Document J32akgbe2r245KLVZV2B8xJn6
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 10
1200 Sixth Avenue, Suite 155 Seattle, WA 98101
ENFORCEMENT & COMPLIANCE ASSURANCE
DIVISION
Clean Air Act - Section 112(r) Risk Management Program and EPCRA 312 - Tier II Facility Inspection Report
FACILITY INFORMATION:
Name:
CHS Inc. - Walla Walla
Physical Address: 111 9th Street, Walla Walla WA 99362
Phone Number:
5093864532
Latitude/Longitude: 46.064683/ -118.350638
RMP Facility ID# 1000 0005 8616
FRS ID#:
110070725918
EJ Concerns:
Yes (96%)
CONTACT INFORMATION (RMP Implementation):
Name:
Dan Andersen, EHS Director
Phone Number:
(509) 525-6690
E-mail:
co.compliance@chsinc.com
EMERGENCY CONTACT INFORMATION:
Name:
Richard Beckman
Phone (24-hr):
509-629-1552
E-mail:
richard.beckman@chsinc.com
Website:
https://www.chsinc.com/
TRIP DETAILS: Inspection Date: Inspection Time: Inspectors:
May 18, 2023 09:00 through 12:00 Terry Garcia, US EPA Region 10 SEE Grantee, Lead RMP Inspector Peter Phillips, US EPA Region 10 SEE Grantee, RMP Inspector Edward Johannes, US EPA Region 10 SEE Grantee, RMP Inspector
DATE AND PROGRAM LEVELS OF SUBMITTED RMP:
Initial Submission Date: June 16, 2009
Date of Latest Update:
August 2, 2021
Page 1 of 7
Process (Program 1, 2, 3) as reported in RMP:
Process ID
Description
Process Chemical ID
NAICS Code
1000118050 1000118050
NH3 reacting to Aqua Amm. NH3 reacting to Aqua Amm.
1000147633 1000147634
325314
325314
Program Level
3
3
Chemical Name CAS Number
Ammonia (conc 20% or greater)
Ammonia, Anhydrous (7664-41-7)
Quantity (lbs)
137,782
678,000
PURPOSE: The purpose of this inspection was to determine whether this facility is in compliance with Section 112(r) of the Clean Air Act and Title 40 Code of Federal Regulations (CFR) Part 68, Chemical Accident Prevention Provisions.
The facility has been previously inspected in the past 5 years: No
Yes
If Yes, Date of Last Inspection:
The facility is High Risk: Joint EPCRA inspection:
No
Yes
No
Yes
CAA TITLE V AIR PERMIT: Does the facility have a CAA Title V Permit? If Yes, Permit Number
No
Yes
RELEASE/ACCIDENT HISTORY: Did the facility have a reportable release in the past 5 years? If Yes, Date and Description of the Release:
No
Yes
EPCRA TIER II REPORTING:
Did the facility submit the 2022 Tier II report to the SERC?
If Yes, Date the Tier II was submitted:
2/27/2023
If No, calendar year of the most recent Tier II:
No
Yes
Did the facility submit a Tier II to the LEPC and local fire department? No
Yes
If Yes, Date the Tier II was submitted: 2/27/2023. Facility provided email verification from City of Walla
Walla Fire Chief Ed Knowles that the Tier II was received.
INSPECTION ENTRY: Terry Garcia led the inspection entry. The inspection team met with CHS, Inc., facility representatives: Salvador Esquivel, Richard Beckman, Harold Loomis, Nick Broemeling, and Mary Blel, Corporate CHS Environmental Manager at the CHS Inc. - Walla Walla facility in Walla Walla, WA. The team arrived at the facility at 09:00 and was joined by the following facility personnel:
Name Mary Blel Salvador Esquivel Richard Beckman Nick Broemeling Harold Loomis
Title CHS Environmental Manager, Corporate Legal and Compliance Operations Supervisor Plant Manager Safety Leader Agronomy Operations Manager
Page 2 of 7
Was a state/county/or local emergency representative present?
No
Yes
If Yes, Name and Title of Representative: Nick Broemeling is facility Safety Leader and LEPC/Fire
representative for the county areas.
The facility is a first responder:
If No, Responding Agency
No
Yes
The inspection team was escorted to a conference room located in the facility's modular office trailer/complex a few yards away from the office building. Introductions were made by Terry Garcia, who provided a summary of the risk management program (RMP) and explained the purpose of the visit. Each team member presented his/her credentials.
EPA then requested an explanation of the facility's operations and any additional safety measures that should be taken during the site tour. Richard Beckman and Salvador Esquivel gave a brief description of the facility, operations, and [PPE] personal protective equipment required for the tour. High visibility vests, safety shoes and safety eyewear were worn by EPA Inspectors worn around the covered process areas.
Prior to the inspection, EPA sent a certified notice of inspection letter to the facility informing them of the CAA Section 112(r)(6)(L) requirement that facility employees and employee representatives (such as a union representative) have the right to participate in the RMP inspection, and that a copy of the letter must be provided to the employee representative(s) and the letter posted in a manner accessible to employees in the facility.
The facility is unionized:
If Yes, Name of Union
No
Yes
An employee representative present during the facility visit:
If Yes, Name/Title
No
Yes
GENERAL INFORMATION: The CHS, Inc. Walla Walla Retail facility is regulated under the RMP as Program Level 3 process for anhydrous ammonia and aqua ammonia storage (concentration 20%). The facility has been in operation since the 1960s. The primary purpose of the facility is the storage and distribution of anhydrous ammonia and aqua ammonia to farmers as an agricultural fertilizer. The facility reported in their August 2, 2021, RMP an anhydrous ammonia inventory of 678,000 pounds. (exceeds the threshold quantity of 10,000 pounds) and aqua ammonia (concentration 20%) of 137,782 pounds.
The facility has a 18,000 gallon pressure vessel and a 30,000 gallon pressure vessel onsite to store anhydrous ammonia. The 18,000 gallon storage pressure vessel is used to deliver anhydrous ammonia to the farmers. The 30,000 gallon storage pressure vessel supplies anhydrous ammonia to the stationary converter to convert anhydrous ammonia with water to manufacture the aqua ammonia (concentration 20%). Three 30,000 gallon vertical above ground storage tanks located in secondary containment store the aqua ammonia (concentration 20%) onsite. Delivery trucks each with two 1,000 gallon nurse tanks operated by CHS Inc. employees deliver anhydrous ammonia to farmers.
The facility produces aqua ammonia (concentration 20%) in the spring and fall. During the spring months the facility is producing aqua ammonia (concentration 20%) two times per week, for approximately six weeks, 4 hours per day. In the fall, using the same frequency, the facility produces aqua ammonia (concentration 20%) up to 10 weeks. The total amount of aqua ammonia (concentration
Page 3 of 7
20%) produced in calendar year 2022 was 85,600 gallons (or 6.5 million pounds. The facility main ammonia supplier is Agrium (now called Nutrien), a Canadian fertilizer company based in Saskatoon, Saskatchewan. The facility also receives small deliveries of ammonia from CF Industries in Kennewick WA.
The facility is staffed Monday - Friday 6 a.m. to 9 p.m. There are 18 full-time employees on site including eleven (11) operators. Saturdays are seasonal hours depending on farmers customer needs. The facility is not secured by a perimeter fence and is adjacent to a gas station, also owned and maintained by CHS Inc.
The facility is not a first responder and defers to the Walla Walla local Fire department in the event of an anhydrous ammonia release.
ON-SITE OBSERVATIONS: The facility tour was conducted from approximately 09:45 to 12:30. The inspection team was escorted by Plant Manager, Richard Beckman, Salvador Esquivel, Harold Loomis, Nick Broemeling, and corporate representative, Mary Blel.
EPA inspection team observed the anhydrous ammonia storage tanks (pressure vessels) on the south side of the lot, anhydrous ammonia loading station to storage tanks, aqua ammonia storage tanks, aqua ammonia stationary converter, aqua ammonia unloading station, pressure relief valves, piping, hoses, the emergency shut off valves (internal emergency safety valves installed in 2017). An underground pipe was changed in 2017 to above-ground piping protected by concrete channel securing the pipe that leads from pressure vessel to aqua ammonia converter (photo 15). Three (3) emergency shower/eyewash stations were observed throughout the facility at various process areas. A windsock was observed at the Tank Farm and Aqua Ammonia area (photo 19).
An overview of the EPCRA chemicals stored at the site were observed and photographed (photo 1 and 19). The facility's 2022 Tier II report was also reviewed.
Anhydrous Ammonia Storage Vessels and Loading/Unloading Stations: The 18,000 gallon pressure vessel and 30,000 gallon pressure vessel are mounted on concrete saddles (approximately 5 ft. high) off the ground and protected all around with concrete posts and metal rail guards for safety(photos 2, 3 and 5). The anhydrous ammonia product label and NFPA 704 Hazard Identifier Hazard label placards were visible on the pressure vessels (photo 2 and 5). ASME nameplates and pressure gauges were visible on pressure vessels (photo 27). The main shutoff valves for pressure vessels were locked. The 18,000 gallon pressure vessel has two dual pressure relief valves (PRV) with two-way manifold on top of the pressure vessel (photo 5).
The vapor recovery system was built around 1996 and is designed to pull ammonia vapors from the DOT Tankers being loaded. The vapor line is piped to the scrubber tank that supplies water to the converter. The ammonia vapors are absorbed into the water that is ultimately used in the conversion of anhydrous ammonia to aqueous ammonia. Delivery trucks are filled with ammonia at the two load-out stations located on the north and south side of the 18,000 gallon pressure vessel. Nitrogen cylinder used for emergency shut off was observed (photo 13). The ammonia load-in station is located on the northeast end of the 18,000 gallon pressure vessel and ammonia load-in operating procedures (hard copy) were observed (photo 4). The delivery truck driver supplies the transfer hoses to connect to the bulkhead that connects at the load-in station. Piping is painted orange for liquid and yellow for vapor on the 18,000 gallon pressure vessel (photo 5). Valves are locked at the bulkhead connections for the transfer hoses of the 18,000 gallon pressure vessel (photo 5). Ammonia transfer hose inside of locked
Page 4 of 7
hose cabinet with expiration date of 2027 (photo 6). The liquid ammonia pump is located at the northeast end of the 18,000 gallon pressure vessel (photo 8). An emergency shutoff pull cable and ammonia pump start/stop button are located at the northeast end of the 18,000 gallon pressure vessel (photo 10). Grounding cable is located at the southwest end of the 18,000 gallon pressure vessel was noted. Emergency shutoff valves (ESV) installed in 2017 is a redundant safety feature along with the excess flow valves on equipment. The ESV and snappy joes were observed on the 30,000 gallon pressure vessel (photo 9 and 10). Emergency shutoff switches were observed throughout the site (Photo 11 shows 1 of 3). Operators and drivers carry remote ESV FOB to close emergency shutoff valves during an emergency. Operator Lead carries a remote ESV FOB to demonstrate during the tour (photo 12). Hand-held ammonia detector displayed ammonia PPM levels of 2 ppm at the time of the tour (photo 14).
The 30,000 gallon pressure vessel has two dual pressure relief valves (PRV) with a two-way manifold on top (photo 3 shows 30K vessel). Pneumatic emergency shut off valves are activated by emergency shut down button(s) around the storage facility. They are equipped with pneumatic cylinders and when pressurized, the pneumatic cylinder piston rod disengages from a striker plate, allowing the ESV to be manually opened and the striker plate to act as a latch and hold the valve open. Release of the control system pressure for any reason closes the ESV for fail-safe operation.
Three separate emergency shower/eyewash stations and vehicle barriers are located throughout the site (photo 26). Vehicular Barriers are located at each pressure vessel to prevent damage by trucks during loading/unloading of ammonia. Wheel chocks were observed at each pressure vessel. Personal protection equipment (PPE) storage boxes (black) are located at each end of the 30,000 gallon pressure vessel load stations for operators (photo 25).
Anhydrous ammonia flows from the 30,000 gallon pressure vessel through an above-ground pipe, that was installed in 2017 to the aqua ammonia converter to produce ammonia (20% concentration) in water solution (photo 15).
The standard operating procedures (SOP) for ammonia load-in for anhydrous ammonia and unloading at aqua ammonia converter were observed (photo 28). The SOP placard (photo 4) at ammonia load-in taped to concrete saddle was weathered and unreadable. The SOPs are also available to operators and drivers at main office.
Aqua Ammonia Converter and Storage Tank Area: A concrete spill containment area surrounds the entire tank farm including the three aqua ammonia storage tanks and aqua ammonia converter located north of the ammonia pressure vessels (photo 1). The aqua ammonia converter is manufactured by Barnard & Leas Manufacturing Co., Inc., based in Cedar Rapids, Iowa. Labeling on the aqua ammonia converter control panel is visible (photo 16). Anhydrous ammonia flows from the underground pipe (orange) to the aqua ammonia converter and mixes with water in a manifold to produce ammonia (20% concentration) in water solution. The aqua ammonia (20% concentration) at 140 0F flows through the cooling tower to remove heat before being pumped to the aqua ammonia storage tanks at 85 0F. Piping (white) interconnects all three aqua ammonia storage tanks. Above ground piping is protected by metal rail guard and is set within a metal frame (photo 15). In March of 2017, CHS facility removed the underground piping that goes from one of the storage tanks to the aqua ammonia converter. A below-grade concrete trench was constructed, and new piping was placed in this trench by CHS. The trench has metal covers that can be removed for
Page 5 of 7
visual inspection of the piping. The trench system provides a higher level of safety for the covered process as it minimizes corrosion concerns related to buried piping provide improved pipe Inspection access.
Valves for piping (white) are locked. The piping (white) is labeled to identify the aqua ammonia and flow direction. The Aqua Ammonia product label, NFPA 704 Hazard Identifier, and tank storage capacity (30,295 gal.) placards were visible on the storage tanks (photo 20 and 21).
Emergency shutdown for the aqua ammonia converter can be done by the operator in the following ways: (1) Using the manual control valves and pump controls, (2) Main electrical shut-down panel in the electrical room and (3) ESV FOB (worn by operators when around the regulated process areas) to remotely shutdown system for any upset or in an emergency. Transfer hoses are changed per manufacturers recommendations, or every 10 years or sooner if warranted. Daily safety rounds are made throughout the site and documented. Transfer hoses are visually checked with each use at load-in and load-out and current hoses were observed with an expiration date stamp of 2027 (photo 6). Piping (black) interconnects all storage tanks to supply aqua ammonia at the load-out station. Valves are locked connecting the storage tanks to piping.
Aqua Ammonia Loading Station and Converter: The aqua ammonia load-out station is located on the south side of the tank farm (photo 23). An above ground ammonia pipe from pressure vessel to aqua ammonia converter that was changed from underground to above ground installed in 2017 was observed (photo 15). Vapor recovery system for aqua ammonia offloading station was observed (photo 24). The hydrometer equipment meters test the nitrogen concentration while converting aqua ammonia. The bypass valve on the scrubber tank is a two inch water valve used to bypass from the pump supplying water to the converter.
The start/stop control buttons for the aqua ammonia pump in the tank farm were observed (photo 21 24). Gloves and goggles for the driver/operators are stored in a box at the load-out station (photo 25). Emergency shower/eyewash station and vehicular barrier observed at 30,000 gallon tank (Photo 26).
Photographs were taken of the anhydrous ammonia and aqua ammonia (concentration 20%) processes. The photographs that were taken at the facility are included in Attachment A to this report. Block flow diagram of the systems regulated process below:
After touring the RMP-covered process areas at the CHS Walla Walla facility, the inspection team returned to the modular office trailer area to review the RMP and EPCRA documentation. Upon completion of the document review, EPA provided a debriefing to all facility personnel present at the opening meeting.
INFORMATION COLLECTED FROM FACILITY: 1. CHS Inc., Walla Walla Site Plan 2. CHS Inc., Walla Walla Block Flow Diagram [Stationary Storage out to Nurse Tanks] 3. CHS Inc., Walla Walla Block Flow Diagram [Stationary Storage out to Aqua Converter/Aqua Tanks] 4. Tier II email verification from Walla Walla Fire Chief Mr. Fred (John) Knowles to Facility.
Page 6 of 7
AREAS OF CONCERNS ADDRESSED IN CLOSING CONFERENCE: 1. Contractors: CHS Inc. was unable to provide documentation to show that when selecting contractors, that they obtain and evaluate information regarding the contract owner or operator's safety performance and programs. [68.87(b)(1)]. The CHS Inc. contractors are Hayes Electric and Gary Moser Tank inspector. 2. Contractors: CHS Inc. did not periodically evaluate the performance of the contract owner or operator in fulfilling their obligations. [68.87(b)(5)]. The CHS Inc. contractors are Hayes Electric and Gary Moser Tank inspector.
DOCUMENTS REQUESTED NOT INCLUDED IN REPORT: The following documents were requested during the inspection but are not included in this report. These documents will still be reviewed to determine compliance with Section 112(r) of the Clean Air Act.
1. Documentation for fire dept. exercises and walk-throughs to verify coordination. INSPECTION REPORT CERTIFICATION: This is to certify that I, Terry Garcia, was the lead inspector at this facility and that I have verified the accuracy of the observations in this inspection report:
__________________________________________________________ Inspector Signature
__________________________________________________________ RMP Coordinator/Approval
__________________________________________________________ EPCRA Coordinator/Approval
__________________________________________________________ Land Enforcement Section Chief/Approval
Page 7 of 7
Attachment A - Photo Log Site Name: CHS Inc. - Walla Walla City, State: Walla Walla, Washington Photographer: Peter Phillips
Photo
Photo 1
Photo 2
Photo 3
Photo 4
Photo 5
Photo 6 Photo 7 Photo 8 Photo 9 Photo 10 Photo 11 Photo 12 Photo 13 Photo 14 Photo 15 Photo 16 Photo 17 Photo 18 Photo 19 Photo 20 Photo 21 Photo 22 Photo 23 Photo 24 Photo 25 Photo 26 Photo 27 Photo 28
Date
5/18/2023
5/18/2023
5/18/2023
5/18/2023
5/18/2023
5/18/2023 5/18/2023 5/18/2023 5/18/2023 5/18/2023 5/18/2023 5/18/2023 5/18/2023 5/18/2023 5/18/2023 5/18/2023 5/18/2023 5/18/2023 5/18/2023 5/18/2023 5/18/2023 5/18/2023 5/18/2023 5/18/2023 5/18/2023 5/18/2023 5/18/2023 5/18/2023
Time 9:48 AM 9:50 AM 9:51 AM 9:51 AM 9:53 AM
Description Tank farm overview including, three aqua ammonia tanks (white) and EPCRA chemicals (blue containers storing other liquid fertilizers) 30,000 gallon NH3 pressure vessel with signage 30,000 gallon NH3 pressure vessel with 5' concrete saddles off ground, metal railings and steel barriers, hazard class placards, dual PRVs Ammonia load-in operating procedures [noted as weathered] 18,000 gallon NH3 pressure vessel with barriers, locked transfer hose cabinet, dual PRVs and piping condition
9:54 AM 9:54 AM 9:54 AM 9:56 AM 9:56 AM 9:59 AM 10:00 AM 10:02 AM 10:02 AM 10:04 AM 10:05 AM 10:05 AM 10:06 AM 10:07 AM 10:07 AM 10:08 AM 10:08 AM 10:10 AM 10:11 AM 10:13 AM 10:13 AM 10:14 AM
11:20 AM
Ammonia transfer hose inside of locked hose cabinet with expiration date of 2027 Piping condition under 30,000 gallon pressure vessel Piping and pump under 18,000 gallon pressure vessel Emergency shutoff valves on 30,000 pressure vessel. Emergency shutoff valve on 18,000 pressure vessel Emergency shutoff switch (1 of 3) Operator remote FOB to close emergency shutoff valves Nitrogen cylinder used for emergency shutoff system Hand-held NH3 detector indicating 2 ppm Above ground NH3 pipe from pressure vessel to aqua ammonia converter Aqua ammonia converter Aqua ammonia converter cooling towers Recirculating water pumps for aqua ammonia converter Tanks shown here are storing liquid fertilizers; Windsock Aqua ammonia storage tank Aqua ammonia storage tank Aqua ammonia converter interior Aqua ammonia load out station Vapor recovery system for aqua ammonia offloading station PPE for vehicle operators Emergency shower and vehicular barrier of 30,000 gallon pressure vessel Tank volume gauge on 30,000 gallon pressure vessel and ASME nameplate
Posted SOPs for aqua ammonia converting