Document J2ZQQwb5rEOmag1Ldennvd92

800 K SUBJECT: ASBESTOS PAGE: 3 OF 3 LAST REVISED: 11/09/87 UNION CAR8I0E CORPORATION TEXAS CITY PLANT Plant Procedure SH-5.6 Attachment #1 NOTICE OF INTENTION TO OEMOLISH OR RENOVATE A STRUCTURE OR FACILITY CONTAINING ASBESTOS MATERIAL Description of the facility: ..yjpu. Estimate of approximate amount of friable asbestos materials present: (Area in sq. ft. or linear ft.) //Q &Q ^7^ ______________ Estimation technique used: dTzfL___________________________________ 3. Estimated age of asbestos, mmaatteerriiaall:: 4. Location of facility: hm.. p/Jj 75. Scheduled starting day: _______ V/ 7 Scheduled completion day: ,JA 3/ 70 Nature of planned demolition Sr reno/ation: Method to be used (negative pressure enclosure, glove bag, etc.): NOTE: This form must be completed and delivered to the EP Department (Bldg. #1) at least 30 days ahead of the scheduled starting day of the planned demolition or renovation, or as soon as possible following an emergency renovation operation. April 1985/Revised November 1987 #0184s UCTC 18119 Boo 6 SUBJECT: AS8EST0S PLAINTIFFS li exhibit Union Carbide-800B PAGE: 3 OF 3 LAST REVISED: 11/09/37 UNION CARBIDE CORPORATION TEXAS CITY PLANT Plant Procedure SH-5.6 Attachment #1 NOTICE OF INTENTION TO DEMOLISH OR RENOVATE A STRUCTURE OR FACILltY CONTAINING AS8EST0S MATERIAL 1 . Description of the facility: 2. Estimate of approximate amount of friable asbestos materials present: (Area in sq. ft. or linear ft.) /3- O Q yQ^f, __________________ Estimation technique used: "*7r\(CTMtL LSL13. Estimated age of asbestos material: ______ 4. Location of faci1ity: -a 5. Scneduled starting day: 7 /ffD Scheduled completion day: _? / , / f 1 O Nature of planned demoliticmor renovation: ^j, 5. .' / JLsn~ -- try ^ _______ ' Method to be used (negative pressure enclosure, glove bag, etc.): 7. lame of person that prepared the form: .ocation and telephone number: ^" XS'Q //? /fo)ate: ___________________ NOTE: This form must be completed and delivered to the EP Department (Bldg. #1) at least 30 days ahead of the scheduled starting day of the planned demolition or renovation, or as soon as possible following an emergency renovation operation. April 1985/Revised November 1987 #0184s UCTC 18120