Brazil Incinerator
The review of the design conditions for the San Jose, Brazil S-160 incin erator shows that the unit is not adequate for PCB disposal. Design temp erature is '\'980C vs. the required 1600C (100C) at the design 1.5 second residence time.
EPA Enforcement Activities
The largest penalty ever sought by EPA for alleged PCB rule violations
was served on General Motors Company at its Central Foundry Division in
Massena, New York. A penalty of $507k is asked for 21 counts of PCB
rule violations.
.