Document J51LnvBBYz1OBnga8Z62Dxya
6
H
TENNECO POLYMERS, INC.
(COMPANY)
INTEROFFICE COMMUNICATION
FOR: FROM: RE:
R. R. Neugold
F. W. Kanzler
PERSONNEL MONITORING, VCM SEPTEMBER, 1984
DATE: October 16, 1984
CC: R. S. Cole W. W. Heal J. W. Kachtick J. Kotrla R. H. Mathis W. Miringoff
Attached is the listing of those employees monitored for VCM exposure during the month of September, 1984.
Five of the thirty-five employees monitored revealed 8-hr. TWA's above the PEL.
Dispersion Foreman, 9/21/84:
#1 BT foamed out at the exhaust port. The employee was in the area during the TEST run of the new liquid screener. No M.T.
Tower Operator, 9/6/84:
Leak on emulsifier scale. If2 filter open, exhaust net working. Leak In SO valve in penthouse. No M.T.
GSO, Reactor Cleaner, 9/14/84:
Bird watching R-7. No M.T.
Reactor Operator, Dump, 9/13/84:
Leak from F-101 drifted to BT's. Inspected chip basket during batch transfer. 10 minutes M.T.
Maintenance Mech., 9/6/84:
Repaired leaky union on "A" emulisifer scale. No M.T.
Two area samples were taken in the Suspension Plant construction area. The samples were taken at the S-4 on the first and second floor. Both samples showed a 8-hr. TWA of O.lppra, VCM.
FWK:pjd Attch.
irul
Kaw*/s
F. W. Kanzler
TEN 2156
TENNECO POLYMERS - BURLINGTON, NEW JERSEY ANALYTICAL SERVICES
8-HOUR CHARCOAL TUBE MONITORING FOR VINYL CHLORIDE SEPTEMBER, 1984
Employee
Dispersion Foreman: T. Tudor
Suspension Foreman: C. Hunt
Tower Operators: A/B-Plnt - Chrg A. Flowers E. Kemble A. Lemma A-Plnt - Dmp F. Regn W. Dunlap F. Bowling J. Canterbury B-Plnt - Dmp W. Teague N. Borel C. Harker P. Koveloski
Atomizer Operator: J. Clyde
GSO Jet Tower: C. Ptaszenski
GSO Reactor Cleaner: Mike Ptaszenski
Suspension Dryer: S. Ogozalek
Reactor Operators: Copolymer - Chrg D. Phillips G. 'Robinson J. Trexler C. Goldsmith Copolymer - Dmp T. Robinson L. Hustus R. Graham
Shift
C
C
A D C B B C A A D B C
B
B
B
C
A D B C B C A
Date Monitored
9/21
9/21
9/5 9/6 9/20
9/13 9/13 9/20 9/27
.
9/5 9/6 9/13 9/20
9/14
9/14
9/14
9/21
9/5 9/6 9/13 9/20
9/13 9/20 9/27
Pump Number
B/A Minute
50
40
20 40 50
20 60 4 10 20
4 15 20 50 60
40
2 60
60
20
10 1 15 1 10 1 10
4 10 2 15 10
VCM
sss.
1.6
0.1
0.9 1.5 0.3 0.2 0.3 0.3 0.2 0.3 0.1 0.5 0.2
0.1
0.1
1.3
0.5
0.5 0.4 0.6 0.3 1.7 0.2 0.3
TEN 2157
Page 2
Maintenance Mechanics: L. Bozarth H. McDaniels E. Cognigni G. Hamilton
Day Day Day Day
Utility: 0. Wood
A
ARDO: R. Wiggin
B
Search & Secure: W. James
Day
Effluent: H. Stellwag
C
Construction Watch: --W. Simpkins
Day
Area PVC 2nd Fir
-
Area PVC 1st Fir
-
9/5 9/5 9/6 9/6
9/27
9/14
9/14
9/21
9/26 9/26 9/26
5 0 0.0 6 0 0.1 6 0 0.1 5 0 2.4
4 0 0.3
5 0 0.0
1 0 0.0
6 0 0.2
2 0 0.0 4 0 0.1 1 0 0.1
F.W. Kanzler 10/4/84
TEN 2158