Document JJywyOd4kbEq8bXXmYodR4bw2

ABDOO175265 ANNUAL VCM 1988 SURVEY Table of Contents I. The New Nodule II- The VCM Tank Farm III. The Old Module IV. Summation Chart A ABDOO175266 ANNUAL VCM 1988 SURVEY ### LEAK # 001 002 003 004 005 006 007 008 009 010 Oil 012 Part One The New Module This component was' bagged -for the survey COMPONENT TYPE PPM LOCATION V (G) 300 Reactor 741, Shell level, East side evaculation valve stem F <G) 300 Reactor 741, Condenser level, Northwest side tee to pressure gauge F <G> 50 Reactor 741, Condenser level, FIange on smal1 vent line F<G> 1000 Reactor 741, Condenser level, South side of condenser, pressure transmitter fitting F (G) 1000 Reactor 744, Condenser level, Flange for Chem Nash, Rinse nozzle closest to reactor F (G) 1000 Reactor 745, Condenser level, Second vent valve, Flange on top F(G) F <G) F (G) 350 100 70 Reactor 745, Condenser level. East side of reactor flange, Bolt 411 Reactor 745, Shell level, Southeast side of reactor, Vacuum gau fitting Reactor 745, Shell level, Northwest side evacuation valve flang (along siderail) V (L) 1000 Reactor 743, Bottom level, Second VCM valve F (G) 150 West RVCM receiver, Top level, North side pressure gauge F (L) 200 West RVCM receiver, Middle level. North side elbow in insulated line ABDOO175267 013 ** 014 015 --A *# 016 -A ** 017 -A 01B F (L) V (L) V/F(L) V (L) V<L) F<L> V (L) V(L) V (L> 20 500 20 20 700 40 019 -A 020 021 022 ** 023 -A ** 024 -A 025 ** 026 -A -B -C -D -E *# 027 028 V/F(L) F (L) V/F(L) V (L) V/F(L) F(B> F(G) F <G) F<G) F (G) V (6) V <G) V (G) F (G) F (6) F <G) V <G) V (G) 50 50 1500 50 250 50 20 100 150 200 FVCM receiver, Middle level, North side manway North FVCM filter, Supply line, Diaphram valve RVCM charge piping, Supply side, Equilibrium valve between RVCM charge pumps Zero Top of RVCM filter, Bleeder valve Zero Top of RVCM filter, Bleeder valve Zero RVCM charge line, just before tie in to FVCM piping. Valve 019 V/F(L) 50 N FVCM filter, Discharge valve North FVCM filter, Discharge valve Zero Bottom of FVCM receiver, East side, Valve and/or flange Bottom of FVCM receiver, Charge valve Bottom of FVCM receiver, West side, Valve and/or flange South seal water seperator, Top level Northeast side pressure gauge Zero Recovery East VCM Fitting Zero building, Second floor, condenser, Top pressure gaug North seal water seperater, Rupture disk South Zero Zero Zero Zero Zero vacuum pump, Discharge valve West of south compressor, Equilibrium valve, CV--854 Recovery building. Ground floor, Middle of the east side, North/south transfer lines along ceiling, Bleeder val ve ABDOO175268 ANNUAL VCM 1988 SURVEY Part Two The VCM Tank Farm ## ### LEAK # 100 101 102 103 104 105 106 107 108 109 110 This component was bagged -for the survey COMPONENT TYPE PPM LOCATION VCG) 500 North VCM unload station. North of bridge, East side valve V (L) 150 North VCM unload station. South of bridge. East side valve F (L) 500 Middle north VCM unload station. South of bridge, VCM tank car connecting line F (G) 500 Middle north VCM unload station, South of bridge, Nest side flange F(L) 700 Middle south VCM unload station. East side, Plug on line south of VCM car F<6) 50 Middle south VCM unload station, East side. Union on west side of VCM tank car F(L) 70 Middle south VCM unload station, Nest side. North of bridge. Next to handrail, Flange F (L) 50 South VCM unload station, East side North of bridge, Next to handrail. Flange below valve F (G) 70 South VCM unload station. East side, Union on west side of VCM tank car F (L) 500 South VCM unload station. East side. Union on south side of VCM tank car V/F(L) 200 South VCM unload station, Nest side, North VCM railcar unloading line, Check valve ABDOO175269 111 112 XX 113 XX 114 -A -B --C -D XX 115 XX 116 117 xx lie 119 120 V <L) V CL) F(L) V (L) F(L> F(L> V <L) V (L) F(L) F(L) V (G) V (L) F (G) F (L) 200 50 50 700 30 100 20 750 30 100 South of VCM sphere, VCM transfer pum Recycle valve to VCM sphere Compressor shed. East pipe rack. Fourth vertical line from north. Horizontal valve, Stem Compressor shed. East pipe rack. Third vertical line from north. Flange to sensall control Compressor shed, East pipe rack. Second vertical line from north. Horizontal valve, Stem Zero Zero Zero Zero Compressor shed, First compressor from south. South flange Compressor shed. Second compressor from south. Pressure gauge fitting Compressor shed, West pipe rack, Fourth vertical line from north, Check valve Compressor shed. West pipe rack. Sixth vertical line from north, East vertical valve South of VCM sphere. Relief valve. Discharge flange South of VCM sphere, Middle of pipera FIange ABDOO175270 ANNUAL VCM 1988 SURVEY Part Three The Old Module ** ### This component was bagged Tor the survey LEAK # #* 200 COMPONENT TYPE V(L) PPM 70 #* 201 V <G) 200 202 F(L> 30 203 F(L) 700 ** 204 F <L) 1000 ** 205 F(L> 100 206 V (L) 100 207 VCL) 80 208 V/F(G) 150 #* 209 210 F (G) V/F(G) 500 100 211 F (G) 50 LOCATION North RVCM receiver, Bottom level, Valve stem under receiver South RVCM receiver, Top level, North side, Valve on receiver South RVCM receiver, Between levels, West side, Grade level connection, FI FVCM receiver, Second level, North side, Pressure gauge plug FVCM receiver, Ground level, Charge line flange North FVCM filter, South side, Pressure gauge connection RVCM filter, East end, Top side, Val ve Reactor 500, Bottom level. Main dump valve Reactor 500, Shell level, Northeast side, Auto AMS injection val ve Reactor 600, Shell level, North side, Vacuum gauge tubing Reactor 600, Shell level, Northeast side, Auto AMS injection val ve Reactor 400, Condenser level, North side, Thermowell stuck in flang ABDOO175271 212 213 ** 214 V(G> V/F(G) V(G) 70 100 100 215 216 ** 217 "A 218 219 220 221 V <G) F (G) F (G) F<6> F (G) 0(G) V (L) V(L) 500 1000 600 200 1000 500 700 Reactor 400, Condenser level, West side. Main recovery valve Reactor 600, Shell level, West side, Secondary recovery valve Reactor 700, Shell level, Southeast side. Valve off of f1ange 12 inch Reactor 700, Condenser level, Southwest side, Secondary vent valve Reactor 700, Condenser level, Southwest side. Rupture disk flange Reactor 700, Condenser level, Northwest side, Rupture disk flange Zero Reactor 300, Shell level, Manway Q-ring Reactor 300, Condenser level, Chem wash/rinse valve Reactor 600, Ground level. Secondary VCM valve. Stem Reactor 700, Ground level, Main VCM charge valve, Stem ABDOO175272 ~] vS vS V] nr m <r 35 sS . 1--------rO J 0 o n 7- -- o co LO Oo h o H m lr> V) L/) ; - v9 E^~ ns CQ 0 ID ?Gvrt?^ a zr Ln ex O' 7" as If) co o * X 5 oooj o 0 0 0 0 0 o o o e CV?l > 5? 5 ooi o AUJSJf oz ZfOl > n. > o~L o Q 0 V) 0 -- 0 o zr 0 o <0 O -- or zr - zr UJ >< >9<?<?l o o -- nf o o -- OS _u < O50t>* J< 7 O0\ 3- -- <v? H 3- nf Oo to > > >92 o -- -- n( AO os vQ m ^9 to ui X > J?f>0l IV) 0 -- 0 O - 7- -- o 2 <_i C?90I > x >091 zr -- -- L0 ni oo <5o u- a<3) > X > OC m *7 - - 3" -- a- u_oooi S' b_rO=Jj> bUA:<=J}> 1 t VoO A ^ ' 52UJ -Q 2' 2ual : S As o Q ic/i o O(--i D --V<--31< st/*=? QlOOXl 1W10190S Lfl LO _j' cC i\O l--