Document J3XnwDeV162y6ejd0yEDjw81a

CYANAMID To: B. Coopersmith Location: Wayne From: H. Gaffney Location: Chicago Plant Extension: Subject: MONTHLY REPOST Reference: Date: Copy to: March 30, 2984 R. F. Anderson - NA F. Daly - MG J. S. Druzbacky - BW R. L. Johnson MG F. F. Loffelman - NA S . M. Lustig - NA c. G. Neumann - NA HIGHLIGHTS Lead price increases to 26C. I. SAFETY & HEALTH A. The plant has operated 4489 days (thru 3/29) without a disabling injury. B. There were no recordable injuries during this period. Y.T.D. J.E.A. is 0.0 C The latest blood lead level for 24 employees (all but office personnel) are: 6 MOS. MARCH LAST AVERAGE 50 ug Pb/100 grams blood or above 23 40 - 49 14 13 below 40 87 2 13 9 % below 50 92 87 92 Average 40 40 39 Vi sev d- = " CYWI 1-000190 2 II. PRODUCTION & SHIPMENTS Actual March % of budgeted rate Stabilizers Litharge Plant total Shipment k pounds 100 40 81 Stabilizers Litharge 625 24 Est. April Est May 99 149 - 115 116 124 119 505 20 590 20 III. INVENTORY End of Feb. k$ DOS End of March End of April End of May k$ DOS k$ DOS k$ DOS Finished Goods Support Goods 276 232 29 258 25 153 34 265 20 250 29 250 27 175 30 21 Plant Totals 508 54 411 54 515 56 425 51 IV. TECHNICAL A. PPG In an effort to determine the effect of various process parameters on oil absorption, all log sheet and test data on Lead Carbonate batches produced since August 1983 have been gathered and entered into the computer. We are still analyz ing these data, bat have found no significant correlations so far. PPG has offered to assist us in developing a viscosity measurement method for controlling the end point of the carbonation. We will be sending samples of slurry to their Springdale, Pa research center. Shipments to PPG this year have been: Jan. Feb, March - 77,500# 20,000# 52,000# CYW! 1-000191 3 XV. TECHNICAL (continued) B. TENNECO Volume resistivity testing was repeated on Cyastab 523- o versus Tribase XL - oiled, using the testing procedures spec ified by Tenneco (75 mil plaques, 50C) . We still find the complaint lots of 523- 0 to be equivalent to Tribase XL- oiled. The difference seen by Tenneco must be peculiar to their form ulation. Tenneco is now supplying formulation data for their com pound so we can duplicate their test procedure. C. EXTRUDATES A 100 lb. s-imple of Cyastab XW (Sulfo - Phthalate Extrudate) was made for Cerock. We have also shipped them 5000 lbs. each of Cyastab SW, TW, and CW. All of the above were 4 mm strands. Recently we witnessed a trial of another piece of equipment for producing 1 mm extrudate at Bepex, Santa Rosa, Ca. This is the equipment recommended to Howard Luke by Rohm GMBH. The trial was quite encouraging, although considerate fur ther work will be required to come up with a completely satis factory system. D. NLS Raw materials have been ordered and operating instructions written for a trial run of Normal Lead Stearate in the plant Cowles reactor. However, we have been advised as of yesterday to hold on any further work in this area. E. AUTOMATIC SAMPLING OF FINISHED GOODS Technical details of an automatic sampling system for stab ilizers are being worked out prior to submission of a job order. F. ETHYL There is some indication that the Izod impact tests run by Ethyl on samples submitted by Cyanamid were in error and they may restudy our material. Previously they had rtccepted our waxed Sulfate extrudate but then rejected the ground extrudate submitted for retrial. V000192 4 V. GENERPi A. The Metre pclitan Sanitary District of Greater Chicago (MSDG) continued to sample plants effluent. We were sampled on these dates: 2/2. 2/23, 2/29, 3/9, 3/12, 3/15/ Note that the plants effluent consisting of non- con tacting cooling water is only 25 gpm. B. PERSONNEL Salary 12 (included 5 non - exempt working supervisors) Hourly 35 C. The writer made 3 business trips this month Florida - p p d meeting California - Bepex Extrusion trial Mississippi - North American Plastics to review particle size conplaint. D. The lead price rose from 24C to 26C during the month due primarily to the rise in LME prices. Asarco is in the middle of a 2 month shut down of their Glover smelter. There was a wildcat strike at an Australian Lead/ Zinc complex. Doubt that St. Joe will sign their labor contract on 3/31. H. C. Gaffney CYWI 1-000193