SOP #3 REVIEWED 3/90 JTA
STANDARD OPERATING PROCEDURE PER 229
ACTION STEPS (ALL CAPS)
COMMENTS (BELOW STEPS)
1. PER 229 IS NOT STABILIZED IN A TANK; IT IS STABILIZED IN THE VESSEL IN WHICH IT IS TO BE SHIPPED.
2. PER 229 IS MADE FROM STABILIZED PER 230. THE ADDITIONAL STABILIZERS ARE TO BE MEASURED OUT, LABELED WITH A SAMPLE TAG AND HAND DELIVERED TO SHIPPING.
3. THE SHIPPING PERSONNEL ACTUALLY ADD THE STABILIZER TO THE VESSEL. FOR THIS REASON, IT IS VERY IMPORTANT TO PROPERLY LABEL THE STABILIZERS WITH THE ORDER NUMBER (FROM SHIPPING), DATE, UNIT, NAME OF STABILIZER.
THE FOLLOWING CHART IS TO BE USED TO CALCULATE THE ADDITIONAL STABILIZERS:
GALLONS TO BE _ STABILIZED
CHO TO BE ADDED (GALLONS)
DMSO TO BE ADDED (MLS~>
3500 3400 3300 3200 3100 3000 2900 2800 2700 2600 2500 2400 2300
2200 2X00 2000
1900 1800 1700 1600 1500 1400
13.00 12.75 12.33
12.00
11.50
11.0
10.75 10.50
10.00
9.75 9.00 9.00 8.50 8.25 7.75 7.33 7.00 6.75 6.33
6.00
5.50 5.25
645 630 612 593 575 555 538 520 500 480 465 445 430 410 390 370 350 335 315 300 275 260
SL 021237