Document JJBjxwrppVZJYrq1GxMe8k756
TECHNICAL CENTER SERVICES
UrilON CARBIDE CGRPOKp TICN ENGINEERING AND TECHNOL OGT StR/iCES
SOUTH CHARLES TON, WEST VIRCiN'A
MEMORANDUM
February L, 198-1
PLAINTIFF'S EXHIBIT UC-2678
To:
J. W. Karn Sistersville Plant
J. W. Bar na M . K. Bell M. W. Bosserman C. P . Maxwell M. L. Mills R. L . Noble
D. R. Paugh R . F.. Pee le H. H. Pri ce B . H. Avashia, R . G. Rowe, M.
From:
M. A. Patel
Subject:
Asbestos Monitoring of Construction Employees at the Sjstersville Plant
On January 12, 1984, Mark Dell and. this writer of the Technical Center Industrial Hygiene group visited the Sistersville Plant to conduct personal exposure monitoring for asbestos fibers while Constructrion Department employees stripped asbestos-containing insulation from pipes at the Steam Plant.
The monitoring was done during the entire stripping operation for that day. The balance of the day when there was no monitoring done, the insulators used that time to in sulate the stripped pipes with non-asbestos insulation. The results of monitoring are shown in the attachment which show that all the employees who were monitored worked in the area where the potential for exposure to asbestos was below Lhe cur rent Federal 0S1IA standard of 0.5 fibers per cc of air. All employees involved in the stripping operation wore full body hooded coveralls, gloves, safety glasses and respirtor approved for use for asbestos. The area was properly barricaded, insu lation was wetted down while stripping and the. grat.ting was covered to collect any insulation which might: fall down.
Ple<ise notify all monitored e.mplovees of their exposure results .
MAP/sc
At
I-
UCC 024500
3USINE55 I
CONFIDENTS
PERSONAL EXPOSURE MOMITORL NG FOR ASBESTOS AT THFO SI STERSVILLE PLANT January 12, 1984
NO.
NAME
CRAFT
SAMPLING TIME/MIN
EXPOSURE LEVEL Fibe
1 R.L. Pauley
Insulator
2 B.E. Kelly
Laborer
3 H. P. Stewart
Insulator
4
R.L. Hilverding
T nsulat or
5 L . R. Shaffer
Insulator
89 82 88 88 86
.27 .08 .15 . 24 . 17
UCC 024501