SINGLE LAYER
HI-TEMP APPLICATION
SECTION 1 Page 4
2 PREPARATION FOR APPLICATION
2A EQUIPMENT AND DUCTWORK
2A1 A material and fabrication take-off shall be made several days prior to the date the equipment or ductwork is to be released for insulating.
2A1.1 A sketch shall be made showing the pertinent dimensions and