Document JJywyOd4kbEq8bXXmYodR4bw2
ABDOO175265
ANNUAL
VCM
1988
SURVEY
Table of Contents
I. The New Nodule II- The VCM Tank Farm III. The Old Module IV. Summation Chart
A
ABDOO175266
ANNUAL VCM 1988
SURVEY
### LEAK #
001 002 003 004
005
006 007 008
009
010 Oil 012
Part One The New Module
This component was' bagged -for the survey
COMPONENT TYPE
PPM
LOCATION
V (G)
300
Reactor 741, Shell level, East side evaculation valve stem
F <G)
300
Reactor 741, Condenser level, Northwest side tee to pressure gauge
F <G>
50 Reactor 741, Condenser level, FIange on smal1 vent line
F<G>
1000
Reactor 741, Condenser level, South side of condenser, pressure transmitter fitting
F (G)
1000
Reactor 744, Condenser level, Flange for Chem Nash, Rinse nozzle closest to reactor
F (G)
1000
Reactor 745, Condenser level, Second vent valve, Flange on top
F(G) F <G) F (G)
350 100
70
Reactor 745, Condenser level. East side of reactor flange, Bolt 411
Reactor 745, Shell level, Southeast side of reactor, Vacuum gau fitting
Reactor 745, Shell level, Northwest side evacuation valve flang (along siderail)
V (L)
1000
Reactor 743, Bottom level, Second VCM valve
F (G)
150
West RVCM receiver, Top level, North side pressure gauge
F (L)
200
West RVCM receiver, Middle level. North side elbow in insulated line
ABDOO175267
013
** 014
015
--A *# 016
-A ** 017
-A 01B
F (L)
V (L)
V/F(L)
V (L) V<L) F<L> V (L) V(L) V (L>
20 500
20
20 700
40
019 -A
020
021 022
** 023 -A
** 024
-A 025
** 026 -A -B -C -D -E
*# 027
028
V/F(L) F (L)
V/F(L)
V (L) V/F(L)
F(B>
F(G)
F <G)
F<G) F (G)
V (6) V <G) V (G) F (G) F (6) F <G) V <G)
V (G)
50 50 1500 50 250 50
20 100
150 200
FVCM receiver, Middle level, North side manway
North FVCM filter, Supply line, Diaphram valve
RVCM charge piping, Supply side, Equilibrium valve between RVCM charge pumps Zero
Top of RVCM filter, Bleeder valve Zero
Top of RVCM filter, Bleeder valve Zero
RVCM charge line, just before tie in to FVCM piping. Valve 019 V/F(L) 50 N FVCM filter, Discharge valve
North FVCM filter, Discharge valve Zero
Bottom of FVCM receiver, East side, Valve and/or flange
Bottom of FVCM receiver, Charge valve
Bottom of FVCM receiver, West side, Valve and/or flange
South seal water seperator, Top level Northeast side pressure gauge Zero
Recovery East VCM Fitting Zero
building, Second floor, condenser, Top pressure
gaug
North seal water seperater, Rupture disk
South Zero Zero Zero Zero Zero
vacuum
pump,
Discharge valve
West of south compressor, Equilibrium valve, CV--854
Recovery building. Ground floor, Middle of the east side, North/south transfer lines along ceiling, Bleeder val ve
ABDOO175268
ANNUAL VCM 1988
SURVEY
Part Two The VCM Tank Farm
## ### LEAK # 100 101 102
103 104
105
106
107
108 109 110
This component was bagged -for the survey
COMPONENT TYPE
PPM
LOCATION
VCG)
500
North VCM unload station. North of bridge, East side valve
V (L)
150
North VCM unload station. South of bridge. East side valve
F (L)
500
Middle north VCM unload station. South of bridge, VCM tank car connecting line
F (G)
500
Middle north VCM unload station, South of bridge, Nest side flange
F(L)
700
Middle south VCM unload station. East side, Plug on line south of VCM car
F<6)
50 Middle south VCM unload station, East side. Union on west side of VCM tank car
F(L)
70 Middle south VCM unload station, Nest side. North of bridge. Next to handrail, Flange
F (L)
50 South VCM unload station, East side North of bridge, Next to handrail. Flange below valve
F (G)
70 South VCM unload station. East side, Union on west side of VCM tank car
F (L)
500
South VCM unload station. East side. Union on south side of VCM tank car
V/F(L)
200
South VCM unload station, Nest side, North VCM railcar unloading line, Check valve
ABDOO175269
111 112
XX 113
XX 114 -A
-B
--C -D XX 115 XX 116 117
xx lie
119 120
V <L) V CL)
F(L)
V (L) F(L> F(L> V <L) V (L) F(L) F(L) V (G)
V (L)
F (G) F (L)
200 50 50
700
30 100
20 750
30 100
South of VCM sphere, VCM transfer pum Recycle valve to VCM sphere
Compressor shed. East pipe rack. Fourth vertical line from north. Horizontal valve, Stem
Compressor shed. East pipe rack. Third vertical line from north. Flange to sensall control
Compressor shed, East pipe rack. Second vertical line from north. Horizontal valve, Stem Zero Zero Zero Zero
Compressor shed, First compressor from south. South flange
Compressor shed. Second compressor from south. Pressure gauge fitting
Compressor shed, West pipe rack, Fourth vertical line from north, Check valve
Compressor shed. West pipe rack. Sixth vertical line from north, East vertical valve
South of VCM sphere. Relief valve. Discharge flange
South of VCM sphere, Middle of pipera FIange
ABDOO175270
ANNUAL VCM 1988
SURVEY
Part Three The Old Module
** ###
This component was bagged Tor the survey
LEAK # #* 200
COMPONENT TYPE
V(L)
PPM 70
#* 201
V <G)
200
202
F(L>
30
203
F(L)
700
** 204
F <L)
1000
** 205
F(L>
100
206
V (L)
100
207
VCL)
80
208
V/F(G)
150
#* 209 210
F (G) V/F(G)
500 100
211
F (G)
50
LOCATION
North RVCM receiver, Bottom level, Valve stem under receiver
South RVCM receiver, Top level, North side, Valve on receiver
South RVCM receiver, Between levels, West side, Grade level connection, FI
FVCM receiver, Second level, North side, Pressure gauge plug
FVCM receiver, Ground level, Charge line flange
North FVCM filter, South side, Pressure gauge connection
RVCM filter, East end, Top side, Val ve
Reactor 500, Bottom level. Main dump valve
Reactor 500, Shell level, Northeast side, Auto AMS injection val ve
Reactor 600, Shell level, North side, Vacuum gauge tubing
Reactor 600, Shell level, Northeast side, Auto AMS injection val ve
Reactor 400, Condenser level, North side, Thermowell stuck in flang
ABDOO175271
212 213 ** 214
V(G> V/F(G)
V(G)
70 100 100
215 216 ** 217
"A 218 219 220 221
V <G) F (G) F (G) F<6> F (G) 0(G) V (L) V(L)
500 1000
600
200 1000
500 700
Reactor 400, Condenser level, West side. Main recovery valve
Reactor 600, Shell level, West side, Secondary recovery valve
Reactor 700, Shell level, Southeast side. Valve off of f1ange
12 inch
Reactor 700, Condenser level, Southwest side, Secondary vent valve
Reactor 700, Condenser level, Southwest side. Rupture disk flange
Reactor 700, Condenser level, Northwest side, Rupture disk flange Zero
Reactor 300, Shell level, Manway Q-ring
Reactor 300, Condenser level, Chem wash/rinse valve
Reactor 600, Ground level. Secondary VCM valve. Stem
Reactor 700, Ground level, Main VCM charge valve, Stem
ABDOO175272
~]
vS vS V] nr m <r
35
sS . 1--------rO
J 0 o n 7- -- o co LO Oo
h
o H
m lr>
V) L/) ; - v9
E^~ ns
CQ
0
ID
?Gvrt?^ a zr Ln ex O' 7" as If)
co
o
*
X 5 oooj o 0 0 0 0 0 o o
o
e
CV?l > 5? 5 ooi
o
AUJSJf oz
ZfOl > n. > o~L o
Q 0
V) 0 -- 0 o zr 0 o
<0 O
-- or
zr - zr
UJ >< >9<?<?l o o -- nf o o -- OS
_u <
O50t>* J< 7 O0\ 3-
--
<v?
H
3- nf
Oo
to
>
> >92 o -- -- n(
AO os vQ
m
^9 to
ui X > J?f>0l IV) 0 -- 0 O - 7- --
o
2
<_i
C?90I > x >091 zr --
-- L0 ni oo <5o
u- a<3) > X > OC m *7 - - 3" -- a-
u_oooi
S'
b_rO=Jj>
bUA:<=J}>
1 t
VoO A
^ ' 52UJ
-Q
2'
2ual :
S
As
o Q
ic/i
o
O(--i D --V<--31<
st/*=? QlOOXl 1W10190S
Lfl
LO
_j'
cC
i\O
l--