Document Gma1K8mrYmebgV7JBnnqEY307

RECEIVED m3 ASBESTOS.OPERATIONS report ft/* King City, Cal: January 1971 . PRODUCT STATUS High Purity Pigment Resin Grade 1 Resin Grade 2 Standard Drilling Mud Export Total Plan Tons 350 67 58 16 588 175 235 1,489 Jan Tons 268 30 47 13 815 153 252 1,451 SALES % Plan 77 45 81 81 139 87 .107 .97 YTD Tons 268 30 47 13 815 153 252 1,451 % Plan J anuary Tons Produc 77 712 45 0 81 0 81 23 139 664 87 0 107 97 1,399 SALES ORDER DEPT. There were 105 orders pi.aced an d 98 invo ices prepared. The dollar value of sales was down somev.hat due to nrodu.ct mix. OPERATIONS The plant operated two shifts, five days in all circuits during the 20 operating days in January. Ore usage figures were adjusted to reflect actual consumption from the current stockpile. Cost savings effected by month's end included reduction of the hourly work force by 6 persons and the salary force by 3 persons. At present there are no plans to replace the 14 person reduction completed since December 27, 1.970. MAINTENANCE Exposed water lines were frozen during a period of unusually cold weather. Thermal shock apparently loosened the front "tire" on the Rotolouvre Dryer. Repairs were made before any major damage occurred. continuned.......... co / / Asbestos Operations Report January 1971 Page 2.............. A new vertical sump pump was installed in the secondary cyclone area. This will improve clean up and result in a small amount of increased product recover. SAFETY/IBD Three men went for medical treatment during January. 1. A wind "blown particle in the eye. 2. Back pain from lifting a 10# bag of product. J>. Back pain from lifting a pump. Mr. John Biddle is now in the Niagara Engineering group, and Mr. F. H. Larrison has assumed his duties at King City. MINING DEPARTMENT For the most part, January rains and snow precluded work in the pit area. The two hourly employees worked at the mill dozing stockpiles and working with the maintenance and production crews." The D-8 Caterpillar was transported from the mine to- the mill and is used to doze ore and tailings. The machine will be returned to the mine in time for the Spring work program. Electrical and hydraulic repair work on the Michigan loader is completed. One recapped tire is on hand and a new tire will be ordered in February. These will replace two badly-worn tires on the front wheels; the back tires were new in 1970. Some work on the annual claim post inspection program was done in late January. This is chargeable to assessment work, and is required by California law The study of ore haulage by an independent trucker at PUC rates VS UCC trucks and drivers is completed. Possible savings to be gained by operating our own trucks seem impressive, however, the pitfalls and unknowns of getting into the trucking business must be analysed as carefully as possible. If a decision to proceed is forthcoming, ore haulage should begin in March. An examination of the merits of opening a brand new pit VS continued stripping of the existing mine is" about completed. Mr. John Karoney has assisted in this analysis, which presently indicates that another pit should not be started at this time. E. 0. Marsten