Document J32Kr3EOvbkk5Bz6YvYKyMMEX
CSTAUSHCn
E. 1. d u Po n t d e Ne mo u r s 51 Co mp a n y . ItMBORPORATKD
Wil min g t o n , De l a w a r e 19898
CHEMICALS AND PIGMENTS DEPARTMENT JACKSON LABORATORY
CC: $. W. Severance, B-6237 J* S. Thackrah, B-6237 P, A. Hopkins, B-17249-4 R. S. Weis, B-17202 Ft B. Bredimus, C&P, Newport J. M. Loether, C&P, Newark
April 7, 1982
J. P. Glas, B-17206 G. C. Tunis, B-6237 B. F. Kennedy, B-17249-2
COLORED PIGMENTS R&D;
PROCESS 1MPROVEMENT/DOCUHENTATION
ACCOMPLISHMENT REVIEW
Attached are charts used at the review held on March 30.
CH-1003 REV. fl-M
E. I. d u Po n t d e Ne mo u r s Si Co mp a n y WILMINGTON, DELAWARE 19898
CHEMICALS AND PIGMENTS DEPARTMENT JACKSON UBORATORV
CC: S. W. Severance, B-6237 J, 5. Thackrah, B-6237 P. A. Hopkins, B-17249~4 R. S. Weis, B-17202 F. B. Bredimus, C&P, Newport J. M. Loether, C&P, Newark
April 7, 1982
J. P. Glas, B--17206 G, C* Tunis, B-6237 B. F. Kennedy, B-17249-2
COLORED PIGMENTS R&D;
PROCESS IMPROVEMENT/DOCUMENTATION
a c c o mp l is h me n t r e v ie w
Attached are charts used at the review held on March 30,
PAW:jla Attachment
N 25851
DUP050145443
A-
NEWARK
pr o g r am r eview
0. GRAY 3/30/82
DUP050145444
N 25851.01
REVIEW ITEMS BACKGROUND INFORMATION d o c u me n t a t io n FACILITIES IMPROVEMENT
DUP050145445
PRODUCTION TRAIN
BATCH
MAKING
SYNTHESIS/TREATMENT
ISOLATE/WASH
DRY
FINISHING
GRIND
SEMI FINISHED
pac k OUT ---------* INVENTORY
EVALUATE
FORMULATE MIX**--
BLEND PACK OUT
EVALUATE------- --
CONTINUOUS MAKING FINISHING
f
EVALUATE
FINISHED PRODUCT (AFS)
DUP050145446
PROCESS DOCUMENTATION
PROBLEM MASTER TECHNICAL FILE INADEQUATE t BATCH CARDS ARE CURRENT - NEED UPGRADING
* EXPAND OPERATING INSTRUCTIONS - REQUIRES SKILLED OPERATOR - DEFINE CRITICAL PROCESS STEPS
PLANT ASSISTANCE AREA CHEMIST/ENGINEER
APPROACH t DOCUMENT CURRENT TECHNOLOGY
PRINCIPLE; REACTIONS; END USE BASIS - PROCESS NOTES; PLANT TRIALS; BATCH CARDS EQUIPMENT; MATERIAL OF CONSTRUCTION CHEMICAL HAZARDS BILL OF MATERIALS; SPECS; WASTES; YIELD PROCESS STEPS; OPERATING PARAMETERS/LIMITS DRAFT - TECHNICAL AND MANUFACTURING REVIEW # FINAL - OPERABLE/REPRODUCIBLE TO PROVIDE AFS EDIT BATCH CARD
DUP05014544
DOCUMENTATION SCHEDULE/STATUS
STATUS
'
SCHEDULE ACTUAL
IIQ82 DRAFTr^rlNAL
29 7 35 10
FINAL
II III IV TOTAL
29 30 37 103
TECHNOLOGY IMPROVEMENT IDENTIFIED
CYCLE TIME
SOLUTION MAKE UP WASH TIME DRYING TIME CRUDE ACCEPTANCE TEST
RAW MATERIAL SAVINGS
QUALIFY NEW SOURCES
* ELIMINATE CONTAMINATION SOURCES
DUP050145448
AZO PIGMENTS
PRODUCTS DAIAMAR YELLOW
1982
FIt M LBS
613
' WATCHUNG/BON RED
1248
JEST = 87% OF TOTAL AZO'S
PROCESS
AMINE---*DIAZO
COUPLER t DALAMAR
COUPLER . DYE SALT
BA, CA, SR ^ WATCHUNG
MN BON RED
CLARIFICATION
CLARIFICATION
AMINE
CARBON
OR w .-.ii.i..-,. iii.-i.. .
DEVICE i ..I. ii'.i.
DIAZO
FILTER AID
PROGRAM
QUALIFY NEW SOURCE RAW MATERIALS
ELIMINATE CARBON
DULLING IMPURITY
CYCLE TIME/LABOR
YIELD LOSS
DUP050145449
FACILITIES UPGRADING
GRINDING EQUIPMENT PROCESS CONTROL EQUIPMENT MATERIAL HANDLING AND PACK OUT
DUP050145450
FACILITIES UPGRADING
CONTINUOUS UNIT F/C
16MM LBS 1982
- 8 WEEK CYCLE
PROCESS STRIKE--# ISOLATE
mm 3 MILLS;
*> DRY--# Ig RINd I-- PACKQUT 2 - SALES GRADES: 1 - COMPONENT
PROGRAM
- REPLACE MILLS
MAINTENANCE
DUST SOURCE
UTILITY
- STATUS
BAUER MILL - $11OM, 108% NROI
CHARACTERIZATION TO DATE
5 OF 9 PRODUCTS TESTED
EXCELLENT RESULTS
COMPLETE TESTING BY 6/82
DUP050145451
SUMMARY DOCUMENTATION - ON SCHEDULE BENEFITS
CYCLE TIME REDUCTION RAW MATERIAL SAVINGS ELIMINATE PIT FALLS
TIME DELAYS CONTAMINATION FACILITIES UPGRADING CONTINUOUS UNIT * GRINDER FINISHING - PACKERS
DUP050145452
NEWPORT PRODUCTIVITY IMPROVEMENT PROGRAM I Q - 82 REVIEW
S. A. DOMBCHIK
3/30/82
DU P050145453
PROCESS IMPROVEMEMT/DOCUHENTATXOH
] Q COMMITMENT 5 aRT.li: ATED-^6 APPROVED - 5*
D IAN ILINODIHYDROTEREPHTHAUTE (QA) N-76A3 (RT-899) N-7531 - QAAF SUCCINYL SUCCINIC ESTER (QA) QU1NACRIDONEQUINONE (II Q) - ANTICIPATED*
EXCEPTION - 1 (TO APRIL)
N-7102 (RT-790)
I
PROCESS APPROVED THROUGH SR, SUPR. PRODUCTION
i
LAST CAMPAIGN YELLOW t INTENSE TINT
NEED TO ASSURE BLENDABILITYTO RT-790 ' WIDEN SPECIFICATIONS
II Q COMMITMENT - A (+ H-7102) DIHYDRO-QA (QA) - DRAFTED/UNDER REVIEW N-8510 - DRAFTED; PUNT WORK COMPLETE; LAB QUINACRIDONFGUI NONE - APPROVED* N-7609-UB WORK COMPLETE; BEING WRITTEN (N-8833, N-8730, LC CRUDE EARLY)
DUP050145454
GOAL: ALL COMPLETE BY YEAR END (117)
1 0 GOAL-77 (16/QUARTEB RATE) APPROVED-78 UNDER
REVIEW-13
TOTAL - 32
APPROVED - 21
UNDER REVIEW - 8
N-CODE SPECIFICATIONS FOR NEWARK
TWO LEVELS OF ACCEPTABILITY TEMPORARY' SPECIFICATIONS (IF UNCERTAINTY) TEST DEVELOPMENT NEW STANDARDS INSTRUMENTAL COLOR (N-7500, N-7102/A, N-S510)
DU P050145455
FACILITIES - IQ COMMITMENTS
WATER SOFTENER (SA) ELIMINATE 903 SCRUBBER
BASIC DATA COMMITMENT
1/82
2/82
.. .. ..STATUS
COMPLETE) TWO UNITS ORDEREI
COMPLETE; < $10M VS.> $50M
MCN - II Q
DOWTHERM SAVINGS - MIXING
- COALESCER
3/82 3/82
COMPLETE; MCN TBD >200% NROI ON $50M
COMPLETE) MCN TBD ^llEZ NROI ON 0M
DUP050145456
SUMMARY
' DELAWARE RECLAMATION PLANT (DRP) START UP FORECASTED FOR IV 0- 82 USING AIR DRIED SLUDGE FROM CURRENT LAGOON INVENTORIES. NEWPORT R&D WILL MONITOR SLUDGE TO ASSURE ACCEPTABLE CPC LEVELS (APRIL)
' BIRD TESTING INITIATED (250/500 PPD)j RESULTS IN JUNE
I Q 82 CPC LOSS 5A0 PPD - 83% OF IV Q 81 - LOW PRODUCTION
MAJOR LOSS POINT IDENTIFIED - CPC CRUDE MGF. AT EAST KEROSENE DECANTER - 50% OF TOTAL LOSS - FILTRATION OF LUWA DRYER CONDENSATE TO CONTAIN PIGMENT STARTED UP - RESULTS MIXED (RESOLVE IN APRIL).
$
OTHER LOSS REDUCTION PROGRAMS PROGRESSING ON/AHEAD OF SCHEDULE
DU P050145457
y \ L T ^ A T lOH O F LU W A COMTEK?
^
T O -fc 'DE'CAM T'?5X,
CPC WASTE STREAM CONTROL
ESTABLISH GATE LOSS SPECIFICATIONS (6/82) - BIRD TESTING INITIATED - B! WEEKLY DRP DIGESTER SAMPLING INITIATED - ESD COMPUTER MODEL FOR PEAK LOSS IMPACT (APRIL)
REDUCE CPC LOSSES TO ACCEPTABLE LEVEL (200-300 PPD RATE) - LOSS POINTS AND MAGNITUDE (1/82) ' COMPLETE (EAST DECANTER, MEMBRANE PRESS, POINT SOURCE) - EAST DECANTER (2/82) - WEST DECANTER (2/82) ' VISUAL ON ROTARY FILTER . STREAMS - BGD ROTARY FILTERS (6/82) BACKUP FILTER ON ORDER (DUE NOW) - CAKED MILLS (3/82) SCHEME DEVELOPED - TOTE MODIFIED STARTUP APRIL (NEED 2A3 TANK)
DUP050145459
r
CPC HASTE SfREAM CONTROL (CONTD.) - SEPARATED BATCHES (DEFINE 3/82)
BB PROCESS SUCCESSFULLY MODIFIED ' RECOVERY SCHEME DEVELOPED/MINI FLASH FABRICATED/START
UP APRIL ' RECYCLE FEASIBILITY IN APRIL
- PRESS ISOLATION (DEFINE 1/82) ' MONITOR PLATE & FRAME
RECOVERY SYSTEM-MEMBRANE (APRIL) - SPILL CONTAINMENT (DEFINE 3/82)
TANK OVERFLOW
a
LINE BREAKS PRESS BREAKOUTS - GRADE CHANGE FLUSHOUTS (6/82) - COMMUNICATION (NEW) ' PRODUCTION COMMITMENT/MANPOWER ' WEEKLY REVIEW
SHIFT MEETINGS - IMPLEMENT ACROSS SITE ill I 0/82
DUP050145460
11 Q FORECAST
PROCESS IMPROVEMENT/DOCUMENTAT ION - ON SCHEDULE
SPECIFICATIONS - ON SCHEDULE
FACILITIES - NOTHING FORECASTED
CPC WASTE STREAM CONTROL - DEFINE ALLOWED GATE LOSS - KEY TO SUCCESS FOR REMOVAL (EAST DECANTER) - MANAGE USE OF SLUDGE BY DRP
KEROSENE - ACTIVE (REPORT NEXT TIME)