/81 10/9/81
15 15
0.4
0,,2