Document J2RxYqwEE7aKXr9ZJOe3OddB
LCmilAHA IVISIAN A T AH DCS. LA.
February 4, 195*
N'f-TE
PF8 !2 '954 H. J. VOC f-HJU
Atmospheric Survey Drs. Choppin and west
Mr. J. P. Warner l'&in Office
V !'v
Dear I-Sr. Warner:
Drs. A. R. Choppin and P. W. West have been conducting analytical
studies of the atmosphere in the Refinery for the past ten months in accord ance with a one-year contract we liave with then. Under the provisions of the contract they were to nalte analyses for a number of different atmospheric
constituents twice nontlily at six different points in the Refinery, including Anchorage and Maryland. In addition certain other studies such as corrosion rates of various materials, total dust fall and analytical development on some special analyses were to be made. The contract provided for an option to renew at a total cost of $7,250 for the second year. The cost of the first year was $11,800, which included the cost of the mobile laboratory end other
initial expenses.
Drs. Choppin and West met with several members of the Technical
Division and Dr. J. S. Miller on January 15 to review the results of their work to date and to make recommendations regarding future work. A surmary report is attached for your information.
Their findings may be summarized as follows:
1. The operation of the mobile laboratory lias been very good.
2. Analytical methods initially used or later developed have in
general been quite satisfactory and reliable.
5. Sufficient data have not been obtained to draw firm conclusions, but based on the available data the following tentative conclusions can be drawn:
a. The quantity of material over the area investigated is not sufficiently great to be liazardous to health. All of the concentrations of contaminants have been well below the
limits established by the various health agencies.
EM003747
-2`
b. The atmosphere does contain certain materials conducive to corrosion. Traces of chlorine, chloride, ammonia, sulfur dioxide and alkali have been found on a number of occasions. The greatest amount of corrosion uas found at the position north
of the main Cafeteria.
c. Data obtained gives fairly accurate information as to what the situation is at the sampling locations. Contamination within the plant area is likely to occur from sources other than Esso and ve are apparently getting a measure of what is happen ing to Esso as a result of other industry. We are not, however,
getting too much information as to what Esso plant operations 8re contributing to the atmosphere outside the Refinery.
4. Total dust fall data have been unsatisfactory due to large amounts of rain and other factors. Because of the importance of these data efforts are being made to devise a method which will be satisfactory*
work.
firs. Choppin and West made the following recommendations for future '
(1) Since sufficient data are not yet available to draw firm con clusions the study should be continued for at least one more year.
(2) The test schedule and points of sampling should be revised, in view of the results to date, to obtain data of greatest value.
(3) Since present results do not give us a measure of what migit be the situation in residential areas some distance away from the plant, consider ation should be given to carrying on some planned studies outside the plant area. Specifically they proposed that they retain a full-time qualified man for this and for analytical development studies at an additional cost to Esso of $5,000 - $7,000 per year.
It is our recommendation that the present studies be continued for smother year, with suitable revisions in sampling points and schedules. Al though information on atmospheric analyses in outlying areas, under conditions suggested by Brs. Choppin and West, is important, we do not feel that it is desirable to extend the scope of the studies at this time. If you are in agree
ment with this recommendation ve shall make the necessary arrangements to have the contract extended for an additional year, beginning April 1.
Very truly yours.
EMHjmab Attachment
EM003748
t
meeting with ers. choppin and west on the air analysis program
Drs. A. R. Choppin and Philip W. West met with the following on January 15th to discuss the work they had been doing for Esso:
M. B. Amis
R. K. Dix
J. E. Hiller H. E. Westbrook J. E. Wood
Dr. West presented a survey of their work. The principal points covered were as follows:
1. The operation of their mobile laboratory had been very good. Results were
better than they had expected.
2. The dust determinations are significant and reliable.
3. The dust identification has been good and different observers have been able
' to check each other.
.
A. Dustfall has been unsatisfactory because of large amount of rain and due to
mold growths. (See below)
5. Methods of determining chemicals have been fairly satisfactory with lower limits
of accuracy about as follows:
Ammoniumt chloride and sulphate
0.1 mg/cm
S02 -
0.01 p.p.m.
Aromatic Hydrocarbons
4.0 p.p.m.
H?S .01 p.p.m.
Oxides of nitrogen
.02 p.p.m.
pH - Now checking this. pH seems signficant but the limit of
accuracy has not been determined.
6. Corrosion samples in the refinery have been good and seem to be significant
indicating a very much greater rate of corrosion of cu, al, galvanized iron
and iron just north of the main cafeteria. The samples at Anchorage and
Maryland were torn down by the men who cut the grass. They have now been
replaced, however.
:
In the general discussion it was pointed out that the dustfall data were
very important. Drs. Choppin and West thought they could modify their apparatus
to get better data. They will either use a 1/4 sq. ft. funnel area in place of
1 sq. ft. or will change the samples more often.
j
Dr. Choppin felt that the data to date indicated that Esso was doing
no harm to anything in the refinery. He suggested* however, extending the pro gram to have a full time man take samples three days per week in and outside the plant to be sure that Esso was not causing trouble to those on the outside. This plan would cost S5.000.00 - $7,000.00 more than the $7,200.00 per year for continu ing the present sampling schedule. Drs. Choppin and West felt the present sampling schedule was significant and should be continued even if the work outside the
refinery was not done.
They suggested Esso allowing them more leeway in changing sample points
if a particular discharge could be checked by sampling in another location. They
said that they could not personally spend any more time on the project than they
are now spending. We gathered the impression that they would like to continue.
however. (Dr. West stated that they had not made a cent out of the work this year
because of the high cost of the equipment.)
.
It was suggested that Drs. Choppin and West include more data concerning the prevailing direction of the wind for the hour proceeding their analyses.
Esso representatives are to let Drs. Choppin and West know soon what ..
program they want to carry out on air analyses.
!
J. E. HILUR
EM003 75 0
S O U T H Q ATS* STATIOM
(< ______ \
ifmnw
o
o2:
LL)
*
^ 5- & / -f ^
. t^p Z/^5
., S
EM003752
__ _
V
nlceRs^BBRfciknoommccct
j m cm.cn - oeto o nue***
A J KtU-Y - GlmPtmCTlAUMO AQCKT
caton novae orrtcc T. C. CVALTCnS - OlV Pune"**** KBIT
ESSO STANDARD OIL COMPANY
pa"*. i^jrLOLOUIUSIISAINAANAOlOVlIVSIISOINON PURCHASING DEPARTMI
P. a BO m baton rouge 1. LA
DATE 12-48-53
38**5 PPL
OROCR
PURCHASE 01
tUISITieMIMC BtP'T.
To . 3,
,>!. iJ
^' / A. *v
KEN Itm LABOftATBRY AUBIW LANE ROUTE t BATON ROUGE, LA.
"1
PLEASE SHIP TO:
ESSO STANDARD OIL COMPANY. NORTH BATON ROUGE LA
___ ATTENTION:
VIA-
Abeae otoei NUMBER amt oppaer a* el iaraicaa. lading, eapmt tecaip* and-cocTaapoadanca. On L C nan. .orb a* dapping toga and poAogm aibb ebova >
CAJH.OKD SWMENIS - On do* bI abipaanr. tafagrt Scat nedtr auaabar, point el erigin, cat mmber, end < mating. Aimed copy el bid el loding end dipping aa dam doning datoiWd contowi el cor to Onrition fu Agent.
THIS CODE NO MUST APPEAR ON Aa INVOICES & PACKING LISTS
QUANTITY
DESCRIPTION
TO COVER COST Of PERFORMING SPECIAL ANALYTICAL WORK AT DC BATON ROtfQE REFINERY DURING TOE APPROXIMATE PERIOD t
OT DECEMBER 21, l$53 TO JANUARY 22, 133k.
1 1 I
1
,
charge'
s!
1
;
J
i
i
?
1 \ \ 1
j
*
1 1
;
s
!
;
111 I j
i
l
CHARGES WILL BE AT TOC RATE OF $10*00 PER HOUR FOR TIME SPENT IN PfCPARATION OF MATERIALS. IN TRAVEL 1NO TO AND FROM TOE REFINERY AND IN ACTUAL ANALYTICAL WORK AT TOE REF INERT* THIS RATE INCLUDES ALL
OPERATIONAL COSTS INVOLVED IN THE WORK*
CONFIRNING 'PHONE ORDER OF 12-18-53-
CONTRACTOR SHALL CARRY WOftttCM'S COM
PENSATION INSURANCE AND PUBLIC LIABILITY AHD PROPERTY DAMAGE INSURANCE IN JWOUNTS SATISFACTORY TO ESSO*
EVIDENCE OF INSURANCE IS ON FILE, AND
IT IS NOT NECESSARY TO SCNO AN ADDITIONAL
CERTIFICATE*
.
CONTRACTOR IS TO CONTACT MR* J.W. CARMCNA,
OUR FIELD CONSTRUCTION COORDINATOR, AT
TELEPHONE 7-*32l, EXTENSION 318, IN
ADVANCE OF STARTING WORK.
1710-663
MESSRS* a.r. ckoppin ako phillip WSST D9INQ BBSness AS KEM TECH LABORATORY