Document JN0D4DDR3X50d9v90EEGJMvXZ
Tll ALLSAX ifwUlih t1 ikial rm sack kg trcabtn 0*4 M Mum Ml* for problem o*to o*4 #* oil. II r' roeitreMost*
I*
HMI o (tested (tit* Mil do Iht trick, ALLPAX
<riO Imlii tpoclel pecking lw osscttp ileftt w root tpcdlk
m*<i. ALLPAX Sacking* to* be deposdod m to <mI to** become
Uw tail longer, tetoto raelltoecj, me toekpreef ritheef iicauN*
procure* o*4 protect egeimt tewing.
all rms
Aveitokto to utt, itog m
toon form hr twoporotwe*
to M0>; tpectof* l klgkar iMWmtBM.
ALSO Veto* 01m, Skeet Seeking, litotoor Peeking, Melded end Mpsdrel Col Seeking ting*. Pocking Heokt, Gdlhn Cutter*.
Send foe twiiili cetefog; eonlorf rone mwiI dltfrttirfer.
THE ALLPAX COMPANY INC.
805 Mamafoncck flve., Mamaroncck.N.Y.
5upf/Kfoi Sheet Polling . ., 0-1 Proof Sheet Parking . . Htd Pjfcbn Sheet Porting , . . Oiophragm Sheet Porting . . . (loth Inuiifd Sheet Porting
?a?6S T?QDQ
"Standard of the
Industry" FOR EFFICIENT STEAM GENERATION
Schools and institutions demanding low cost boilor operation with maximum steam output are an important part of the long list of Titus*
vllle 3-Drum Water Tube Boiler users in many different fields. May we consult on your coming needs?
Stols Teocber* College, tdinbare, Po.
!* RlMHPt TM Solan, 160 to., pneooeil, tewt. Cenirottan Ora* Careeiatlon. Ptmkvgty Pe.
JU
FIGHT POWER COSTS
1 f*wWh
operation com eharaubh 4
generator*.
-1
"Purclmjc price coveted 0M,'J
generator wilh eneilen, oil ,,18 cod hydrogen coolerj, o^S
iwltchgeor but oo ilollon , * or transformers.
"Condenser Factor wts tfj through much the ume appm, for four job*- had a weighted*! of 1.66. The erected cou,
direct charges, took in the ceL system wilh tubes, circulating coodeosate pumps, air jets, ` water piping to station wait, the portion of auxiliary elect, chargeable to condenser auxilu.,, porchaae price waa made np '
denier, tubes, air jets and padJ drive*.'
"By applying these factors u t] chase cost* of the major etemeu get an estimated figure that rep about 75% of ihe total. The o* 25% Is ehargeabte to building $0.65 to $1.20 per cu ft; depaij type) foundailoni, apeclel epplia
SUPERHEATER SLAG
oil, dew-point temperatures
to 275 F were recorded. This
a possibility that air-beater temperatures above 150 F wot sufficient to provent corrodon
dolomite additive, whereas, meulj peratures above 275 F would
quired without eddiUve. Analyses ol superheater dei
fore and after using sdditiw indieeted in the bar ehart on p 67. * out additives the deposits weres^
fused, roeklike substance. With fives the deposits ere granular,
more powdery.
J
Analysis of the deposit formed
alumina is the additive hJ
A1,0, composition of 53.7%. diestes that the alumina is df
with the eah in the seme propoi which it is added to the oiL Farini, peraturee are all above 2900 F. 1
In analysis of the deposit *1*1
mite, total sulfur as S0 b y] Indicating that the ash with do|
is more reactive to sulfur C0^IJ*
than that with alumina. The
dolomiie la 4.9%, which ntaf tributable to either ehsogej1^.1
ash analysis or dilation,
peratures with dolomite are
wilh alumina, but still eow higher than before using ed<d'"1
Dolomite lies been the sdd'
Ingli* for about one year. There
rowca
1. * seit**'" t ora*** " *ifO T-J* ""^**0"*"
|s new pump gives you 5 big cost advantages
in you pay is only one element J*t of a pump installation, ^engineering practice also figShe'cost of pump breakdowns, Writing efficiency, changeto meet new conditions, reSSwt parte inventories, evon the ISa'ce the installation takes up. re's why the new Goulds cen[l |jump is designed to improve *t experience in every one of
mento.
Jomblnes seven design fcajTthni moon maximum operaefficisncy and minimum TS/tdhee.
Mae of.lheee construction feaUtdadird witli this new design. jpT they offer you, without exg&t'.s quality of service that's 44; m i its approach to general ftaodling.
fipwsbje etuffing box bushings,
gtog housings sealed against future and dirt.
c. Cowl-type glands suitable for use wilh quenching liquids.
d. Stainless steel impeller keys.
e. -Teflon water seal rings.
(. Die-formed stuffing box packing,
g. Corrosion resistant gland bolts.
2o Interchangeability qf parts.
With only three shaft and rotating parts assemblies to provide for 19 pump sixes and 38 pump combina tions, this new design offers you a re markable range 01 interchangeable parts. A glance at the interchangeability chart on page 7 of the descrip tive bulletin will snow you:
a. how tilts design gives you great flexibility in making field changes should your pumping require ments change;
b. why the first cost of this unit is so low due to standardization in manufacture; and
c. how this interchangeability helps
to reduce spare parts inventories..
3, Compact construction. You will be particularly pleased with the short over-all length of this new design. Short bearing spans 1 cut lengths as much as S0%. This means a real saving in floor space.
4o Flexibility qf etuffing box. You can use either conventional stuf fing boxes or mechanical seals de pending on requirements. And you can chance from one to the other in the field u need be.
So Easy rotation change. A unique device, locking shaft seals, permits you to change from righthand rotation to left-hand rotation or vice versa in the field without construction changes.
More than 50 years of experience in meeting industry's needs for gen eral purpose centrifugal pumps come to a climax in this design.
DETAILS Ttl 11-page Uluelrated liul-
pWno. 7H.6, cover* the complete details of the EGoulds Fig. 3403, including specifications, Inter-
ptacsblllty tallies ami performance curve*, lie sure the whole cost-advantage story liefore you
B|*tsnaiher general purpose pump. Contact ymir ^rtlt Goulds representative or mall the coupon
s H GOULDS PUMPS, INC, Oept.PO, Senate Fells, N.Y.
Please send me Rullello No. 7tl.6.describing the new Fig. 3405 centrifugal pump.
| Company. I CI1V-