Document Gy66qxvno2evK4VnYYr1QagY
(
Texas City,
Texas
Company April 9>
cc: J. V. Waggoner
R. T. Clark
E. M. Jones
frit. M. Keating
P. D. Montgomery/
G. L. Wofford
D. R. Goodfellow
H. D. Woodmansee
1959
J. C. Boles
P. W. Kent
J. W. Porte
Nina Hadden/G. L. Roberts
S La Hunter
TO: Pile
Ref: My call report 4/8/58
Sub j: VISIT TO DIAMOND ALKALI COMPANY DEER PARK., TEXAS
VINYL CHLORIDE MONOMER
In the referenee call report I stated that Diamond had always found our Vinyl Chloride Monomer to have a slower reaction rate than competitors 1 or their own VCM. This was an error. I should have stated that they had always
found our VCM to have a slightly faster reaction rate. The recent complaints from Great American plastics Co. and General Tire Company have been to the effect that our VCM reacts more slowly. This conflicting information means that either our material is better than some
monomers on the market and worse than others or that the rate of reaction of VCM cannot be expected to have the same reaction characteristics in any one customer's process relative to another customer's process.
DMB:rf
D. M. Brown
C8Y 1111869 RSV0031170
MONSANTO CHEMICAL G^.JANY Locations Texas City, Texas Date : November 3, 1959 Subject : ProceBB Hazard Committee Report
Safety Board
To J. S. Putnam
Early in 1999 a complete and maBBive report was prepared showing the status of the varlouB Items llBted by the Process Hazard Committee. Many of theBe items have been completed or otherwise disposed of and this letter is a summary of the present btatus. Each general operating supervisor was contacted concerning his particular group of items and present status was determined.
The items on the attached list are grouped into six categories:
1. ThoBe completed.
2. Those which supervision considers nonh&zardous.
3. Those which supervision considers non-Justi fiable for hazard correction.
4. Those for which a continuous program or schedule is now in existence.
/ 5. , Those not done.
V 6./ Those that are in active progress toward -- correction.
I consider the first four of the above categories to be "completed" items because either the work has actually been completed or is not going to be done, or is of such a nature that it requires continuous vigilance and will not reach a status of being completed.
It is suggested that, if another such comprehensive Pro cess Hazard Report is to be prepared, the items in these four catagoriea be dropped from that future report and only the items in categories five end six be included.
CLG:lt Attachment
C. L. Gilmore SC
16667
RSV0031171
I. THOSE COMPLETED
Item Ho.
Description
5
Fire protection for south tank farm.
18 Portable pumpB without re lief valves protecting auction and discharge.
25
Air purge failure on non-explosion proof analytical Instruments can create explo
sion.
27 Fire Water Supply 28 Inadequate fire protection at propane
storage.
36 Loss of all refrigeration engines at same time.
45- Alkylation liquor (AL)- water separator. 46 Reaction mixture separator
' 5257 58 59 63 67 71 73 76 78 79 80
HC1 feed control Vacuum operation Salt water failure Area Control valves Age of unit Hydrogen flare system Introduction of organic impuritieB Converter Flame-out Soot Filters Polymer in Compressor Compressor House -Water entrainment into compression
SC 16668
RSV0031172
Item Mo. 82 84 96 99
101 102
106 107
110 111
114 116
121
125
128
132 133 136 137 138
139
140
141
TTACHMENT PAGE 2
Description Vacuum Columns (18D7 and 8) Acetylene Distribution System Acid Scrubber (1904) Rerunning off-specification HCN HCN Storage Bypassing Control Valves Reaction Inhibitors Proposed Catalyst System Reactor Spiking Waste Organic Surge Tank (20T16) HCN Vaporizer EDC reactor (2371) 1) TJJpset can relieve Cl2 to main VCM flare (C2H2 present main flare). C0H2 Separator (22S3) 1) Vessel relieves through RD to atmosphere. Cracking separator (22S1) coke plugging makeB KV undependable VCM storage (22T9)-Insufficient level gauges. CE column (22D8) Corrosive service. Refrigeration turbine (22DP1) Acid unit (department 21) deteriorating. Comnunications -- One phone in control room. C2H4 and CgHg communication easily interrupted. VCM compressor (22C2) - No RV on positive dis placement compressor Possible cross connection with sanitary water to contaminate drinking HgO. Reactor (26ri) maintenance decontamination pro blem.
SC ^6669
RSV0031173
Item No. 149 154 162 166 167 170
171 173 181 183 190 191 192 193 194 195 196 197 198 207 208
209
211
216
ATTACHME.
PAGE 3
DescriptIon
TBA Tank Cars
CO Concentration In Area
Product Separator (41S17)
Peroxide Storage
Product Separator (41S17)
Proposed use of chilled water In department 41.
Building Evacuation
Styrene tar feed line
General Electric Turbineb
Styrene Rack, organics In soil.
PreBBure Cells
RPU
Little RPU
Pilot Plant - EKA
Pilot Plant - Cyanurlc Chloride
Pilot Plant - Oxidative Chlorination
Pilot Plant - General
High pressure testing
Low pressure testing
Car and Loading Grounding
Operational procedures and Training not Ready.
HCN Shipping Piping Around 20P134
SC
Pressurizing TD2 and 7D3
16670
RSV0031174
ATTACHMENT PAGE 4
Item No.
217 218 219 220 221
222 226 228 229 230
Description
Department 5 vent system Department 7 vent Bystem Department 8 common vents 16K1 has no relief valve Department 16 expansion contemplates methanol brine system. Oxygen Compressor Fire Drainage Ethylene In Cooling Tower Low pressure Polyethylene Pilot Plant Oxidative Chlorination, 1/29/58
II NON-HAZARDOUS 2 Use of plant air system for respiratory masks 4 Out-of-date flow sheets 6 Inavailability of nitrogen for purge purposes
during oxygen plant shutdowns 10 Flame arrestors 14 Reciprocating engine protectivedevices. 30 Flammable mixture can occur In quenchers during
decoking 34 Spill and fire at liquid ethylene storage tank
spreading widely because of no fire wall. 37 Emergency disposition of butane In case of
tank rupture. 38 Valves In acetylene system contain copper bearing
alloys, which can produce oopper-acetylide which is spontaneously explosive.
SC 16671
RSV0031175
Item No. 43
44
46 49 50
51 55 70 72 81 83 86 87 88 90 93 108
109 113 117 118 126
ATTACHMENT
PACE 5
Description Unable to purge acetylene lines during emergencies. Ethylene feed pressure control Temperature control on alkylators Pressure relief of alkylators Ethylene feed control Alkylated liquor line from orifice washers to separator Reaction mixture scrubber Vent System Air Intake (for plant air) Excess nitrogen In Oxygen Off-gas flare system Oxygen Analyzers Product Acetylene Column (l8D5) Adsorber (l8Dl) Oas Holder Reactor Interlock Spent Catalyst AN Storage
AN Storage
Light EndB Column Surge Tank (20T10)
Reactor Relief
SC
Cycle Gas System
CgHg driers (22A1)
1) Possible to inject CgHg into hot (275*0) uirjr' iMid by human error
2) Possible to send CgHg mixed with NO to boiler house through human error.
16672
RSV0031176
Item Ho.
127
131
142
146 147 148 163 164 165 179 185 187
202 224
ATTAGH^_JT PAGE 6
Description
Reaction off-gas flare haB standard type flame arrestor but must burn some CgHg VCM storage (22T4). Three rundowns in single tank wall. Explosive mixture In flare due to Og andCj>H^ low conversion. Lima Slaker TBA Product Column (25D1) TBA Storage Xylol Handling Experimental superpressure line. Recycle Gas Waste gas line from department 18 LPO Truck Rack - Fire Hazard. Empty Transport Containers Contain Explosive Mixtures. Chlorine Barge Unloading Single means of access or exit from the cold boxeB.
III NO JUSTIFICATION
J3
Rupture of compressor discharge line can cause fire and spill.
66 Salt Water failure
77 Recycle Qas Control
94 Reactor Cone 97 HCN Stripper
SC 16673
RSV0031177
ATTACHMENT
PAGE 7
Item No. 103 115 l6l 172 175
177 183 186
Description Unit Cyanide Vent Acetylene System Compressor House Oilfield boilers Expansion joints in steam distribution syBtem. G&b shut-off valve LPO Truck Rack --Fire Hazard VCM and Chlorine Tank Car Rack Near Residences.
Iff CONTINUOUS
3 Identification of material in piping by color code.
7 Unauthorized personnel entering operating areas.
9 Railroad cars dispatched to railroad shops in contaminated condition.
11 Priority of expansions vs. existing plant engineer ing and research work.
12 Field Communications 18 Routine inspection of turbine over-speeds not
followed.
17 Routine relief valve inspection not followed.
20 Minimum Job training of Operators
23 Equipment is being operated at above design conditions.
24 CauBtic piping
29 Wystemie poisoning of personnel by lead oxide in lead pot area.
SC 16674
RSV0031178
Item No.
31
32 42
53 54 60 62 65 95 104 105 123 130 134 156 160 1?4 176 178 182 184 189
199 200
ATTACHMENT
FACS 8
Description
Failure of reciprocating engine parte due to old age.
Pyrophoric polymer la made in 1D3 stripper.
Sparks from Dept. 1 and 10 flare can start fires on ground and on near-by wooden build ings.
Plnely divided aluminum
Off-gas water scrubbing towers
Condition of piping In department 5-7
Storage tank polymerisations
Main condenser
HCN absorber (19D5)
"Buddy" System
Area Sump
23T5 vapor space explosive
Cracker condenser (22E4) tube leaks to CTV side
Air In organic columns on shutdown
Methanol Storage. Tank Blanketing.
Area Spill Alarm
Mixed gas control
Emergency air cospressors
16675
Control valve servicing
Chlorine distribution
Acid loading lines in poor condition.
Dock and Bay Area Fire Protection In adequate .
Shop testing and repair
Qas cylinder handling
RSV003U79
AT CEMENT PACE 9
Item No.
201 203 204 214 223
Description
Drum Handling Acetaldehyde Tank Car Loading HCN Tank Car Loading Explosive mixture In tanks and towers Oxygen Line Labeling In Pipe Racks
V NOT PONE
Item No.
16
Description
Comments
Routine inspection of turbine over- Action on this Item
speeds not followed.
not decided on nor
justification developed.
61 Runaway polymerizations 64 Relief System
Status unknown Hazard exist, but re peated studies Indicate excessive cost to correct
68 Salt Water Failure
Hazard exist, but re peated studies Indicate excessive cost to correct
91 TeBt Ignitor 92 Main Flare
No comments Entrainment exists, no change on procedure yet.
112 Acetylene Feed Control
Engineering study to be made. Research work completed.
119 Acetylene Compressor
No action as yet.
120 Acetylene Stripper
No action as yet.
129
Quench tank (22T18) HV dis charges to atmosphere on west
Engineering study re quired, no priority.
side of distillation structure.
143 Plant Sewers 144 Reactor
SC 16676
Sewer model unsuccessful
a) Completed b)Not done
RSV0031180
at chment PAGE 10
Item Mo,
Description
144 Continued
145 IBY-HCN Mix Tank 150 Hydrolyzer 158 Relief Venting
205 M7A Concentration In20E44 212 Alkylation liquor (AL) - water
separator 232 Fire Water Supply
Comments
cl Hot Done d| Not done e) Not done Ho Action Ho Action Originally considered no hazard, but with expansion,needs re evaluating. Ho test as yet Ho comments
VI ACTIVE
1
Use of Sanitary water for pro
Completion date
cess purposes.
January 1, i960
8 Fire Alarm System
System has been changed and an operable better system being Investigated .
13
Momentary fuel gas failures cauBe a) Completed explosions in direct fired vessels. b) No Justification
cl No hazard
d) Active
Responsibility of
Utilities Section.
19
Operating and Design Manu&lB out of Date.
Manuals in various de grees of coiqpleteness.
Continuous Item once
brought up to date.
21 Expansion of units produces Various plant expansions
underBlzed relief valves.
now In progress.
16677
RSV0031181
Item No. 26 35
56 69
74 75 85 89
98
100 122
124
135
ATTACHMKK
PAGE 11
Description pipe racks Use of drummed methanol creates sources cf fire while drum Is open Benzene column, 4D1 Air Intake (for Oxygen Plant)
Converter Stacks Soot Higher Acetylene Stripper (18D4) HH3 Storage
Polymerization control by add Inhibition Waste streams Off-Oas System
Chlorine Storage
EDC-RoO separator (22S7)j HgO saturated with organics goes to sewer.
Comments Signs are being re quested and Installed. Will be installed.
Engineering study required.
Tech Services has com pleted study, report and evaluation In pro* gress.
Engineering Study
Long term study - Progress
Now testing analyzer
Valves exist on vertical tank, HVs plan similar for horizontal tank.
Inhibitor system completed. Polymerization hazards under study.
Evaluation in progress In department 24.
RV In early i960. Chromatograph Instrument Is under study.
1 Not Justifiable
2 Completed
2j
Aetlve Continuous
Another tank to be Installed.
SC 16678
RSV0031182
Item No.
151
152
153 155 157 159
168 169 180 188 210
213 215
225 227
ATTACHMT ?
PAGE 12
Description
Hydrogenation Ohlt
Linde Unit
Waste Gas Line Waste Gas Header Compressor House High Pressure Piping
Polyethylene Storage Polyethylene Dust Instrument Air Old Seatraln Tanks in Poor Repair Acetaldehyde Rundown Tanks
Reaction Mixture separator Sulfur pots
Vacuum Trip on Feed Gas Com pressors (31C5) Catalyst Spill
SC
Comments
a PAFE Approved b PAFE Approved c Completed a Continuous b( Active c, Active Awaiting approval Awaiting approval Awaiting approval Considered no personal hazard probable, however, test program in progress. Study In Progress Study in Progress 30 lb. System study.
Tanks being sold Research Study In Pro gress. Engineering Study in Progress. Target Date November 1959 Part of expansion work 1) Research work dis
continued. 2} Completed 3) Active. Approval requested
Requires fire training. Grounds and testing pro gram will become active soon.
16679
RSV0031181
Item Ho. 231
ATTA' "'ENT
PAGE 13
Description
General Problem of transmlsslon system seems to Indicate a thorough safety study Is needed.
Comments Engineering study
SC 16680 RSV0031184