Document J51LnvBBYz1OBnga8Z62Dxya

6 H TENNECO POLYMERS, INC. (COMPANY) INTEROFFICE COMMUNICATION FOR: FROM: RE: R. R. Neugold F. W. Kanzler PERSONNEL MONITORING, VCM SEPTEMBER, 1984 DATE: October 16, 1984 CC: R. S. Cole W. W. Heal J. W. Kachtick J. Kotrla R. H. Mathis W. Miringoff Attached is the listing of those employees monitored for VCM exposure during the month of September, 1984. Five of the thirty-five employees monitored revealed 8-hr. TWA's above the PEL. Dispersion Foreman, 9/21/84: #1 BT foamed out at the exhaust port. The employee was in the area during the TEST run of the new liquid screener. No M.T. Tower Operator, 9/6/84: Leak on emulsifier scale. If2 filter open, exhaust net working. Leak In SO valve in penthouse. No M.T. GSO, Reactor Cleaner, 9/14/84: Bird watching R-7. No M.T. Reactor Operator, Dump, 9/13/84: Leak from F-101 drifted to BT's. Inspected chip basket during batch transfer. 10 minutes M.T. Maintenance Mech., 9/6/84: Repaired leaky union on "A" emulisifer scale. No M.T. Two area samples were taken in the Suspension Plant construction area. The samples were taken at the S-4 on the first and second floor. Both samples showed a 8-hr. TWA of O.lppra, VCM. FWK:pjd Attch. irul Kaw*/s F. W. Kanzler TEN 2156 TENNECO POLYMERS - BURLINGTON, NEW JERSEY ANALYTICAL SERVICES 8-HOUR CHARCOAL TUBE MONITORING FOR VINYL CHLORIDE SEPTEMBER, 1984 Employee Dispersion Foreman: T. Tudor Suspension Foreman: C. Hunt Tower Operators: A/B-Plnt - Chrg A. Flowers E. Kemble A. Lemma A-Plnt - Dmp F. Regn W. Dunlap F. Bowling J. Canterbury B-Plnt - Dmp W. Teague N. Borel C. Harker P. Koveloski Atomizer Operator: J. Clyde GSO Jet Tower: C. Ptaszenski GSO Reactor Cleaner: Mike Ptaszenski Suspension Dryer: S. Ogozalek Reactor Operators: Copolymer - Chrg D. Phillips G. 'Robinson J. Trexler C. Goldsmith Copolymer - Dmp T. Robinson L. Hustus R. Graham Shift C C A D C B B C A A D B C B B B C A D B C B C A Date Monitored 9/21 9/21 9/5 9/6 9/20 9/13 9/13 9/20 9/27 . 9/5 9/6 9/13 9/20 9/14 9/14 9/14 9/21 9/5 9/6 9/13 9/20 9/13 9/20 9/27 Pump Number B/A Minute 50 40 20 40 50 20 60 4 10 20 4 15 20 50 60 40 2 60 60 20 10 1 15 1 10 1 10 4 10 2 15 10 VCM sss. 1.6 0.1 0.9 1.5 0.3 0.2 0.3 0.3 0.2 0.3 0.1 0.5 0.2 0.1 0.1 1.3 0.5 0.5 0.4 0.6 0.3 1.7 0.2 0.3 TEN 2157 Page 2 Maintenance Mechanics: L. Bozarth H. McDaniels E. Cognigni G. Hamilton Day Day Day Day Utility: 0. Wood A ARDO: R. Wiggin B Search & Secure: W. James Day Effluent: H. Stellwag C Construction Watch: --W. Simpkins Day Area PVC 2nd Fir - Area PVC 1st Fir - 9/5 9/5 9/6 9/6 9/27 9/14 9/14 9/21 9/26 9/26 9/26 5 0 0.0 6 0 0.1 6 0 0.1 5 0 2.4 4 0 0.3 5 0 0.0 1 0 0.0 6 0 0.2 2 0 0.0 4 0 0.1 1 0 0.1 F.W. Kanzler 10/4/84 TEN 2158