Document J3Na2kakXkejJa3mDDVXqLmQe
DATE: SUBJECT: FROM: THRU: TO:
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGIONS
77 WEST JACKSON BOULEVARD CHICAGO, ILLINOIS 60604
JUL 1 7 2.119
CLEAN AIR ACT INSPECTION REPORT Northern Natural Gas, LNG Plant, Wrenshall, Minnesota
Luke Hullinger, Environmental Engineer AECAB (Ml/WI)
Sarah Marshall, Section Chief AECAB (MI/WI)
File
BASIC INFORMATION
Facility Name: Northern Natural Gas, LNG Plant
Facility Location: 2301 Co Rd. 1, Wrenshall, Minnesota
Date of Inspection: 6/4/2019
EPA Inspector(s): 1. Luke Hullinger, Environmental Engineer 2. Marie St. Peter, Environmental Engineer 3. Constantinos Loukeris, Environmental Engineer
Other Attendees 1. Robert Hullinger, Team Leader, Northern Natural Gas 2. Dwyre Johnson, Sr. O&M Technician, Northern Natural Gas 3. Cody Ketchum, Operations Manager, Northern Natural Gas 4. Kelly Henry, Division Environmental Specialist, Northern Natural Gas
Contact Email Address: Ke11y.Henry@nngco.com
Purpose of Inspection: Clean Air Act Inspection
Facility Type: Liquid Natural Gas Compressor Station
Regulations Central to Inspection: NESHAP Subpart ZZZZ
Arrival Time: 10:15 AM Departure Time: 12:15 PM
Inspection Type:
r::-71
TT
.
. __'] 0
a.
k'.:.:J
UllllililUilll\,;~U Hl:::._lJCL;llUll
D Announced Inspection
OPENING CONFERENCE
1:81 Credentials Presented 1:81 CBI warning to facility provided
The following information was obtained verbally from Robert Hullinger, Dwyre Johnson, Cody Ketchum, and Kelley Henry unless otherwise noted.
Process Description: Northern Natural Gas Company, LNG Plant is a compressor station in Wrenshall, Minnesota. The plant receives natural gas from two pipelines. The mainline comes in at 1000 lbs of pressure and the branch line come in at 700 lbs of pressure. The natural gas is purified in a molecular sieve dehydrator and then chilled to -260F. Next, the natural gas is stored in a storage tank pressure vessel and never exceeds ] lb of pressure. The natural gas is stored until needed and then sent back into the pipeline at 900-1100 lbs of pressure.
Staff Interview: On site there are two electrically driven 250 hp compressors for refrigerants, two electrically driven 600 hp compressors for refrigerants, and two 4000 hp for natural gas driven by natural gas. The tall flare controls the liquification process during the cool down, and the small flare controls waste gasses.
TOUR INFORMATION
EPA toured the facility: Yes
Data Collected and Observations:
Photos and/or Videos: were taken during the inspection. Two FLIR videos were taken at the facility showing leaks from the 250 hp compressor C501-A and the 600 hp compressor C-401-B.
Field Measurements: were not taken during this inspection.
CLOSING CONFERENCE
Requested documents: 2018 emissions report
Page 2 of 4
Concerns: EPA noted the two leaking pumps and suggested the facility address them with proper maintenance.
SIGNATURES
]/I 7/14
1;41
Page3 of4
Facility Name: Northern Natural Gas, LNG Plant Facility Location: 2301 Co Rd. 1, Wrenshall, Minnesota Date of Inspection: 6/4/2019
APPENDICES AND ATTACHMENTS
I.
Appendix A - Video log
Page 4 of 4
Facility Name: Northern Natural Gas, LNG Plant Facility Location: 2301 Co Rd. 1, Wrenshall, Minnesota Date of Inspection: 6/4/2019
APPENDIX A: DIGITAL IMAGE LOG
1. Inspector Name: Luke Hullinger
3. Company/Facility Name: Northern Natural Gas, LNG Plant
5. Number of Images:
2
2. Date(s) of Inspection:
6/4/2019
4. Street Address, City, State:
2301 Co Rd. 1, Wrenshall, Minnesota
6. Archival Record Location:
C:\Users\Lhulling\OneDrive - Environmental Protection Agency (EPA)\Northem Natural Gas\OneDrive 2 7-16-2019
Image Number 1 2
File Name MOY 2467.mp4 MOY 2468.mp4
Description of Image 250 HP Compressor leak on refrigerant seal 600 HP Compressor leak on refrigerant seal
Appendices Page 1 of 1