Document JNVOKMxp0jO2Emb8K7R0Bd3pv

DATE: ' SUBJECT: DEPARTMENT: JUSTIFICATION; COST: BACKGROUND.: Oi'l iWv/f *-j . .. MONSANTO - ANNISTON : . PR&D WORK PLAN January 11, 1971 Aroclor Pollution Study 916.07 Pollution Abatement BCC: - G . L. Arnett j . T. Bell j . L. Brown .. j . L. Corder ' j . L. Etheredge . R. Haupt . . L. Jessee . . C. Landwehr . F. Taffee . G7 Wright p . 0. DeGarmo - G.O. p .B. Hodges - G.O. w . B. Papageorge - G.O. w . R. Richard - G.O. j . R. Savage - G.O. Estimated Per Diem PR&D Cost Experimental Expense PR&D Cost to-date (1570) Estimated PR&D Cost 1971 $100 $11,000 $16,083 $10,000 The filtration and column adsorption phases of the work plan issued 9/9/70 have been completed. A report on the filtration study will be issued by 1/1'5/71. The data generated in the column study is being compiled for a cost estimate. `. The following conclusions were drawn from the filtration study: . .. a. Aroclor levels of the plant effluent were reduced to 10 ppb by filtration of the neutralization pit solids oh which Aroclor was adsorbed and by adsorption on the filtering media. b. The removal of 200-1000 ppm of solids in the plant effluent is a primary concern in any final clean up system. The line of research proposed in this work plan is based primarily on these conclusions. In the flocculation jar test run on the plant effluent, 15 ppm of SPV bentonite clay'and 1.5 ppm of Betz*s 1170 polyelectrolyte gave the best settling floe. Experimental: I. Define the following parameters in a flocculation study on the plant effluent. ._ ___ \ a. Flow rate b. Height of sludge blanket c. Bentonite clay feed (D Product of American Colloid Company DSW 345530 STLCOPCB4084158 PR&D Work Plan Aroclor Pollution Study Page 2 A SAFETY Object: To determine the operational parameters at which the solid and Aroclor concentrations are reduced to a minimum (i.e. 0-20 ppm solids & 10 ppb Aroclors). Since the bentonite clay is only a weighting agent for the floe, its concentration will be increased to some practical limit if necessary, in order to provide more surface area for adsorption. Estimated Beginning Date: Mandays ` Target Completion Date: 2/1/71 40 4/1/71 Experimental II. Demonstrate Aroclor removal in a semi-continuous adsorption study. Define optimum conditions: a. Retention time b. Adsorbent loading capacity c. Recycle Object: To utilize some less expensive adsorbents than carbon and provide an alternate design. The same reactor clarifier (Part I) will be used in this study. Provision will be made to recycle the settled adsorbent to premix area. Mandays Target Completion Date: 40 5/28/71 The HC1 and H3PO4 in the plant effluent are normally neutralized in the limestone pit. Occasionally, there is some residual acidity which should be guarded against. Any area exposed to the waste water should be washed thoroughly with copious amounts of water. This will also remove any Aroclor present. The flocculating agents (Betz polymer 1170 and American Colloid's SPV bentonite clay) are neither flammable, corrosive, or toxic. Hence, their handling requires no particular precautionary measures. An operation manual containing all safety procedures will be issued to personnel operating the clarification unit. Ishmeal Ransaw DSW 345531 jw STLCOPCB4084159