Document J3vLVYgLByGRqG9q6x7GkGwr6
wwivuvui abb
/ ivibbtiMVJ wi jul i iu, i/#w
Pagal - 4
PROJECT REQUEST
Probiei. ,o,
2028
Ethyl Corporation
_y )
Date
/________________________________: ___________________________________________________________
6/14/78 _
Project No.
B-2028
Approp. Request No.
5
1. Division - D*>artment
Manufacturing
2, Location V
'
Baton Rouge/Ls'.
Project Accounting Location
Baton Rouge Plant
1 Title
4. Primary Justification
VCI Emissions Reduction - EPA
Pollution Abatement
& Project Description
This Part 5 request for $250,000 is to provide additional facilities required to meet Environmental
Protection Agency National Emissions Standards for Hazardous Air Pollutants Standard for Vinyl
Chloride at the Baton Rouge plant.
These facilities are required to provide means to operate the PVC plant without an atmospheric vent for the vinyl chloride recovery system. The existing atmospheric vent cannot be used after 10/21/78.
Appropriations to date for the 4 previous parts have totaled $1,650,000. A Part 6 request will be submitted in August, 1978 to cover the remaining facilities needed to establish compliance with EPA regulations.
This request includes funds to start engineering, purchase long delivery items, and begin construction when necessary to meet the compliance deadline of items which will be included in the Part 6 request
The primary justification for this project is pollution abatement.
& Estimated Expenditure!
. Fixed Investment b. Working Caoitsl c. Operation, d. Other
A. Thi, Request
. 250.000
B. Appropriated to Data C. Futurt Request*
s 1.650.000 . s Undefined*
7. WriteOff
Total Project Expenditure!
Original Coit 1 _M | Depreciation
| Salvage Value
* 250,000
s 1,650,000
$ Undefined*
D. Total Project $ Undefined*
s Undefined*
Net Writeoff
s
s
$
$
8. Included in Capital Budget? What Year?
No
^Ve!-.p-> 1978
Ref. No.
If Subetitution. give effect on return
^ Amount
$355,000**
9. Patent!
Project will be examined for patentable features.
10. Forecart Disbursementa-Fixed Inveetment
Thil Veer
250.000
1). CEaclocunloamtioicn-S1ufmAmItaermy-aBtca(sse)dUosnedS,taAnttdaacrdh Details
This Request
Subaaquent yean
Fixed Investment
s 250,000
Total Project
$ Undefined*
Total
250.000____
Other Expenditures
Physical como. Nov '78
UChh of Estimate - This Request
Speculative
14. Lean Commitment,:
Annual Amount
Term
Total
After Tax Saving, Or Income Payout Period
s 250,000 s
$ Undefined* s
Yrs. Yrs.
None
Working Capital Requirements Total Capital Return on Total Capital Drecounted Rate of Return
S s 250.000
t Undefined* %% %%
IS. Remarks end Ultimate Effect
Total project expenditure is undefined at this time. Based on known scope, the total project cost is
expected to be $2.2M . Compliance is required by October 21, 1978. ** $800M budgeted, $445M approved on Part 4, 5/8/78.
tT.tMDIilD
FC 2780
"TiitT
VCI Emissions Reduction - EPA
18. Explanation and EoonomtoJuftifiotion
This request for $250,000 will provide funds for the following:
Proton No.
2028
Pi2 of 4
Pro)act No.
B-2028
RaquMtNo.
PVC-14 - Install revised controls for the vinyl chloride recovery system. FVC-15 - Install a degasser stream oxygen analyzer system. PVC-18 - Install a new head space analyzer in the PVC plant quality control lab. Part 6 - Start engineering, purchasing, and initial constiuction of future items as required to meet
EPA compliance.
ECONOMICS: Justification is pollution abatement. This project is required to comply with EPA regulations.
ENVIRONMENTAL AND ENERGY IMPACT: See attached sheet.
CAPITOL PRO RATES TO DIVISIONS: Plastics Division: 100%
17. Tax Item.: Qualifier for Pollution 5-yr. Write-Off
CJYev
No
Oualifiet for Tax Exemption Cartif.
lYe* jNo
If Special Depreciation Allowance if Available, Datcrihe:
18. RaqueftiApprovadBy
J Othar Approval! I (Indicate Raaponribillty)
Divirion (Primary,
W ,r .Xtmstrong
Chial Enginaaror Divirion Englnavr
co^Mnaw'Sr' Vice President Co-SponjotAsst, Dir.Mfg.JechyyServ
j*Manufacturing or Production Managtr~~
(Manufacturing Raappoonnrriibbiilllttyy))^,
W. C. Stroder Qj, , JW.L Asst .Gen .Mgr .Manrfacti
D. E. Park
Co-Sponvor
Co-Sponior
\
A. O. Wikm
Divirion Economic! Coordinator (Approval of Economic*)
T. A. Leeper
Divkion Financa (Financa Raviawr)
& E. H. Rachel
.
f
Co-Sponvor
P. S. Richard
2781
Page 3 of 4
Environmental and Energy Impact: Project PVC-14 will eliminate an existing atmospheric vent line
that vents vinyl chloride gas (recovered monomer) to the atmosphere when the incinerator is shut down or overloaded. Project PVC-15 is expected to avoid conditions (air leakage into recovered monomer) that lead to incinerator overloading. These combined projects are expected to allow the monomer recovery system to operate with no vents to the atmosphere, except for those which occur through safety relief valves. The quantitive amount of vinyl chloride that presently vents to the atmosphere through the existing yent line is not accurately known; however, a significant decrease in atmospheric emissions should result from the projects. The net electrical energy requirement for the facilities covered by this request is 8.5 M KWhr per year.
ET, 278?
Page 4 of 4 PROJECT ESTIMATE
Exhibit D
No. 20281
Title; VCI Emission Reduction - EPA_________ Date of Estimate 5/31/78
Appropriations 1, 2, 3, 4 New Investment
This Part 5 Request
Estimate No. 2231 K Class of EstimateSpeculative
Total Project
$1,650,000
PVC-14 Monomer Controls PVC-15 Oxygen Analyzer PVC-18 Head Space Analyzer
$78,000 42.000 30.000
Engineering, purchasing, and initial construction of future items
95,000
Sub-total
$245,000
Scope Definition Contingency
5,000
Sub-total
$250,000
Investment Total*
250,000 $1,900,000
`Investment Total; Based on (!) Start of Engineering
(ii) Start of Construction
(iii) Mechanical Completion by
in progress
7/1-V78
TQ/21A8
Included in Engineering Department Quarterly Forecast dated 3/TA/78 Not included in last Engineering Department Quarterly Forecast but estimated net effect is:
EC 2783
FOR EXECUTIVE C .viMITTEE ACTION AT MEETING O' TJLY 11, 1978
ETHYL CORPORATION
INTER-OFFICE
June 22, 1978
To: From: Subject:
Mr. R. Herzog
Wallace F. Armstrong
VCM Emission Reduction, EPA Project B-2028-5
cc: Executive Committee Mr. L. E. Blanchard, J Mr. B. C. Gottwald Mr. F. D. Gottwald Mr. F. D. Gottwald, Jr, Mr. R. Herzog
Mr. K. F. Cast Dr. W. E. Foster Mr. A. W. Helwig Mr. J. U. Jensen Mr. J. H. Kirby Mr. C. W. Montgomery Mr. R. A. Moser Dr. C. M. Neher Mr. D. E. Park Mr. W. C. Strader Mr. A. O. Wikman
AUTHORIZATION REQUESTED
Approval is requested for the attached Part 5 request of project B-2028, **VCM Emission Reduction-EPA". This request is for $250,000 and increases the total appropriations for B-2028 to $1,900,000. A Part 6 request, also on the order of $250,000 will be submitted in August and will complete the program as it is now understood. The program must be completed in accordance with regulations by October 21, 1978.
BACKGROUND AND DISCUSSION
On April 4, 1978, EPA denied Ethyl's waiver request involving use of a flare as a control device to eliminate VCM emissions. EPA stated in their letter that unless a plan was submitted to achieve compliance by October 21, 1978, Ethyl would be subject to appropriate legal remedies.
At the May 9 Executive Committee meeting, we received approval to submit an alternate plan to EPA. The main parts of the alternate plan are:
Make process equipment and operating procedure changes in the PVC Area to improve the service factor of the existing incinerator and eliminate atmospheric venting of the incinerator feed gas.
Eliminate flare burning of two process vents in the Hydrocarbon Area by incineration of these vents in an existing VCM furnace. The stack gas would be monitored to comply with the regulation. The inability to monitor flare emissions was the main point cited in EPA's denial of use of the flare.
EC P7B4
2- -
Revision of the VCM tank car loading procedure to eliminate venting of tank cars to the flare.
At the May 9 meeting we also pointed out five other equivalency requests were pending with EPA.
The alternate plan was submitted to EPA on May 19, 1978, Concerning the equivalency requests, EPA has approved one pending equivalency request and has denied the others. As a result of these denials, some additional expenditures will be required to achieve compliance. Finally, EPA is taking a very hard line on enforcement of the regulations with regard to emergency venting of VCM. Some further expenditures to reduce the frequency of emergency vents are required.
As stated earlier, the final date to complete facilities to comply with the regulations is October 21, 1978. The items needed to achieve compliance that have not been funded are listed below:
HC-9
Collection system, burner and analyzers to permit burning of vent gases in cracking furnaces and monitoring of stack emission
PVC-14
Revise controls 'for monomer recovery system
PVC-15
Oxygen analyzer
PVC-16 PVC-17
Barometric condenser revision Incinerator spare parts
PVC-18
Head space analyzer
PVC-19
Autoclave purge controls
PVC-20
Broken batch stripping facilities
FVC-21 PVC-22
Vacuum system revisions Emergency vent prevention
This request provides hinds for PVC-14, PVC-15, and PVC-18 which have been estimated to cost $155,000. It also provides $95,000 to be used to continue en gineering, order long delivery equipment, and start construction of the other parts of the project. The Part 6 request will be made after engineering estimates have been made to determine the costs of the remaining items.
EC P7B5
-3-
The forecast for total project expenditure is now $2.2MM. This compares favorably with the forecast first made in January, 1977 which gave a range of project costs from $2.5 to $4. OMM.
In our Part 4 request, we indicated that an incinerator-scrubber costing in excess of $1MM might have to be installed to comply with emission regulations and we planned to submit a request for funds for the incinerator on this project. We have postponed definitive design of the incinerator as we believe the present programs provide facilities needed to comply with existing regulations. However, an incinerator-scrubber will likely be required if new regulations limiting HC1 discharges are promulgated.
WFA:jm
Wallace F. Armstrong
FC 7786