Page 11 G. L. Cotter May 3, 1985
No. 119894 Front Output Shaft Request - Glasgow has requested that the mill cut radius at the end of the oil flat be changed from .090"-.125" to .050"-.050". This would use the same milling tool used on the 110B23 and 110805 input shaft oil flat. Stress calculations show that decreasing thB radius would increase stresses 21%. Because the Plant's objective is to commonize tooling. Engineering is recommending that the 110823 and 110B05 oil flat radius be upsized to the 119894 dimension.
NEW ON-HIGHWftY 5BK TANDEMS
A bearing selection study has begun for new tandem axle designs. Downsized gearing (15-5" spiral bevel and 14.5" hypoid) and extended bearing life (600,000 miles) are the relative design features. The concept study for the "R" head assembly has been completed, and is being reviewed.
16.511 x 7" PRIM BRAKES
Carlisle Lining Structural Integrity
Initiated testing of latest production shipments of WD39A lining to examine state of friction level and material structural integrity. Carlisle testing of revised D39A material formulation that had displayed drum metal "pick up" at high temperatures is continuing. No progress has yet been reported. Awaiting IHC Engineering's action plan on problem. IHC Is the only OEM stlLl using this lining as a standard.
Initiated test program tp evaluate Carlisle's R31 lining for similar problems. Field complaints possibly related to this lining are increasing in number (currently standard on Eaton trailer axles). First testing indicates friction level is higher than original levels. Lining structural integrity testing now under way.
Fleet Testing of Low Friction Nonasbestos Linings
The first "controlled hardware" tests comparing Abex 3030-67, Carlisle MME145A, and Abex 551C are currently running oh fifteen Freightlirier vehicles at Stoops Transport. Hardware procurement for Ruan, the next target fleet, has been stalled due to problems with obtaining IHC components to convert the subject vehicles from aii disc brakes. These vehicles are the only ones Ruan is willing to use for this test.
A joint IHC/Eaton trip to inspect fleet test vehicles at Viking Truck is being scheduled. These units were equipped with E145A and 3030-67 materials approximately the same time frame as the Schneider Transport vehicles that first displayed problems. This inspection anticipated by mid-May.