t To: T. H. Huffman
IflIPM lllllifl
Communication
From~
c* Skokna February 19, 1990
ABERDEEN MONTHLY PROGRESS REPORT JANUARY, 1990
There was one first aid and one recordable case reported during January. The recordable case involved a maintenance employee who suffered caustic burns to his feet. At month's end, the Aberdeen plant's employees have worked 3863 days (3,125,576 manhours) since the last lost time injury.
FY 1990 Kev Statistical
J anuarv
Y-T.D.
PVC Production, MM Lbs. Reactor Stream Factor, % Resin Quality, % Prime VCM Efficiency, Lbs./Lb. Flexible Compound Production, MM Lbs. Flexible Compound Quality, % Prime Rigid Compound Production, MM Lbs. Rigid Compound Quality, % Prime Plasticizer Production, MM Lbs. Plasticizer Quality, % Prime Energy Use, (EUI, %) Fixed Cost Variance, $M Variable Cost Efficiency Variance, $M
39.9 90.0 96.6 0.9936
5.3 98.3
5.5 99.9
1.4 85.5 < 8.4>
<10.8>
218.0
143.0 83.0 96.7
0.9995 23.7 97.9 17.1 99.4 5.6 89.5
<12.8>
19.4 268.0
Factors
Resin Flexible Compound Rigid Compound Plasticizer
105.6 69.0 93.2 73.3
95.4 76.1 99.4 77.0
Waste Reduction Indices (%)
Offsite, Hazardous Wastes Recycled, Hazardous Wastes Offsite, Non-Hazardous Wastes Vulnerable By-Products Total Waste Water Air and Water
157.7 57.9 74.6
100.5 113.8
82.6
141.5 60.6 81.3 95.7
115.7 83.3
(1) Three-month rolling average.
VAB.0001190202
*
T. H. Huffman
2/19/90
Aberdeen Monthly Progress Report - January, 1990 Page 2
Operations
A clean wall agent was tested in reactor D745. Initial results
are promising.
Resin properties and quality were not
significantly impacted.
Lucidol 288 catalyst was used to make a 5415 resin batch. This is a less expensive material than the catalyst currently used. No noticeable difference was noted between normal production and the trial batch. More extensive trials are scheduled for February.
Maintenance problems on Lines III and V, along with increased product demand, tightened flexible compound production schedules. A PLENEX polymer run was made on Line I.
Demand for rigid compound surged during the month. On January 6, a new one-day production record of 356.6M pounds was set. The previous record was 351.6M pounds set on 6/1/85.
Costs
Variable costs were favorable due primarily to good VCM usage and to product mix effects in the compound department.
Fixed costs were essentially at budget.
OMP
1. Production of off-grade resin for 1990 YTD is 0.0326 lbs./lb. versus the FY1989 average of 0.0441. Most of the improvement is the result of the Vinyl Operations Superin tendent's Natural Team's changes in startup procedures.
2. The month's millscrap production in the flexible compound department was 0.0111 lbs. /lb. versus last year's average of 0.01968. The improvement was a result of procedural changes that were implemented by the Millscrap Reduction Team (This is Bill Davis's natural team. Bill is a shift supervisor).
3. CAPCO, a 5385 resin customer, visited the plant to learn more about our rigid compounding and quality control methods.
4. Twitchell's R&D manager visited the plant to learn about 5415 production.
t j
VAB.0001190203
mm
T. H. Huffman 2/19/90 Aberdeen Monthly Progress Report - January, 1990 Page 3
5. Dayton Extruded Plastics (DEP) visited the plant to discuss dimensional stability problems they are having with our rigid compound. They agreed to participate in a D.O.E. involving the raw materials used in their dry blend.
6. All first and second level supervisors met with plant management to discuss barriers they experience to QMP. Also, information was exchanged about our plant's businesses.
7. Twenty-two employees were trained to be on the Facilitator Team. This group will work with the plant's natural teams.
8. On 1/26, a team evaluated the VCM Plant's quality systems.
9. Sixty-three percent of the plant's natural teams met during the month.
Projects
The alternate natural gas line was tested. We will begin using natural gas from ACG via the new line on 2/1/90. Savings are approximately $1000 per day.
Doug Skokna Plant Superintendent
rah
A
i mW
VAB.0001190204
w mm
DISTRIBUTION
Houston
J. D. Burns
X
R. T. Ferrell
X
T. H. Huffman
C. J. Matson
D. F. Harman
H. R. Flammer
R. R. Smith
B. J. Bean
R. H. Gerlach
R. D. Gamblin
W. L. McClain
Austin
J. P. Stokes R. L. Poe
X
H. J. Hall
Oklahoma City LCVCM Plant
H. D. Garrison R. A. Conrad
J. Friend
LCLAB Plant Baltimore
J. W. Ware L. R. Bauer
X X
Hammond
J. Pavao
X
Blane Premiere
C. R. Miller P. L. Foote
Aberdeen
RWS/DCS (File Copy), JDO, JEN, MRK, DAM, JEB, JRW, JEL, REP, BLT, RBN, SCH
X
X X X X X X X X X
X X X X
X X
VAB.0001190205
SAFETY - B. L. Trego, J. V. Uptain
Fiscal
Fiscal
First Aid OSHA Recordable
Total Injuries
1 JL 2
6 8
Number of Restricted Workday Cases
1
2
1
Number of Lost Workday Cases
0
0
0
Injuries bv Department
Vinyl Operations Compound Operations Maintenance Laboratory Receiving/Warehouse Office
Totals
Injuries bv Type
00
02 26
00 00 1 29
Cuts and Abrasions Eye Injuries Burns Bruises Strains/Sprains Stings Other
Totals
Non-Occupational Injuries
12
01
12
01 00 01 0
2
1 0
2 2 2
0
8
Lost Workday Cases Days Lost
2 18
Safety Record
Last lost time injury - 7/5/79
Days since -
3863
Employee hours since - 5,125,576
On January 31, 1990, the employees of the Aberdeen plant completed 3863 days with no lost time injury.
"Hand Injury Prevention" was the principle topic for safety meetings during the month.
The new Safety Handbook was completed and is ready for distribution in February's safety meetings.
K
rnmmmmmmmmmmm
PRMMff
VAB.0001190206
SAFETY - Continued
Routine dosimetry results for the month were:
Chemical
<_________________________
Number
VCM Lead Total Particulates
75 100.00 15 88.2
8 100.00
>_________________________
0 2 0
0.0 11.8
0.0
lalacy class RWC
Maintenance Maintenance
Caustic bums to both feet. Cut - right fore finger.
\
VAB.0001190207
CAPCO (Cement Asbestos Products Company), which buys 5385 resin, visited the plant to learn about rigid compounding and Q.C. of rigid compound. CAPCO will begin manufacture of pipe at its Van Buren, AR facility during the first quarter of 1990. The additional pro duction will increase Vista's position from 24MM pounds to 36-40MM pounds.
Twitchell's R&D Manager, Dwight Barry, visited the plant this month to learn about the production of 5415 resin. Twitchell produces coated yarns which are woven to make patterned fabrics. As a part of the visit, Dwight talked with the Technical Service Lab personnel and discussed their capabilities.
Dan Preston from Dayton Extruded Plastics visited to discuss problems which DEP has experienced. The nature of the problem is dimensional instability (swell or shrink of the extruded part). As a result of our discussion, we decided to do a DOE involving the raw materials to their dry blend product. The experiment was designed and sent to Dayton for review. The material for each experimental run will be blended at Dayton's plant where the DOE runs will be made.
Manager's QMP Meeting
H
All of the first and second line supervisors met with plant management to discuss barriers they experience to QMP and also to receive information about the plant business. Meetings were held each of two days with half the group attending each day. The feedback from the meetings was positive and all involved agreed the meetings should be held annually.
Q-Scorecard Submittal
The plant Q-Scorecard was submitted for approval on January 26. The scorecard included goals in the following areas: 1) Natural Teams; 2) Cost Control; 3) Safety; 4) Waste Minimization; 5) Quality; and 6) a Linkage Measure. Development of departmental support scorecards has begun.
Facilitator Training
A meeting was held on January 23 to train all those who agreed to be a part of the Facilitator Team. There are twenty-two trained facilitators who will work with the plant natural teams. The natural teams will be taught team techniques and work on a project in their department as their case study.
VCM Plant Quality Systems Evaluation
An evaluation of the VCM plant's quality systems was performed on January 26. People involved were Mike Kane (Aberdeen), Dave Hollis (LCCP), and Jim Hall (Houston - Purchasing). All involved agreed that the exchange was mutually beneficial.
COST VARIANCES - D. C. Skokna Variable Costs
Product
Total
PVC Flexible Compound Rigid Compound Pla3ticizer
$136.0 53.2 14.4 14.4
$218.0
$1165.5 176.6 271.9
$1624.6
$1301.5 229.8
286.3
Z9,*Q
$1842.6
PVC - VCM use was below budget.
Flexible Compound - The favorable variance was due to product mix effects and a lower than normal scrap rate. The reduced scrap (0.011 lbs./lb. versus 0.0145 lbs./lb. standard) is due to the successful efforts of the Millscrap Reduction Team.
Rigid Compound - A favorable product mix effect was partially offset by above budget raw material consumption.
Plasticizer - VRP yields were above budget to give the overall positive variance.
Price
- VCM - Resin to Rigid Compound - Resin to Flexible Compound - Alfol* 610 - 610P to Flexible Compound - Natural Gas - Other Variances
Total
$1209.2 245.6 143.8 17.4 16.4
< 38.0> 30.2
$1624.6
- Payroll and Benefits - MM&C - Miscellaneous - TI&D - Clearances
Total
<$58.4> < 34.7>
88.5 14.3
8.1
<$10.8>
Overtime in operations and maintenance was above budget due to operational needs and the holiday.
M. M. & C. - Material costs for the Compound Department repairs were above budget.
.'"'"S
VAB.0001190209
COST VARIANCES - Continued
Miscellaneous: Major variances in this category were
Moving. Home
- $13.3M favorable.
Unclassified - $18.4M favorable.
RFS
transferred to this prolect's capital AFE
- $21.3M favorable.
T.L.& D. - This category was $14.3M unfavorable due to a $16.1M unfavorable FICA variance. The FICA is based on cash payroll which includes five pay periods this month.
wmmmmmmmmmmmmm
VAB.0001190210
VINYL - J. D. Olson, K. W. BIrck
Safety
The Vinyl Department did not have any first aid or OSHA recordable Injuries during the month of January.
The monthly safety meeting topic for the monch vr^s hand safety. A video tape on hand safety and pinchpoints was viewed and discussed.
Gg-PSrfll
1. 5385 was produced this month in the New Module.
2. Reactor D745 was used to test a new reactor clean wall technology. The new technology appears to have the potential to replace reactor chem wash and rinsing. There has been no detectable adverse effect on any resin physical properties.
3. Lucidol 288 catalyst was used to produce a batch of 5415. There was no noticeable difference between this resin (in cluding Mets IR testing) and other 5415 resin normally made with Witco 939 catalyst. L-288 is a less expensive raw material. More extensive testing will continue in February.
4. The resin raw materials in the 744 account were valued at $345.4M.
- Production, MM Lbs. - Daily Rate, M Lbs./C.D. - Capacity Utilization Factor, % - Total Reactor Charges - Charges/C.D. - Reactor Stream Factor, % - Rotary Dryer Stream Factor (#4-#8), - Fluid Bed Dryer Stream Factor, % - Resin Quality, % Prime
%
39.9 1287.1
105.6 928.0
29.9 90.0 71.7 96.8 96.6
Reactor Downtime
Operational downtime (recovery scheduling conflicts, rinsing chem wash tanks, New Module rinse/charge water conflicts, no place to dump, waiting on Q.C. data before charging and filter changes).
Maintenance downtime (hydroblast reactors and drill condensers D700 (IX) and D745 (2X), drill condensers D742, D743 and D744, repair agitator fluid coupling D742, repair agitator seal D300, repair Topaz unit, replace safety discs on D742 and D743, and miscellaneous instrument and valve repairs).
143.0 1162.6
95.4 3349.0
27.2 83.0 70.7, 86.3 ^ 96.7 Hours 278.5
463.8
VAB.0001190211
<
mmmf RHNMMNMpMa
f
m
A
VINYL - Continued
Drver Downtime
Reactor limited production.
Operational downtime (centrifuge plugs, check for dust collector leaking, clean dryers, activator transfer problems, and flameouts).
Maintenance downtime (centrifuge repairs, rotary and fluid bed repairs, shear pins, repair rotary valve, clean fluid bed scrubber, and repair Trunion bearings.
75.3 12.4
13.3
Kev Maintenance Work - J. B. Autrey, J. B. Hegwood
Reactor 745 was shut down during the month for hydroblasting and condenser drilling. This was done as part of the clean wall test run. The condenser was drilled and brushed in order to remove as much buildup on the tubes as possible. The condenser was then swabbed with the clean wall agent.
Reactor 700 was shut down during the month for hydroblasting and condenser drilling. This was done as part of the contamination control program.
Reactors 743 and 744 were shut down for condenser drilling during the month because of cooling control problems.
Reactors 741 and 742 were shut down during the month for safety disc replacements. This completes all safety disc replacements for the year.
Number seven dust collector was shut down for repairs to its screw conveyor and stub shaft during the month. The screw conveyor and stub shaft were replaced with a newly designed model.
Number eight dryer was shut down during the month for repairs to its inlet screw and Trunion. The inlet screw was pulled and repaired and the Trunion was replaced.
The fluid bed dryer was shut down for cleaning and Bird repairs during the month. The demister pads were pulled and cleaned because of an excessive calcium carbonate buildup. The Bird centrifuge was pulled and replaced with a spare because of an excessive vibration problem.
The main breakers were replaced on the east hot water charge pump and the old unit dump Sweco motors during the month.
All instrumentation for the low molecular weight project was calibrated during the month.
Numbers three and four VC Corken compressors were removed and rebuilt during the onth.
There month.
six major valves changed out in the reactor area during the
VAB.0001190212
COMPOUND - J. E. Nickerson, K. G. Akins
Safety
The Compound Department worked without injury in January. The topic of the monthly safety meeting was pinchpoint awareness. The topic of this safety meeting was recommended by the team investi gating the November incident in which an operator severed the tip of his finger it a closing door.
General
Several maintenance problems caused some unusually high downtime in the Compound Department in January. The increase in downtime, coupled with increasing flexible compound demand, tightened production schedules. Line III was down eighty-two hours during the month awaiting parts to repair the FCM starter. Replacement of Welex seals was responsible for forty-five hours of downtime in the dry blend unit. Line V was idle for the entire month of January due to a combination of light orders and repairs to the twin screw gearbox. Line I was down for twenty-eight hours during production trials of Plenex polymer formulations.
On January 6, the dry blend unit produced 356,554 pounds to set a new one-day production record. The previous record was 351,560 set on June 1, 1985. The setting of this new record was particularly significant as it came at a time when demand for our rigid compounds surged and the production schedule was extremely tight.
Operating
Compound Production
Davs
Line I
28
Line III
27.5
Line V
0
Total
% Prime
Capacity Utilization Factor
Downtime
bine I
Production (M Lbs.) Month Avg./Day
2126 3219 ____0 5345
98.3 .690
76 117
0
8232 13151
23722 97.9 .761
Hours
- Product Changes - Plenex Compound Testing - Miscellaneous Maintenance - Mill Maintenance - Quality Problems and Control
77 28 16 11
4
- FCM Starter Repair - Product Changes - Quality Problems and Control - Dicer Problems and Maintenance - Miscellaneous Maintenance
82 58
9 8 6
x
VAB.0001190213
COMPOUND - Continued
Operating Days
Month
Rigid Compound
28.5
5470
Prime
99.9
Capacity Utilization Factor
.932
192
Downtime
Hours
- We lex Maintenance - Product Changes Miscellaneous Maintenance - Quality Problems andControl
53 50 28 19
Operating __Davs
Month
Avg./Day
Plasticizer
29
% Prime
Capacity Utilization Factor
1614 85.5 .733
Fiscal Y.T.D. 17097 99.4 .710
Fiscal Y.T.D 6400 89.5 .770
J. B. Autrey, J. B. Hegwood
The Line V twin screw extruder was shut down for repairs to its speed reducing and drive gearboxes during the month. The speed reducing gearbox was replaced with a new gearbox. The twin screw gearbox was rebuilt after it was found that a bearing failure had occurred.
The vacuum jets on plasticizer reactors R-l and R-2 were removed for cleaning during the month because of an excessive calcium carbonate buildup.
The first quarterly PM program was completed on the dicers in the compound area this month. This should help reduce downtime and maintenance cost on dicers.
Numbers one and two Welex were shut down during the month for repairs. The gate was replaced on #1 Welex because of a leak. The shaft, sheave and seals were replaced on #2 Welex.
The temperature control loops were calibrated and the water flow meters cleaned on plasticizer reactors R-l, R-2, R-3 and R-4.
The starter on Line III FCM drive was replaced during the month.
A
VAB.0001190214
- J. B. Autrey, J. B. Hegvood
The alternate natural gas line was tested during the month. We will start using natural gas from ACG Company on February 1, 1990, due to favorable pricing.
The automatic water valve was repaired and the continuous blowdown line was replaced on boiler #1 during the month.
4
The east propane pump was removed, rebuilt and reinstalled during the month.
The control valves on boilers #1 and #3 were removed and rebuilt during the month.
i
VAB.0001190215
ENGINEERING - R. E. Folk, S. C. Hillman, C. J. McDonald
PROJECTS IN
- GENERAL
5305 Graininess Work
Decalcified water will be used instead of DI water for the calcium free water test run. Ion exchange with sodium will be used to remove the calcium. The test run is scheduled for March.
The EVC clean wall test kicked off in January. The clean wall has reduced reactor fouling and cull production. It also eliminates the final reactor rinse to sewer.
A closed reactor temporary addition syste: is being constructed for longer term testing.
VCSM
Work on the assignments continues on schedule. Plant engineers are still writing process descriptions/procedures, operator interface guidelines, and creating graphics panels. The team reviewed and re vised process control diagrams (PCD's).
TC Wastewater Compliance
Air stripping of rinse water in the blend tanks apparently will reduce VCM levels below TC compliance levels. The test run was cut short because it created high hard particles in the resin. A revised rinsing procedure will be tested.
Alternate Gas Supply
The new supply line is operating. February pricing with the new line will save approximately $1000/day.
Baehouse Replacement
DCE is designing a new air baffling system. Improper baffling has led to premature bag failures.
Plasticiser COD Reduction
A screening design showed no potential to reduce plasticizer COD by
adjusting the variables tested.
Reaction time was the most
significant variable and we already operate at the optimum value.
\.
mmmmm
VAB.0001190216
l
*
CO CO
3 si
S
s!
Ol L*-J c<nn
sUJ 3
cn _j
cn -* 5
3 *:
t
CO ass
S id
CO
CO
U
cn S id aaaa.
cn u.
u CO 2SE"-
<c
CO OS CO
a 3
SE
CO u
cn ei q us
... S tn H
a! 2 3 ~ 3
.3"-
u u3
333
ui m*-- OsT
3 ~
cn cn h cn cn
!j tu S Hi
CO CO
&
cn cn
CO 1
ti s
i CO * OL. i
CO
15 3
3-sis
CO i
KSSS8S
yst!sslla:is^s
EZ_ - i ZZ
_-~Ji X
u.
<S3l
^
CBttt
uu
SKS8Kta,a
glgfetotdt;
SUtJiUOCJI UI--JCUl i9t 3
O CO uj cn uj cn
s
cn . cn uj
, S
<2= t
uj
cn
co
cn
m
uj
-Sg*yMgSs
w3u
S3qul5BS
S 3 t= & fe
3$iu2uiSEuS
C uj hi m ^
cn nr u
cn cn
SSuj Hex*i Mon
_ uj Cm
E^gCSSdi!
uoj m
c* con --+ --f
umalla.aall5anS
MUMgO(nMgmtjQu(oS<
co
cn
m
cn
m
co
nr
cn
*--
tn
CO
cn
cn
n w wwmgi|fia)MgigiCowoi>Na>
co
O3C
CO co cn
co can scn s
co co cn
sgg
aCs3 s40 aCOs
sSSaissBs
ui cn
35&S
co cn
to - i ui UJ__a
cn ll 3 Ij
CO
2a-2e4
3ouE
SB
uj
PuoIi
cn cn u3i 3cn 3
S33333333333333ii3ii33
Scn o
5g
3 s> &
uj cn
_ cn
cn
CO UJ CO
s cn
s
333
^ W K K OC
s*i
s: | cocnn? ui aco. kui
3
*
Is
C*-i5g
* ffi fi ?= tr
SSuiufejcj^fcjgjSES^SujtnSat
fcJkl Cm
UJ C#i
tn4
*
UI sc
_6
3
_ CO
Si S a! n
SC 85
% UU (n u 5
gigigsig
m iggi
CC CO
csl* Ss
33
3 " 33 E S -
a* " CO UJ
^
_
340
2
333 M
z
ui
S5SoKSS
3 33
oc 3 3
>s!>SgSSt|jSu
SS SK 2 *
<n
3S3
9-J UJ
3
S 2 8S
SSSSS
VAB.0001190217
r mmmmmmmmmmmmmmmmmmmmmtmm
ENGINEERING - K .E . POLK. S .E . HILLHAN, C J . HeDONALD r
ENVIRONMENTAL - F. G. Jeanson
Water
/
All wastewater discharge parameters were met for the month of January.
Air
A meeting was held with the State to review our new air permit with the engineers that would be working on it. They had several additional items they wanted in the air permit application. The application was revised per the comments of the State and a second meeting was held to discuss the revisions. The air permit is expected to be issued in February.
Waste
Make-up RCRA training was completed for all persons who missed during the month of December.
Waste shipments for the month included:
- One bulk load of floor sweep to Chemical Waste Management's (CWM) Lake Charles, Louisiana facility.
- One bulk load of lead bags to CWM's Emelle, Alabama facility.
The Governor of Alabama proposed to increase taxes on all imported waste disposed of at Emelle, Alabama by 550% to $120/ton.
Sunerfund
We received a copy of NUS's report to EPA on the investigation of the four sites on our property. A meeting with EPA is scheduled in February to review the report and recommendations.
Miscellaneous
I attended Hazardous Materials Manager training during the month.
Total environmental costs for the 1989 calendar year were calculated to be $2.4 million. The new dryer baghouses were $1.5 million of this total.
The SPCC Plan Survey was completed during the month. Two work orders were written to repair dikes.
I attended Interaction Management and facilitator training during the month.
VAB.
3 an-90
HASTE REDUCTION INDEX SHEET
* OVERALL EXCLUDIN6 'TOTAL HASTE HATER*
MON-RECYCLED HASTE RECYCLED/SQLB HASTE
1*1 1 Offsite. Hazardous Hastes
3 MONTH
MR!
90 YTD
1989FY
89.551 79.491 96.601
88.981 B5.681 91.291
103.511 94.961 109.511
157.661 141.511 100.681
a. Land Ban Hastes s. Hazardous Solids c. Nan-Hazardous Treated as Hazardous
O.001 113.041 173.951
0.001 87.041 L60.BBZ
244.741 111.191 95.771
II. Recycled Hazaraous Hastes
57.921
60.571 103.511
!Ii. Offsite. Mon-Hazardous Haste
a. Recycled b. Ncn-Recycled
74.641
81.30Z
95.371
141.401 67.081
109.021 78.161
98.39Z 95.031
IV. Vunerable Bv-Products
100.541
95.651 U1.36Z
V. Total Haste Hater
113.761 115.671
95.011
VI. Air 4 Hater
a. SARA - Air t>. SARA - Hater c. Nan-SARA - Air :. t!or-SARA - Hster *
82.55Z
63.321
91.901
85.751
85.951
1228.631 1249.251
31.377.
42.441
k/V .v 117.431
88.051 592.12Z
98.301 37.2JZ
iHHMPMNipWI
II
i
VAB.OOOl190219
Jan-90
HASTE SECTION INDEX SHEET
Offsite. Hazardous Hastes a. Land Ban Hastes
1. Phtbaiic Anb*vdride
b. Hazardous Solids 1. Stabilizer S oill
2. Floor Seeeo4
c. Mon-Hazardous Treated as Hazardous
1. Plast. Filter Cake nL* Lead Baa* s
3. API Siuda* e
4. Pit tl Solids
Recycled Hazardous Hastes
a. Rec+ycled
1. Se oarator Oil
2. Safety# Kleen Solvent
1988FY
321409 2412 2412
7906B 16989 62079
239930 61670 68640 29620 80000
653226 653226 651700
1526
POUNDS
19B1FY
90 YTD
3 Nonth
329304 6006 6006
145636 0 0
124941 0 0
B9465 22425 67040
22037 5097 16940
22037 5097 16940
233833 56573 67860 29380 80000
123599
0
30100 66540 26959
102904
0
16200 66540 20164
688080 688080 686210
1870
126685 126685 12S7B0
905
93288 93288 92600
688
III. Offsite. Mon-Hazardous Haste * a. Receded 1. Orues 2. Pallets 3. Alusinua Cans. Paper, and Box 4. Scrap Metal
b. Non-Recyd ed 1. Landfill
2429430 247201
49600 145600
0 52000
2182229 2182229
2357718 247500 49600 145600 300 52000
2110218 2110218
632415 B6295 10950 45999 496 28850
546120 546120
447085 B6185 10950 34405 396 40434
360900 360900
IV. Vunerable By-Products a. PVC 1. Culls 2. Vacuus Vent Oust 3. Sifter Overflon 4. Pond Resin 5. Pit 12 Resin
3597456 3597456 471409 329480 801007 1915560
80000
4076656 4076656 330521 541016 504106 2621013
80000
1101753 1101753
55210 165981 59151 794452 26959
891821 891821
33690 124275 49939 663753 20164
V. Total Haste Hater
i. Effluent
1. Pond 6
VI. Air Ir Hater 5. SARA - Air 1. VCft
4424987560 4278245861 1638930897 1241168141 4424987560 4278245861 1638930897 1241168141 4424987560 4278245861 1638930897 1241168141
646617 73316 73316
604682 65694 65694
172508 20177 20177
131603 15500 15500
VAB.OOOl190220
m
9Mft - Ihtr 1. KOI 2. Nt^ctvl ntwu
kHMM - Mr 1. Particulatat 2. Bulfor Mori*
Moi WW - tlfttar 1. in
23*. cr*n
4. NH3
1W!
3I99VT 90 fll MO
S 22 33
2mM 2A3M
904
309040 43409 mm 199*1
1379
333 21
warn
213*0 990
274344 447* 33140 17321ft 1199
223
m
**s rmu
351
114304 27374 1917ft flli*lWA*l
237
1* 4
141
2004 20144
270
99*1 22917 14137
1 217
VAB
ENERGY
D. A. Moore
A. Unadjusted EUI
( 8.0%)
B. Adjusted EUI
( 8.4%)
C. BTU/Lb. Product
2661.0
D. Total Energy Consumption MMM BTU 138.1
( 12.0%) ( 12.8%)
2764.0
524.3
A. Maintenance
There were sixty-four energy related items completed in December. Fifty-two of these items were steam leak repairs. The remaining twelve were steam trap repairs.
No. 1
No. 2
No. 3
83.4% 83.2% 82.9%
83.5% 83.4% 83.1%
mm* r* P
II
VAB.0001190222
jawuww loon ftraamial - J. . Bull
Nona
Paul J. Kobar - Transferred to Lake Charles Chemical
Plant aa Plant Superintendent.
Gary Sanders - Employee bid from Compound Utility to Lab Trainee.
S^*il*s
Gray - Returned from Maintenance Helper to former
poaition. Lab Lead Technician.
Tommy Staten - Employee bid from Lab Technician "A" to Maintenance
None
None None
VAB.0001190223
*
ABERDEEN, MISSISSIPPI
Salaried Employees HourIt Employees Total Employees
mSnmo.monthlt
report"
76* Minority Employees #, %
172
Salaried
6
82
248
Hourly
66
38*
Total
72 29Z
Nev Enploreea Terminations
n
0 0
Hourly Min. Hired % Min. Hired
o 0
Hourly Min. Tan.
0
% Min. Ten.
DEPARTMENTS PAS agMyrnYPPS MIN. EM?. *MIH. MEO WTttF.fi YTTI T^M. Yjp TURNOVER YTP.
Warehouse 16 Gen. Plant 13
15 16
8 53
0 00 0
0
5 31 0 0 0 0 o 0
Maintenance 41
Laboratory 24
Compound
40
41 24 38
10 24 0 0 0 0 0............ 0 5 22 Q 0 0 0 0 0
26 67 0 0 0 0 n 0
Vinyl
33 33
10 30 o 0 0 0 q 0
Plasticizer 5
5
2 40 0 0 0 0 0 0
Number of Applicants:
Month
0
Tear To Date 0
APPLICANT BREAKDOWN:
# Minority
0 % Minority 0
# Female
0 % Female
0
* Includes 1 Co-op Student.
Hires (Hourly):
Month 0
Tear To Date 0
Teninations (Hourly):
Month 0 Tear To Date
0
Overall Turnover 0
Projected Annual Turnover 0
i
VAB.0001190224
m
r
IS
00
I
LU
L
I Is- I r- i I 4|
1 CT* i 00 1 O* 1 in t ro 1 CM
4
1 1
CM 4
i *
00 4
1 1
CM 4
1 |
00 4
1 1
A 4
1 1
4
I I
ft CM 1 m t CM 14 O 1fc ro i4 CM 1_A D
I
I
I
t I
Ch i in i ro i
<t>
ro
IS
I i i
I I CM t
I Ii
I Ii
II
t*
CO i o 1 tn i ro i CD 1 a> i in
I $
Is4
i j
o *
t 1
in 4
t |
ro 4
i |
CD 4
1 1
^ 4
i 1
in 4
.
4 14 <D 1 O 1 O 1 4 1 O 1 4 I CD
I
84 I
1
CO
CD
is CD t
t
<d I a>
I
I
I
I
sss
LU I I I I I
CO I
ro I
Io 14 oo o I 00
t I I
SI
Bs
i i
<
i in
i r-
m CM
s
i
UJ
I CM
t in oo t in
CM
COCO I
Ir
j i
SIS I CM I
I
I I
i
Ui t I 1 1 t
Ui I I
CO I
i
i
ro i o*1 *
OI CM I
I I I
in
CM
CD si
j I t I I
Io
II CD-
in i in
* CM *\ 4
in
in
cm
4
in
CMm
iOn Ii s
4i
sCO D I in I CJ II
CM I o*
CM I Si I 1
in
m
CM
CM I
ro i
in
4
i iiI
4
OIo
Ii
II
OC II <D
iO io
o>
UI
III 00*
i i CM I
4
ro
1s
I I **
o tiII ro
I
OI
I
I
II
II
I I I
I
t
I
$I o Si s in
I CD
CD CD
I
i in
i
I I CM
i ro
oeco i
I I CM I I in
in
4
ro
4
00 CM
ro
i i
r5o i
4
co Si S
I ro I
i t
i i i i r
a. i
Si
V
I I I
I I I I
I I I I I 1 I I I
I I I 00 I <t J I
I I
I% OCO I UJ I
8 1 I
I UI CO I
s 4
00
s
s 00
s CD
S 4 a>
in
CinD
4
in
s i4
O
s $
g
ro I
I I
in i in o
*
o CM
in i cm
i
t
i
i
ro t in t
i i i i i
D 4
CM
Sro ii in
s3
4| 4
CD
00
CM 00
*
<D in
CM
s 8 in
m4 CM CM
ro s
CM MO O*
S
in
in 4
in 8 in
4 M0
CM In
in
oo
CM
s sm <D 4
ro
ro
o in 1 4 s s jin i in
c a A *^ A| ^4
1 <D
$
i
s
1 *
l<D is
1rt
1 1
(CM iro
CO
o
CO ~<c t r
z
CO CO CO s sj
wmm
VAB.0001190225 tv
ADMINISTRATIVE SERVICES - J. E. Little
i
Safety
There were no safety instances this month. The department viewed the Hand Safety Training video.
Cost Savinas
Savings due to competitive bidding were $13,731 for January, and $62,839 for FY1990.
Savings due to prompt payment discounts were $1755 for January, and $8,876 for FY1990.
Warehouse - Finished Goods Inventory
Slow moving inventories are still a major concern. Fred Williams and Linda Michels are reviewing the various compounds.
Flexible - Line I Line III Line V
Rigid TOTAL SLOW MOVING
451,478 221,089 135,176
71.720 879,463
Included above are 98M pounds of slow moving.
Training
compounds.
1/23/89
- Pat Wells and Tommy Cummings attended facilitator training.
1/29 - 2/02 - Pat Wells attended The Management Process (TMP) in Hous ton.
- Judy Frossard, Paradox software - PMS conversion to PC application.
Leo Ezell is cross-training in the raw material warehouse.
- Janice Minga is cross-training for Stores Supervisor coverage.
Meetings
1/11 - 1/15 - QMP Managers Meetings - Mike Swierc, Tommy Cummings and Pat Wells attended.
1/15__:__1/25 - VMS updates (Maintenance and Administrative Services).
m
RVMlIMpVI
mmmrnmmmmmmmm
VAB.0001190226
Continued
Meetings - continued
mi
- John Stokes visited Aberdeen for a compound overview.
1/18
Dan Miller and Randy Polk - AFE cost tracking.
1/22 - 1/24 - Jack Little reviewed VMS implementation and startup problems at the Lake Charles Chemical Plant.
1/25
- OASIS Team - overview and plant operations.
.1
JT
VAB.0001190227
k
AIIIMII CIHICil PLAIT
SlirriM AIALTSIS
JAI0401 1000
-S0RBIIPI&RBUBT1S9 DRTI iPSRVAvMVPvTltSf -
piblic
ioiti
1PT/ITC
I1C1AIGI
IlSIl-BOLl IISII-PACIAGIO
22,111,(10 9,194,490 348,750
368,050 216,960
0
fluibli comm-mi
1,SIT,OH
iuiiiu comm-PACUGiB 2,912,120
IIG1B C0BP08RB-B8L1
iigii covom-nciuD
4,813,690 191,282
559,700 234,995
a
696,900 4,200
0 9
0 0
pusTicini
87,960 352,000
0
TOTAL
31,778,542 11,117,20$ 348,750
SUBMITS B! 101t-
BOLI:
tmm
1I8II
iuiiiu comm iicii comm PUSTICIUI
IA1LCAI
ISO
11 26 2
COSTOHI
PIC1IF
h COUOI CAIIIII
49 50
04 1 22 02
TOTAL JAIIAIT
198 50 78
TTD
P5BLIC
m/iTc BIC1AKI
72,107,220 38,616,570 341,750
1,117,704 941,750
0
S,Til,700 3,470,ISO 11,561,305 511,921
0 0
14,524,190 1,896,000
621,434
17,000
0 0
437,969 1,223,000 364,000
197,345,593 46,959,398 712,750
TOTAL
258 15 49 4
320
mi*
iisii
iuiiiu comm
IIOIB C0IPO9ID
PUSTICIUI
TOTAL TTD
PACIAGI9:
tJAIDIRT* BISII iuiiiu comm mu comm PUSTICIUI
TOTAL JAIIAIT
553 113 47 3 82 10 90
691 126
C6ST08I! P1CI0F
conoi CAIIIII
3 12 19 63 28
91
24 104
239 16 54 10
210
IOIC COIT1IIH A1I/0PS
0
+
1
0
0
0 0 0 0
10 3 0 0
10
13
905 66 146 19
1,131
TOTAL
25 106 10
1
142
ms* BISII ILIXIBLI COIPOHB
II6IB COIPOIID
PUSTICIUI
TOTH TTI
18 51 0 0 79 261 2 0 6 27 0 1 9 1 00
103 369 2 1
24 8 1 1
34
93 370 35
2
190228
500
r
LABOMTQRX - J. R. Williams
A. Safety - There were no safety incidents in the Laboratory for January. The monthly safety meeting topic was "Hand Safety" with Richard Williams in charge of the meetings.
B. Customer Contacts - None.
C' Customer Q.C. Problems Reports
1/30
- American Mirrex - When samples were tested from this railcar, there were "brass slivers" found in all compart ments . This was traced back to the failure of a piece of manufacturing equipment during the extreme cold weather.
D. Requests for Corrective Action - None
E. Product Waivers
Customer Grain Systems
Product 80273G WHT lio
Reason Low Fusion Torque
1 H/T
Eagle
80273G WHT 110
Long Fusion
3 R/C
F. RVCM Summary
RVCM of In-Process Samples
The following is a summary of residual VCM results on inprocess samples. None of the reactor daily averages exceeded 400 ppm RVCM during the month of January, 1990.
Reactor Slurries
________Drier
5265
5305
Number of Samples Average RVCM, ppm
924 133
67 0.795
44 0.747
Samples
The following is a summary of the residual VCM analysis of shipment samples for the month of January, 1990.
Product
Number of Samples
Average RVCM. ppm
5265 5305 5385 5395 5415 5465 Dry Blend Debox Pond
40 102
57 0
63 0
80 16
6
0.565 0.414 0.578 0 0.062 0 0.155 0.670 6.579
VAB.0001190229
LABORATORY - Continued
(based on dryer "regulars")
5265
Bulk Density Inherent Viscosity
(vs. 0.715 - 0.744) L Color A Color B Color % on Pan
(vs. 2%, max.) % thru 140 Mesh Drytime Mets I.R.
(vs. 95% of control) Hard Particles, (% > 10) Average particle size,
microns
1.44 0.64
--
4.60 3.17 2.83 2.27
--
0.62
--
--
--
-------
138
Flexible Compound
5305
2.13 1.27 0.60 2.40 3.50 2.50 3.08
--
1.23
--
--
-- --
148
5385
1.58 0.67
--
4.00 ---2.50 2.13
--
1.44 1.00 --
--
13.9
160
5415
1.30 1.05
4.56
3.33 6.17 1.17 4.73 1.17 2.55 1.57
2.4
173
Hardness Hard Particles Heat Stability Contamination Dicing Cross Contamination
Totals
Adjustments M Lbs. (%)
31.0
--------- ---
10.0
-- ---
41.0
(0.58)
--
(0.19)
-- --
- ---
(0.77)
M Lbs. (%)
7.5 25.5
--
6.0 4.2
44.5
(0.14) (0.48)
--
(0.11) (0.08) (0.02) (0.84)
A
Torque Rheometry
Total
Ui (0.06)
3.6 (0.06)
1. Minor problems with the load cell on the Syntech tensile tester were resolved through Dave Cox working with their technical people.
2. Several extra COD samples were run in support of the plasticizer test run.
3. Support was provided to Engineering in testing numerous samples for RVCM during two separate test runs.
m
VAB.0001190230
w mmmm
LABORATORY - Continued J. Miscellaneous - continued
4. Dave Cox participated in the Dayton Extruded Plastics DOE project.
5. A hard particle problem was experienced when using Aluche: AC-712K in 34862 GRY 546 for AT&T. This material was unable to be reprocessed into acceptable product. This is the second incident of this nature from using Aluchem AC712K.
VAB.0001190231
A
1
RESIN Ship Date 1/11/90 1/11/90 1/19/90 1/23/90 1/23/90 1/23/90 1/26/90
1/26/90 1/26/90 1/30/90 1/31/90 1/31/90 1/31/90 1/31/90
SAMPLE SHIPMENTS JANUARY 1990
Product 5385 Pond Resin 5385 5385 5415 Pond Resin 5265 5305 5415 5385 Debox Pond Resin Pond Resin 5385 Pond Resin
Amount 200 lbs. 250 lbs. 5 lbs. 200 lbs. 100 lbs. 5 lbs. 50 lbs. 50 lbs. 50 lbs. 4400 lbs 2 lbs 5 lbs. 5 lbs. 100 lbs. 50 lbs.
COMPOUND Ship Date 1/05/90
1/15/90 1/19/90
1/22/90 1/23/90 1/23/90 1/23/90
Product
18031 WAT CL 18961 NAT
16851 CB 50
240-128B GRY 568 240-170B GRY 568
2153 NAT
18961 NAT
9-746 CMPD.
9-746 CMPD.
Amount
500 lbs. 500 lbs.
100 lbs.
500 lbs. 500 lbs.
1500 lbs
100 lbs.
1 lb.
1 lb.
Customer PANIMEX (CHILE) LTDA. IFER DOMINICANA C. A. Dow Chemical El Paso PVC Essex SIMAQUIMICA Sheller-Globe
Dayton Extruded Plastics CENTURY ESLON LTD* Sedco Pipe HAROLD VELAZQUEZ INYECCIONES INDUSTRIALES C* ITOH
Conex of Georgia
Customer Universal Plastics
Vista Chemical - Austin P. W. Pipe
Encore Wire Corp.
Precision Trim
SIMAQUIMICA
FABRICA SANDALIAS BLUE
STAR
VAB.0001190232
Sample Shipments/Jan. 1990 Page 2
COMPOUND (Cont.)
Ship Date
Product
1/24/90
384 FR NAT 419-33D NAT
1/25/90
34643 NAT 35851 NAT 35852 NAT
1/26/90
15041 CB 50
1/26/90
38601 NAT 2153 NAT
1/29/90
9-712 9-746 9-803 9-856
DRYBLEND Ship Date 1/10/90
Product 426-90 WHT 110
Amount
250 lbs. 250 lbs.
100 lbs. 100 lbs. 100 lbs.
1500 lbs.
1500 lbs. 1500 lbs.
2 lbs. 2 lbs. 2 lbs. 2 lbs.
Customer West Penn Wire Corp. ALCAVE
Precision Trim Encore Wire Corp. Pushpa Int'l. Corp.
*
Amount 250 lbs.
Customer IFER DOMINICANA C. A.
VAB.0001190233
mmm
4
*
40
ABERDEEN CHEMICAL PLANT INJURIES
(Twelve Month Running Totals)
A
NUMBER OF NJURIES
J*B7F MAMJJASON OJ'WF MAMJJASQN DJ'89F MAMJJASQN DJ*90
TOTAL INJURIES
O OSHA RECORDABLE
VAB.0001190234
si/rus
ABERDEEN ENERGY CONSUMPTION
12 MONTH AVERAGE
VAB.0001190235
DEPARTMENTAL JS ANALYSIS REPORT
DISTRIBUTION LioT RUS, JFC, JVIJ, DEPARTMENT HEADS, FILE
1A/ 2/89 THRU 2/ 4/90
-A' \ ^ <\
I I
3i
Ui Ui
L9
CO
$<D 4
1/1
CSI
$
00
CM
m 00
$ 8
CM
004
III
I
<
00
0 t CM
tii in
ro
o $ro
$
CM
m5 ro CM
CM
CM
in
00
CM
CM
iono
ro
ro i CM
O
CM
I
IIIII
O
ro ro
in
'On* i OO 1
4
I4
1
f
O
4
1I
CM
4
o ro
I <1
tIIIP> j ro i in CM
CM
\I
co in 4
ro ro
'O ro 09 O I O oo -* CM IIII
0
hCO O
1 1
'O
4
1 1
O o
t
1
oCM
1
t
o
1 1
o
0
1 1
*o in
01
1 101 o10 1
o
CO
40 1
X 1
tn 1 o 1 00 i ro 1 O' t 0 1 4
tn I o ( 0 i CM I ro 1 0 1 0
Ui i
41
4i
41
41
41
4
sc t o r ro i
l **-- 1 0 1 ro
a
$
O IIIII o 0I
0 II1II M>
0
1 t
CO
CM
1
in
i i
o O
1 1
$
0 1010i 0 10 A
$ fw | in t r 1
O'
4
1|
in
4
i |
r i
41
4
CM 1 1 4- 1
co
aUcLunuJeotcH_nn--l
iiiiii
if>n*4 O'
111111
<0X> GO
11 111
in cr4o--o
t1 *11
iCnM rC0oM
O
in
in
i *
in CM
1 1
in CM
1 1
0
i i
0 0
1 1
0
in
i i
in
'O i r*- 1
1 ro i
in i CM
i CM 1 CM 1 ro i O' 1 0 i 0
1i 1 1 i O' 1 i
s
I
UiOUl i CM 1 CM 1 O' 1 CM i CM
ro i
3C 3C i
1 in 1 O' 1 ro i ' CM
* iHHM
H* h*
4 1
4
in
\ t
4
CM
1 1
4 0
1 1
fu
ro i
iOC 1 i CM 1 1 i
iui ee 1 i 1 1 i
i> tor- 1 i 1 1 i
iq<eco 1 t 1 1 i
ro in
in o*. CM in in
o in CM
mO 1 i 1 m f 0
in in 1 in i 0 1 CM I in CM
CM *o
s in
o- 1 co i O' 1 in 1 in
ro t CM MD 1
1 in
00
CM 1 ro i CM a CD 1 0
1 i i t CM
1 i i1
in
r0o
CM fO
1i i1
0 1 in i i 1
o0 1 CM i i 0 1
o ii o mi 'O ro
CM
iiti CM
in IO
in CM
<D
oo
in CM
in r
1 1
in
i i
in
i
9
in CM
1 1
1 1
in
O4'00
CM
ro
in
ro 0
ro
11 4
'O
1 1
CM
i t
O'
1 1
CM CD
f
1
CD
1 1
fw
oecnKOC in
CO sc
CM
CM
'O CM
ro
CM 1 'O i 0 1 CD CM 1 CM
1 ro i
1 in 1 -O 1 ro
a i 1 CM 1 CM 1
$
'O
00
ro
ro
to
CM CM 0
1| 4 ICM
in
cm
ro
CM
4
CM
in CM o CM
C0M0
m
cm
rCoM
cm
cn
*44 O CM 'O CM v w
CM
UI
tn
13 U.
cui
s
to Knot
ut
to
I
1 UI
utoi ii
u
9
UI
S! $
to II Ui
fs
o
t<nc ui
<c
rtHMHM
*****
VAB.0001190236