Document JNNvjEjq6Bn5LMoqB4wvEmbJv

PLANT JOB/APPROPRIATION NO. 623/NY 3954 PURCHASE ORDER ASARCO Incorporated PURCHASING DEPARTMENT 120 BROADWAY, NEW YORK, N.Y. 10005 PAGE 1 OF 4 DATE 12/15/76 ORDER NO. 16H-2259 REQUISITION NO. CE-76-EP-67 (E) Mikropul Div. The Slick Corp. FINAL DESTINATION-PLEASE NOTE CONSIGNMENT BELOW c/o No. Monsen CO. P 0 Box 174 Salt Lake City, Utah 84110 Attn: Mr. K.B. Monsen DATE REQUIRED AT DESTINATION As soon as possible SHIPPING INTERVAL PROMISED 10 Wks. After SELLER WILL SHIP BEFORE Drawing Approval POINT OF SHIPMENT ,, TERMS Collector,Summit,NJ Fan--Ka1sma/nn.Mich. Net^iO days ^ f.o.b. point fob Shipping Points^Te'^eait^c^ tor-Summit,N.J./Fan-Ka lamazooTtebch<^ (6783) El Paso, Texas ce 7b CONSIGNMENT-SELLER WILL SHIP TO ASARCO Incorporated, El Paso Smelting Works, El Paso, Texas 79999, Mail invoices to above at: P 0 Box 1111 SHIP VIA Render bill* as per attached shipping Instructions YELLOW FRT LINES QUANTITY UNIT SPECIFICATIONS ITEM NO. .UNIT PRICE /COTTRELL PLANT VENTTLLAflOJK DUST COLLECTOR Ref; North Monsen 29, 1976 and tions for Cott' Collector for 1976 which accomp Request for Quota -1129 dated Nov. rporated Specifica- ritillation Dust ated Nov. 4, Incorporated v. 11, 1976. only Model 64S-8-20 Style "B" saire Collector constructed of welded steel ousmgC'tts.enclose 64 da'cron felt bags, 4%" dia. x treated, Collector to be complete wit ss door, indicating manometer, electr controlling frequency of cleaning cycle. ssembly with Size 2llXL Clarage industrial fan, Arr. #9, complete with V-belt drive, OSHA approved guard, and a HP 1800 RPM TEFC motor to meet Asarco motor specs CE- 1-MOT. Capacity.* 3000 CFM @6" static pressure. x Stt * $5,695.00 LOT IMPORTANT-Thls order It ncx binding on eurchMerwttots ftw sttschsd cfcnowtodgnwnt end is slgnsd by sn Mtbortzsd Is of ssflsr snd rstumsd promptly lo gurchsssr. FOR PURCHASING DEPARTMENT USE ONLY $5,695.00 TVO URGER. cc 1303-1 K .206 distribution: 2--plant/1--G .D.Martin 1-E. H. Ha ug/lT^.^^rah/i^E. S. Gods ey 1-W.R.Kel ly/l-W. R. Na smytlTX 1--r. o. covington~'^^*s^-^<^ ASARro Ff ponnnifu PLANT JOB/APPROPRIATION NO. PURCHASE ORDER CONTINUED page 2 of '4 DATE 12/15/76 ORDER NO. 16H-2259 REQUISITION NO. CE-76-EP-67 (El QUANTITY UNIT SPECIFICATIONS Note: Asarco to furnish safety grid at the dis charge of the dust collector incorporated in our hopper inlet. ITEM NO, UNIT PRICE Note: Above to be a duplicate of that ordered for our East Helena, Montana plant by Davy power Gas Inc., per their order 0659-17P089-d^7?p^suta?rft^ed of sketch (Reqn. 17-011) Note: Above equi mentioned #90201, fo ^.t, as indicated in our above cifications is to be tagged 'ification purposes. It is understood an Seller, that the priip FIRM and not subject e Buyer and the n this order is ation. Drawings & Technical Data After receipt of order, approval within one (1) drawings to: Mr. A.O. Marsh, J: ASARCO Incorporated 500 Crandall Bldg. Salt Lake City, Uta 1 submit for sets of ign Engr. After approval. Supplier shal]\|uxni(gJ|f,*bne (1) set of certified sepias and one (1) set of installation and maintenance manuals along with spare parts list to: Mr. A.O. Marsh, Jr. Address as above. Supplier shall also furnish one (1) set of certifi ed transparencies and six (6) sets of installation and maintenance manuals and spare parts lists to: PDl A*'REV1SED 5/75 -.~ r- t n rvnnmQC PLANT JOSIAPPROPRIATION NO. PURCHASE ORDER CONTINUED PAGE 3 OF 4 DATE 12/15/76 ORDER NO. 16H-2259 REQUISITION NO. CE-76-EP-67 (E) QUANTITY UNIT IPKCIPICATIONS Mr. W.R. Kelly, Manager ASARCO Incorporated P 0 Box 1111 El Paso, Texas 79999 please send a copy of your letters of transmittal UNIT PRICE PD1 A-'REVISED 5/75 v<;\RCO ELP 0000286 t CENTRAL ENGINEERING DEPT DESIGN SECTION Salt Lake City, Utah December 10, 1976 Mr. F. O. Wittwer New York Purchasing EA-26-EP, N.Y. 3954, PLT623J EL PASO PLANT ^ GAS CLEANING, HANDLING & ACID PLANT CE 76-EP-67 (E), COTTRELL PLANT BIN VENTILATION DUST COLLECTOR We have checked Proposal NM-1129 from North-Monsen Co. for the above ventilation dust collector and find it meets our specifications and the price is in line. Please issue a purchase order to them for this equipment as proposed. FLB: pr cc: E. H. Haug/W. T. Sweat A.O. Marsh, Jr. E.S. Godsey W.R. Kelly W.R. Nasmyth-^-- FRANK L. BAER ASARCO ELP 0000287 CENTRAL ENGINEERING DEPT DESIGN SECTION Salt Lake City, Utah November 4, 1976 Mr. F. O. Wlttwer New York Purchasing CbVotW EA-26-EP, N.Y. 3954, PLTf^T) EL PASO PLANT GAS HANDLING, CLEANING & ACID PLANT CE 76-EP-67(E), COTTRELL PLANT VENTILATION DUST COLLECTOR We are enclosing our covering requisition, spe cifications and two prints of Dwg EP-23537-908-M for the above equipment. The collector to be a duplicate of that ordered for East Helena Plant by Davy Powergas Order 06 5917-P089-00, copy attached of sketch (Req. 17-011). Early action on this would be appreciated as we will need drawings for finalizing our layouts and designs. FLB:pr Ends cc: E.H. A, 0. E. S. W.R. W. R. R.O. Haug/W.T. Sweat Marsh, Jr. Godsey Kelly Nasmyth---- Covington t > t , FRANK L BAER Kinrn ft p nnwms PLANT JOB/APPROPRIATION NO 623, K.Y. 3954 TO: ASARCO Incorporated PURCHASING DEPARTMENT 120 BROADWAY NEW YORK. N Y. 10005 DATE REQUIRED AT DESTINATION: .. , .-is soon as possible NOTES TO BUYER: PAGE REQUISITION REQUISITION NO. CE 76--EP--67 (E) SHIP TO: El Paso Plant El Paso, Texas 1 PLEASE PURCHASE THE FOLLOWING: QUANTITY UNIT SPECIFICATIONS FOLLOW PURCHASE MANUAL INSTRUCTIONS FOR PREPARATION (SEE PAGES 25 THRU 3*1 MRO SUPPLIES ANNUAL USAGE ITEM NO. UNITS COTTRELL PLANT VENTILATION DU3T COLLECTOR One only Dust collector to meet Asarco*s Specification for Dust Collector dated November 4, 1976. This unit to be installed in Asarco*s El Paso Plant, El Paso, Texas. Equipment to be tagged as noted in specifications. Proposal Reouirements: Each copy of the proposal shall be complete with adequate data for am engineering evaluation. This to include, in addition, the following! 1. Unit weights, freight and delivery to Asarco*s El Paso Plant, El Paso, Texas, 2. Outline dimensions. Any deviation from the specifications or alternates proposed to be accompanied by adequate data for evaluation. (Continued page 2) PREPARED BY Frank L. Baer November 4, 1976 DATE ASARCO APPROVED A. O. Marsh, Jr. November 4, 1976 DATE APPROVED DATE acl urn ft p nnnmso ASAttCO fO C KKVItKO */*! t PRINTED IN U.t.A. PLANT JO. NO. 623________ APPROPRIATION NO. N.Y. 3954 QUANTITY UNIT REQUISITION CONTINUED SPECIFICATIONS RAGE RCDUIEITION NO. CE 76-EP-67 (E) ITEM NO. Copies of Proposals to be distributed as follows: Original: Mr. /. A. Sennis, Director of Purchases ASARCO Incorporated 120 Broadway Mew York City, Mew York 10005 One copy each to: Mr. 2. H. Haug, Director of Engineering ASARCO Incorporated 500 Crandall Building Salt Lake City, Utah 84101 Mr. A. O. Marsh, Jr., Chief Design Engr. ASARCO Incorporated 500 Crandall 3uilding Salt Lake City, Utah 84101 Mr. E. S. Godsey, Chief Fume Recovery Engr ASARCO Incorporated 500 Crandall Building Salt Lake City, Utah 84101 Mr. '7. R. Kelly, Manager ASARCO Incorporated P. O. Box 1111 El Paso, Texas 79999 Purchase Order Requirements: After receipt of order, supplier shall submit for approval four (4) sets of drawings to; Mr. A. O. Marsh, Jr. After approval, supplier shall furnish one (1) set of certified sepias and one (1) set of installation and maintenance manuals along with spare parts list to: Mr. A. O. Marsh, Jr. Supplier shall also furnish one (1) set of certified transparencies and six (6) sets of installation and maintenance manuals and spare parts lists to: Mr. W. R. Kelly ______________________(Continued page 3) _________________ 2 ! AtARCO AO *C REVISED ai . PRINTKO IN U.i.A. PCANT JO NO. 623________ APPROPRIATION NO. N.Y. 3954 QUANTITY UNIT REQUISITION CONTI NU CD SP EC IFICATIONS PAOt 3 REQUISITION NO. CE 76-EP-67 (E) ITEM NO. Rocooinoniled Suooli or: Iiikropul c/o ITorth Monsen Co. P. O. Box 174 Salt Lake City, Utah 84110 Copies of Requisition & Purchase Order to: E. H. Ilaug/U.T. Sweat, Salt Lake Office A.O. Marsh, Jr., Salt Lake Office F. S. Godsey, Salt Lake Office :i.R. Kelly, ri Paso Plant V7.H. Masmyth, 21 Paso Plant R.O. Covington, 21 Paso Supply Agent A C\Drn n \ m t t* aaaakm