Situation
A site visit was made on August 27, 1979 to Nuclear Engineering, Beatty, Nevada, to discuss disposal of PCB contaminated transformers. Max' McCombs and I met with Mr.. Thayer, site operations manager.
Recommendation
The Beatly, Nevada site is geographically ideal for the disposal of hazardous wastes. It has been inspected twice by the federal EPA and appears in the Federal Register for recommended PCB landfills. The landfill is primarily used by companies for PCB solids landfilling and by California companies for hazardous waste landfill. The limited size and analytical facilities plus its remote location make these facility only suited for PCB solids or a special one time waste disposal.
Background
: 1 Site Description
The landfill is located eighty miles north of Los Vegas in a remote
area. The nearest city is eleven miles away and nearest full time
resident is nine miles away. A majority of the surrounding land
is owned by the federal government for nuclear testing and missle
storage. The site is 80 acreas with six acres allocated for chem
ical wastes, the rest for nuclear wastes: The company has an
option on another eight acres to expand their chemical site. The
landfill is fenced and the nuclear disposal site is fenced from
the chemica1 site.
.
The site is not visible.from the road. It was well maintained with no broken down equipment in the area. There was a small office . building and a repair shop located on the landfill site.
I I Geology
A survey map of the site was not available or required for permit since their are no contours. The groundwater level is 350 to *)00 feet below grade. In addition there is 3 inches annual rainfall with 1001 surface evaporation. There are ten monitering wells surrounding the site at various heights with the deepest 500 feet. Each is monitered monthly with none having any contamination and many having no water Intrusion.
No soil testing has been made on the site and was not required by
PCB-ARCH-EXT0378371
either the state EPA or federal EPA. The PCB trenches have 130 feet sandstone, 100 feet clay, followed by 160 feet of sandstone. Three distinct old river beds can be noticed layed through the trenches.
I I I Site Operations
- '
The site receives on average 1.3 trucks of waste per day. Bill
of Ladings are logging in a master book and the truck drives direct
ly to the appropriate site. The drums are unloaded and drums driven
into the trench by a forklift. Transformers are unloaded by crane
in the trench. Drums are normally covered everyday. The day we
visited, drums were left uncovered through the night due to a late
shipment. However, since there is no rain, site management did not
see this as a problem.
Drums are not opened or analyzed on site. State inspectors visit the site twiceper month and have requested a drum analysis on some occasions. These are sent to Los Angelos for results.
IV Pe rmit
.
Attached is the PCB landfilling permit. There is no official state . permit. Trip reports by inspectors serve as the permit renewals.
The PCB landfill permit must be renewed by December 1979
V Safety
Drinking water was available in overhead horizontal drums. This same water served as a safety shower. A safety kit located inside a small garage structure at the chemical landfill trench is opened and checked every day. The site manager reviews the safety equipment : . :requirements.for every shipment with the personnel. They have , . had no recordable accidents in.their history.
A drinking water well is also available at a depth of 380 feet. This well is sampled monthly for chemical contamination.
VI Personnel Observation
The site was well kept and clean. Operations were run in a metho dical manner with extreme cafe due to the presence of nuclear wastes.
This management style was then used in the chemical landfill site.
The federal EPA was impressed enough with the site to require only one PCB test well and no soil samples. They have visited the site twice since approval.
Conclusions
This site should be utalized for PCB contaminated articles and trans formers by Monsanto. Its geographic conditions are perfect and its bid price for disposal was lower than several other landfills. Care must be taken to insure a secure packaging and loading of the articles on the truck. The load will remain for over 60 hours on the road.
R. Sinise
PCB-ARCH-EXT0378372
ATTACHMENT
TO OPERATE A CHEMICAL WASTE LANDFILL
FOR
.
.
PCB DISPOSAL-
In compliance with provisions' of Section 6(e) of the Toxic
Substances Control Act. (15 USC 2601), the State of
Nevada, the Department of Conservation and Natural Resources,
the site owner, and Nuclear Engineering Company,Inc., the
operator, of the NECO waste disposal site located 10.5 miles,
south-southeast of Beatty, Nevada, on U.S. Highway 95 in Nye
County, are hereby approved to operate, jointly and severally,
an existing chemical waste landfill facility to dispose of
.non-liquid polychlorinated biphenyls (PCB's) at the 8.26 acre
area defined by coordinates N 9377.9 E 12580.0, N 9388.5 E 12007.0,
N 8792.4 E 11979.6, ana N 8781.7 E 12576.6 based on the northeast
corner of Section 35 which is defined by coordinates N 10,000.00
E 13,965.32, in accordance with the plans submitted with the
application dated May 23, 1978; with subsequent supplemental
information submitted on August 17, 1978; October 18, 1978; and
November 7, 1978; with the PCB regulations on marking and disposal
(40 CFR Part 761); and with the conditions attached to this docu
ment and made a part of this approval. The owner and operator
shall be jointly and severally responsible for complying with the
terms and conditions of this approval.
The existing facility is the NECO waste disposal site `located
near Beatty, Nevada, in Nye County. The facility is currently
operating as an industrial solid and liquid waste disposal site
adjacent to a radioactive waste disposal site. The facility has
disposed of PCB's prior to the effective date of the EPA marking
and disposal regulations for PCB's.
Failure to comply with any condition or term set forth in this approval shall constitute a violation of Section 15(1)(C) .of the Toxic Substances Control Act and 40 CFR Part' 761, and will be considered grounds for enforcement action pursuant to Section 15., 16, and 17 of the Toxic Substances Control Act. In particular failure to comply with Conditions No. II. 10 and No. II. 13 of this approval will be grounds for immediate termination of this approval.
Thisapproval grants no relief from the responsibility for
compliance with any other applicable provision.of 40 CFR
Part 761 or any applicable Federal, State, or local regulations.
This approval shall become effective immediately.
DATED
Regional Administrator
tAEPA, Region IX
PCB-ARCH-EXT0378373
CONDITIONS
I. MODIFIED CONDITIONS . .
In accordance with 40 CFR 761.41(c)(3) and (4)the Regional
Administrator of the Environmental Protection Agency in
Region IX, based upon the finding that such operation will
not present an unreasonable risk of injury to health or.
the environment, hereby waives and modifies the require
ments of 40 CFR 761.41(b) as follows:
1.
.
.
.
The requirement that only three sampling points, equally
spaced on a line through.the center of the disposal
area and extending from highest water table elevation
area to lowest water table elevation area be necessary
for underlying earth materials which are homogeneous,
impermeable, and uniformly sloping in one direction .
(Section 761.41 (b) .(5) (ii) (a) ) is waived. The owner and.
operator of the NECO site shall'immediately install at
least one monitoring well in addition to the existing
wells specified in their application and Operations
Plan in accordance with the specifications of Section .
761.41(b) (5) (ii) (b.) to' be located near the center of
the site in a PCB trench. The depth of the well shall
be below the deepest burial level of the trench and
shall be screened or slotted below that level and cased
at the bottom for liquid retention. This well shall be
monitored on a monthly basis for the parameters PCBIT
pH7 ~specitic conductance, and chlorinated organics-, f The
ten^xislTing-Observation.wells snail continue to be
monitored for the presence of liquid on a monthly basis,.
If any liquid is detected, samples shall be taken and
analyzed for the required parameters above. The site
water well shall also be monitored on a monthly basis
for the above parameters. The EPA has determined that
the monthly monitoring of the existing observation wells,.
the newly installed monitoring well, and the site water
well will be adequate for early detection of any PCB
leachate.
.
2. In regards to monitoring well construction, the require
ment that the annular space between the monitor zone
and the surface be completely backfilled or plugged
with Portland cement (Section 761.41(b)(5)(ii)(b)) is
.
modified for the site water well. It is determined that
the use of drilling mud in the annular space as a seal
ing medium is adequate to effectively prevent percolation
of surface water into the well, bore considering the arid
climate .of the site and the depth of the well bore.
.
PCB-ARCH-EXT0378374
-3-
3.
.
, t
The requirement that an acceptable leachate collection
system be installed beneath the chemical waste landfill
(Section 761.41(b)(6)) is modified. The top of the
uppermost aquifer is 326 feet below'the surface. 115
feet of the 326 feet of material between the surface
and the nearest aquifer comprise of clay or substantial
clay mixture. The clay layers would limit the downward
movement of any.leachate by absorption on the alluvium,
thus protecting the groundwater from contamination.
There are no perennial streams within 10 miles of the
site. The expected rate of precipitation is 2.5 to 5.0
inches per year, and the expected evaporation rate is
100 inches per year. Minimal water is expected to
collect at the site. No leachate collection system as
described in the regulations is deemed necessary. The
Operations Plan shall be amended to address specific
actions to be taken in the event PCB of any liquid is
detected in any of the monitoring wells. Specific
actions shall include pumping out and properly disposing
of any liquids detected in the`wells each month. Action
shall also include steps to be taken in the event PCB
is detected at the site water well.
4. The requirement that diversion structures capable of
'
diverting all surface water runoff from a 24-hr 25 yr
storm be provided for a landfill site above the 100-yr
.
flooawater elevation is modified.' In consideration cf
the following, adequate assurance to divert surface
water runoff is provided: (a) 2.5 to 5.'0 inches per
. year average rainfall, (b) 1.5 inches rainfall for the
.24-hr 25 yr storm, (c) 100 inches per year evaporation
. rate, (d) topographical slope range of 1:100 to 1:200,
(e) the slight knoll'on which the PCB site is located,
(f) small berms about 1 foot high surrounding the site
at the fence boundary, and (g) unpaved roads with 1
' foot deep V-aitches and scraped land areas with a rise
of about a foot surrounding the perimeter of the site.
, The owner or the operator -of the site shall amend the
.
Operations Plan to include measures to be taken in the'
.
event surface water runoff become inadequately controlled.
In addition, a report shall be made in writing to the
EPA immedTctgtr9~ each time^ surface water ~rrmuf'f~~isJZT "
observed at or near the site.!;---------------- ----------~ r"--'
.
II. GENERAL AND SPECIFIC CONDITIONS
The following conditions are general requirements embodied
in the PCD regulations (40 CFR Part 761) as well as additional
_requirements pursuant to 40 CFR 761.41(c) (3) (ii) :
' *
PCB-ARCH-EXT0378375
*1
1# The following PCB wastes are the only PCB wastes authorized for disposal at the site:
*
`
.
'
A. Non-liquid PCB mixtures in the form of soil or
debris which have been contaminated by PCB as a
' result of a spill; .
.
,
.. .
Contaminated materials not resulting from a spill . (landfilled only until January 1, 1980); . . . .
;.
C. PCB transformers which have been drained in ...
accordance with recmirements of Section 761.10.
.
(c) (1) (ii) ;
D.. PCB large high* or low voltage capacitors (land
.
filled only until January 1, 1980); . .
' E.-: PCB containers which have been drained in-accordance '
.* .
with requirements of Section 761.10(c) (1) (ii) ; .
-
F. Small PCB capacitors owned .by PCB capacitor
' . manufacturers (landfilled only until January 1, 1980);
'
G. Dredged spoils and municipalsewage treatment
.
' =;
sludges that are' of PCB mixtures.
:.
.
'
2. Landfill disposal requirements as specified in 40 CFR
Part 761 Sections 761.10, 761.41, and 761.45(b) shall
be adhered to at all times. The requirements of'Section
761.42 shall be adhered to should PCB's be stored
*
.
for disposal.
3. Water qualitysampling methodsandanalyticalprocedures
shall be performed in accordance with 40 CFR Part 136
. as amended in 41 Federal Reaister 52779 (December 1,
1976) .
4. Operational guidelines and procedures shall be adhered
. to at all times and shall.be as specified in the Operation
' Plan, submitted to the EPA on August 17, 1978, as Exhibit
of the supplemental information to the application and
hereby attached to and incorporated as a condition of
this Approval to Operate, along with any amendments
required to be submitted pursuant to this Approval to
Operate or any future amendments. Upon approval by
the Regional Administrator of EPA in Region IX, such
amendments shall become conditions of this Approval to
Operate.
5. The Operations Plan shall be amended to state that defined water sources at or near the site will be sampled indefinitely on a frequency of not less than once every six months after final closure of the PCB disposal site.
:*>
.
'
.
.
PCB-ARCH-EXT0378376
5-
6. The Operations Plan shall be amended to specify that all
PCB wastes be placed in the burial trenches carefully
and not be dumped or pushed into the burial trenches
from the lip of the trenches; that no PCB wastes be buried
at any depths where there is evidence of liquid at such
levels; that all PCB wastes `be buried at least three feet
below the natural land surface; that_ns--ethar wastes be
burjLed^above or below the PCB wastes; and that PCB wastes
be segregated"fromiorneif wastes in each trench-by construc
tion of separation walls of--at least three. feet of earth.
,,-- -------------------------- -------------------------------------------------------------------------------------------------------------------
7. The Operations Plan shall be amended'such that all sampling
and analysis data from ground and surface water monitoring
be prepared and maintained along with records of other
data required by Section 761.45(b) of the PCB regulations.
Such record of data shall also be submitted to the EPA
on a monthly basis. The Operations Plan shall also be
amended to include recordkeeping of three dimensional
burial coordinates- for any other- chemical wasVn-i-riRd
in cells adjacent to PCB burial cells' in the trenches.-^
.8 The EPA shall be notified in writing of all required
amendments to the Operations Plan within thirty (30). days
from the date of this approval. Such amendments shall
be subject to EPA approval pursuant to 40 CFR 761.41(b)
(7)(ii). Also any amendments to the Operations Plan
thereafter shall be subject to EPA approval and the EPA be
notified thereof.
--- ---------------- --------------
---
9. The owner or operator of the disposal site shall submit in writing to the EPA on a monthly basis a report of any PCB materials received during the.month resulting from a spill.. The report shall include the spilled material source, the shipper, and the quantity received. In . /
'-a3dtdree-7--the -monthfby- re-pert shall include a-d-erscge^rfc6n of any event which isnot normal to the operation of the PCB site (e.g., accidents, entry by unauthorized persons or animals, erosions, excessive rainfalls, etc.).
.10 The owner or operator of the disposal site shall immedi ately report in writing to the EPA any instance ofdetection of PCB1s at any of the monitoring wells or the site water well.
11. At the request of any State or local government in whose
jurisdiction the disposal facility is located, an annual
written notice, curing the time the facility is used for
PCB disposal, of the quantities and general description
of PCB's disposed of during the year shall be submitted
no more than twenty (20) days after the end of the year
covered.
.
'
.
PCB-ARCH-EXT0378377
-6-
12. EPA officials, upon presentation of credentials,
^
shall be permitted access to .the disposal site
. for the purpose of inspections and sampling.
.
13. If at any time the EPA .determines that the PCBsite
.
is creating a situation of imminent hazard, this EPA
office will notify you as to what steps are necessary
'to prevent imminent hazard. Such steps must be taken
" by the date provided in such notice.
14. This approval shall be subject to periodic review as deemed appropriate by the EPA and may be modified,
suspended, or revoked in whole or in part for cause including, but`not limited to, the following:
. ' ; A. Violation of any terms or conditions of this
..
approval; .
... . . . ' ' . -:
-
B. Obtaining this approval by`misrepresentation or,
.
failure to .disclose fully all relevant facts; or
C. A material change in any condition that requires
.
cessation of the authorized burial. .
15. All reports, notifications, mail or other submittals
required to be submitted to the EPA under this
Approval to Operate shall be sent to the Director,
Enforcement Division, U.S. Environmental Protection .
Agency, Region IX, 215 Fremont Street, San Francisco,
CA 94105, Attn: E-3.
.
.
PCB-ARCH-EXT0378378
ADDENDUM NO. 1
Title to ond Risk of Loss for the Cood3 passes to-Nuclear Engineering Company, Inc. (Contractor) upon delivery by Monsanto Company (Monsanto) at Monsanto's John F. Queeny Plant. Delivery is deemed to occur after the Goods are loaded into or onto the transport vehicles or facilities provided by Contractor to transport said Goods end such loaded vehicles have departed from Monsanto's plant. Monsanto shall label, placard and package tire Goods in . compliance with all applicable DOT regulations and load said Goods into or onto the transport vehicles or facilities and Contractor shall be solely responsible for securing such Goods after they have been loaded. .
(o) The general descriptions of the various types of '
Goods to be delivered to Contractor for disposal are set
*
*
*
out on Schedule A and the Hazardous Haste Shipment.Record
Form,.(For the purposes of this Addendum, Schedule-A and
the Hazardous Haste Shipment Record Form shall include any
derivintions thereof or supplements thereto, os mutually : - .
*
.
t
agreed upon in writing by Monsanto and. Contractor.) Tne percent
composition of such Goods may, however, vary from shipment to
shipment ond from one container to another, because of
. .
o
,
-
-
variations in process operations and the maintenance proce
dures of Monsanto's plants. (For the purpose of this Addendum,
PCB-ARCH-EXT0378380
general description shall mcon that description mutually
*
ogreed upon in writing by Monsanto and Contractor.) It ic
understood by the parties that Contractor will rely solely
on Schedule A and the Waste Shipment Record Korn for the
general description of the Cools, and Contractor shall not
be required to analyze, sample or test such Goods. Provided,
however, that Contractor shall be required to examine the
general description in Schedule A and the Waste Shipment
'
Record Form prior to disposal of the Goods to determine
Whether the Goods are sufficiently described thereon to
\
*
enable Contractor to properly dispose of such Goods.
*
*
.
*
0>) Contractor shall within fifteen (15) days after .
delivery of the Goods, give notice to Monsanto of Goods which
vary materially from the general, descriptions thereof as.
Bet forth in the attached Schedule A and Hazardous Waste
"
Shipment Record Form and which, as a result thereof, are
unsuitable for disposal at.Contractor1s disposal facility.
For such varying Goods, Monsanto agrees to pay Contractor
all inspection, transportation and handling costs actually
and reasonably incurred by Contractor, both to Contractor's
place of disposal and return to Monsanto's plant or to such
other storage or disposal facility designated by Monsanto...
Such inspection, transportation and handling chargen shall
hot be paid if Contractor foil3 to give such notice within
uaid fifteen (15) day period.
PCB-ARCH-EXT0378381
(c) For Coods which vary materially from the general
description act out in Schedule A.and the Hazardous Waste
.
.
*
Shipment Form, but which remain suitable for disposal at
Contractor's disposal facilities, Monsanto agrees to
.
reimburse Contractor for increased costs actually and
reasonably incurred by it in disposing of such varying
Goods, provided (i) that Contractor notifies Monsanto in
writing prior to disposal or within fifteen (15) days
.
after delivery, whichever comes first, that its cost of N
disposal is increased as a result of the Goods materially
varying from the general description, specifying the nature
of the variance, its best estimate of the increase in cost,
and on explanation of such increase in cost and (ii) that
Monsanto shall have the right to inspect the Goods before
disposal to determine whether such variance does exist,
If Monsanto and Contractor disagree as to the extent of
'such variance and the amount of the additional cost of
.
disposal, and cannot reach a mutually acceptable compromise,
the varying Goods shall be returned in the some manner and
under the same conditions as set out in Paragraph 2(b).
.
Contractor shall not be reimbursed for such increased cost,,
if it foils to give such notice prior to disposal or within
said fifteen (15) day period, whichever comes first. Such
payments for cither the return or increased cost of dio-
posing of any varying Coods by Monsanto shall be the limit
PCB-ARCH-EXT0378382
/ . J0
.
of Monaento's liability to Contractor for ouch varying
. Goods. Subject to Monaanto'a obligations under Paragraph
a
m
2(o) and its obligation to package, label, placard and
load tho Goods, Monsanto MAKE'S NO OTHER REPRESENTATIONS OR
WARRANTIES OP ANY KIND, EXPRESS OR IMPLIED, AS TO MERCHANTA
BILITY, FITNESS FOR PARTICULAR PURPOSE, OR ANT OTHER MATTER
WITH RESPECT TO THE GOODS, WHETHER USED ALONE OR IN.'COMBI NATION
WITH OTHER SUESTANCES.
.
. `
-
3. Contractor acknowledges that it has received a general
description of the Goods, that it is familiar with the
*
'
.
*
hazardous nature thereof, and that it has the knowledge.and
expertise to handle, haul and dispose of the Goods In a
safe and efficient manner, as such Goods are generally . -
described in Schedule A and the Hazardous Waste Shipment
Record Form.
.
-
4, Contractor shall indemnify and hold Monsanto, its employes
and agents harmless.from and against any and all liabilities,
claims, damages, penalties, actions, suits, losses, costs '
and expenses (including cost of defense, settlement and
reasonable attorneys' fees), whether the foregoing are based
in contract, negligence, strict liability or other legal
theory, for any personal injuries. Including death, ond/or
property damage, or*for any contamination of or adverse effect
on humans, domestic animals, aquatic and wildlife, food,
.
` '
'
'
.
*
J
animal feed or the environment, arieing out of or in connection^
-
'
.
// s*1 '
PCB-ARCH-EXT0378383
with the receipt, possession, handling, distilling, use, .
.
. resole, transfer or disposal of the Goods, distillates or
* residues therefrom or any components thereof by Contractor or others, whether nlone or in combination with other substances.
Monsanto if it so elects, shall have the right to tender its ' own defense, which right shall Include, but not be limited to,
the selection of counsel and the preparation of Monsanto's
defense. Notwithstanding the foregoing and provided Contractor
.
'
.
`
.
.
.
has properly performed its duties and obligations under this
. Agreement, Contractor shall not be required to indemnify or
hold Monsanto, its employes and agents harmless in the event (a) the Goods materially vary from the general descriptions
thereof set forth in the attached Schedule A and the
*
. Hazardous Waste Shipment Record.Form, and such variance is '
*
the cause of such personal injury, including death, and/or
property damage, or (b) such personal injury, including
death, and/or property damage is caused by the negligence
of Monsanto (i) in furnishing or utilizing defective containers
into which th'e Goods may be stored (ii) in labelling, placard
ing or packaging the Goods contrary to applicable. DOT regulations c
(iii) while loading the Goods onto Contractor's transport .
.
V
'
" * .
. vehicles or facilities.
.
.
4' 5. The terns and conditions of this Addendum shall supersede
any contrary or conflicting terms in'Monsanto's purchase
orders or Contractor's Hazardous Waste Shipment
j *tt*
PCB-ARCH-EXT0378384
Hmsnnto and Contractor acknowledge one! agree that Section 0 Sentence 2, of Con tractor * 3 Hazardous Waste Shipment Kccord Form, #116 LKC shall be null and void.
MK_Xe,wr.?.
OF
'
1PER* FOP.M AHC:-:.
Performance under thin addendum and
.
.
purchase order, except for the payment of money for services
performed, may be suspended by either party in the event of: act of
Coi, war,- riot, fire, explosion, accident, flood, sabotage;
lack of adequate fuel, power, raw materials, labor, containers
or transportation facilities; compliance with 'governmental
requests, lcw.s, regulations, orders or actions; breakage
.
or failure of machinery or apparatus; national defense
.
. '
.
'
*
requirements or in the event of labor trouble, atrike,
lock-out or injunction (provided that neither party shall
bo required to settle a labor dispute against its own best
judgment); or any other event beyond the reasonable control
of such party, which event prevents the delivery, transpor
tation, acceptance or disposal of Goods. Any
party claiming the existence of an excuse of performance
nh-vll promptly notify the other party of its existence,
expected duration and effect on this addendum and purchase
order. J
PCB-ARCH-EXT0378385
Material
Compos 1tion
.
Special Handling Precautions
Resin MHP Filter Cartridges
Filter Cartridges Saturated with a Tolucnesulfonamidc/Forma1dehyde resin and various impurities.
Avoid breathing vapors.
Crude Resin MHP Filter Cake
40-60% Toluenesulfonamide/ Formaldehyde Resin
40-60% Diatomaccous Earth and various impurities
Avoid breathing vapors. .
Rej. Product 26/(56 In Clay
33"38% n(2-methyl-2 nitro propyl)
. 4-nitro ani1ine and
various organics
62-67% Clay
'
V/i 11 decompose releasing . NOx fumes if contacted
by strong acids or bases or held at 125F or above for prolonged periods. V/ater should be used to quench any reaction.
Benzoic Acid Residue
75"85% Benzoic Acid and impurities 15-25% Dibenzyl-o-Biphenyi
Avoid skin contact and Inhalation.
2 TAP Distillation 90-93% Polymeric Amines and Tars
Residue
' 1-10% 2-Thenyl ami nopyridine
Avoid any direct contact V/ear rubber gloves, goggles and apron.
CD Fi1 ter Cake
Various silicate phosphate and phthalate esters in filter media.
Mono.
- .
CD Filter Cartridges
Filter cartridges saturated with various silicate, phosphate and phthalate esters and Impurities.
None.
TMB Filter Cake
80-90% Diat.omaceous Earth 5-10% Isopropyl Alcohol 3-5% V/ater 0-2% TMB
Keep away from sparks or flame. Use v/ater, foam, CO2 or dry chemical in case of fire.
MPF Filter Cake
30-^0% Diatomaceous Earth 55-60% Carbon
0-5% . Methylpyr11 ene fumarate ' 5-10% Isopropyl Alcohol
Keep away from sparks or flame. Use water, foam, CO2 or dry chemical In case of fire.
MPHCl Filter Cake
35-^0% Diatomaceous Earth 55-60% Carbon
0-5% Methylpyrilene MCI 5~10% isopropyl Alcohol
Avoid vapor inhalation and eye and skin contact. Keep away from sparks or flame. Use water, foam, CO2 oc dry chemical in ease of fire.
PCB-ARCH-EXT0378386
-2-
Hatcrlal
flPF Filter Cartridges
Compos 1tion
Filter cartridges saturated with Methylpyrilene Fumarate and . . Isopropyl Alcohol
HPHCI Filter Cartridges
Filter cartridges saturated with Methylpyrilene HCI and Isopropyl Alcohol.
Filter cartridges saturated with water, isopropyl alcohol and trimethoxybenzaldehyde.
Pipe and OCA.
Zinc ChloYideV
Zinc Chloride and impurities.
FH-132 Filter Cartridges
^O-kOZ 1,2-bis(phenylthio) ethane 60~70% isopropyl Alcohol Trace 2-chloroethyl phenyl
sulfide.
AspTrT n DuTT^N C^CoiIec tor Tubgj^
P-22 Filter Cartridges
Tubes impregnated with Aspirin/ Sal 1cylic Acid.
Filter Cartridges saturated with Trlphosphonate and various
Irnpurlties.
Special Handling Precautions
Keep away from sparks or flame. Use water, foam, CO2 or dry chemical in case of fire.
Avoid vapor inhalation and eye and skin contact. Keep away from sparks or flame. Use water, foam, CO2 or dry chemical In case of fire.
Keep away from sparks or flame. Use water, foam, . CO2 or dry chemical in case of fire.
Avoid skin contact. V/ear rubber gloves, goggles and apron if direct contact is required.
Avoid contact with eyes. Contact with water or mois ture in the air will liberate MCI gas. V/ear rubber gloves, goggles and apron if direct contact is required. In case of fire use dry chemical, CO2 or foam. Do not use water.
Avoid skin contact or inhalation. V/ear rubber gloves, goggles and apron if direct contact Is required. Keep away from spark or flame. In case of fire use water-, foam, CO2 or dry chemical.
Avoid dust inhalation.
Heating to approximately 100C or above releases toxic vapors.
PCB-ARCH-EXT0378387
Material
Resin MS-805; FI 1 ter Cake
-37
Composition
40-80% Diatomaccous Earth 20-60% Tolucnesulfonamide/
Formaldehyde Resin, Butyl Acetate, and various Impurities.
TP Base Dis tillation Residue
92-98% Polymeric Amines and tars
1-3S 2-Thenyl Aminopyridine 1-5% Thenyl Pyramine Base Trace Li thiurn Sal ts 100% o-Nitrochlorobenzene
and various trace
Impurities.
0MCB Contaminated Equipment
100%
o-Nitrochlorobenzene and various trace Impurities.
Fumaric Acid Dust Collector Tubes
Empty FH-132 Residue Drums
Plastic scrubber packing with only trace amounts of organic contarnination.
Dust collector tubes Impregnated with Fumaric Acid
25-35% Isopropal Alcohol and Tars 25"35% Thiophenol 10-20% Chlorocthyl Phenyl Sulfide 5-10% Diphenyl disulfide 0-5% 1,2 bis (phenylthio)ethane
Special Handling Prccautions
Avoid vapor Inhalation and skin contact. Keep away from sparks or flame. In case of fire use water, foam, CO2 or dry chemical. Wear rubber gloves, goggles and apron if direct con tact is required.
Acute toxicity tests being performed. Currently no problems associated with handling have occurred. Use water, foam, CO2 or dry chemical in case of fire.
Avoid skin contact and inhalation. Wear rubber gloves, goggles and apron when handling. Use water, foam, CO2 or dry chemical in case of fire.
Hone. Use water, foam, CO2 or dry chemical in case of fire.
Avoid eye and skin contact and dust inhalation. Use water, foam, C02 or dry chemical in case of fire.
Avoid eye and skin contact and vapor inhalation. Wear rubber gloves, goggles and apron if direct contact is required. Use water, foam, CO2 or dry chemical in case of fire.
PCB-ARCH-EXT0378388
Material ONA Filter Cartridges Phthallc Anhydride
AZO Residue
Compos 1tions
Filter Cartridges saturated with o-N!troanisole, Inorganic salts and various trace-Impurlties.
Phthallc Anhydride
..
contaminated with small .
quantities of various
organic and inorganic
materials.
. ..
50-70% Triethyl amine Salt 10-40% 2,6-diethylphenyl-
azomethine 1-20% 2,6-diethylan?1ine 1-10% Formaldehyde
OS-E Residue Sodium Si Iicate Orth-EV Cut
OS-E (a polyphenyl ether) with various organic tars and small quantities of potassium phenoxyphenate.
Sodium Silicate with small quantities of various im- . purities.
85-99% o-Ethylvani11 in 1-10% Ethyl vani11in 0-10% o-Ethexyphenol
Special Handling Precautions___
Avoid skin and eye contact.
Avoid skin and eye contact and Inhalation.
Avoid skin and eye contact. A Class B poison by DOT regu lations.^ Avoid contact with acids and bases. Use foam, C0o or dry chemical to fight fires.
Avoid skin and eye contact.
Avoid skin and eye .contact and Inhalation.
Avoid skin and eye contact.
PCB-ARCH-EXT0378389