Monsanto
FL tEaX/H,'IBIT
Anniston Plant
- -/* # 7
TECHNICAL SERVICES DEPARTMENT
MONTHLY REPORT
Anni slon
Summary
C. K. Eastman A. G. Hill L. C. Lahman J, C. Landwehr G. W. Miller W, B, Papageorge W. F. Taffee H. L. Willlame
Month
September, 1969
Coat Improvement Results
Eat. Act.Target7. of Target
$63,120
$66,285
95.27.
II j
General Offices
YTD
$430,976
$438,570
98.37.
H. S. Bergen
H. c. Carder
D. Danna (5) P. B. Hodges D. B, Hosmer (2)
w. A. Kuhn
J. A. Morgan
w. R. Roblrds
J. E. Smith J. A. Stephens R. J. Stratmeyer
H. s. Trail
OTHER LOCATIONS
A. H. Foretan Alvin, Texas
D. W. Jackson WCK
T. M. Patrick So, 2nd St.
Organic Division
The Solid Aroclor 5460 yield increase instrumentation has been installed. Calibration and start-up will begin when 5460 is produced in early October.
The Sandvik belt test on Montar 5 was successfully completed. Installation costs will be estimated in October.
Muriatic Acid - MTP was reviewed in plant on 9/10. Neceaaary revisions to be completed during October.
Agricultural Division
-
The Acetone Recovery project was verbally approved 9/29 for $32,125 capital and $28,600 expense. Expected savings are $40,000/yr.
C.E.D. has suspended scoping and estimating activities on original Sulfur Recovery Project and will evaluate alternates to obtain the major yield savings at a lower capital cost.
Nlran - Tentative Process Amendments are being prepared for
plant trials of Freon-21 replacing Freon-ll as chlorinator coolant and HC1 replacing nitrogen as chlorination sparge
ga.
_
CO .Y
CONFIDENTIAL
TRAN 025165
v COMPANY CONFIDENTIAL INFORMATION
``Thu document contain* confidential infotmstion which is the piopeity of Monsanto Company. Only those pottlons of the document lelevant to a duly authoiized individual's need to know may be eneipted foi him. The lepoit mutt not be sent outside the Company without wiitten appioval and the lecipient is accountable lot its safe keeping, eseipting otheiwise disclosing of its contents and foi its piopei disposal."
WATER PCB-SD0000005834
Company Confidential 2.
Utilities Evaluation of Central Air Compressor system started, with December report target.
Design & Drafting Data being gathered for electrical protective device study which will lead to reconanendations to improve reliability of overload protective devices in Important feeders. Construction drawings forwarded for Biphenyl Pilot Unit building and Parathlon emergency generators.
Pollution Control HCl neutralization pit contlnues to successfully treat all waste acid. Construction 957. complete on test unit for removal of solids in Waste Treatment Plant effluent. Start-up targeted for early October,
Quality Control The Plant Quality Score was 86.1, down 7.6 from August with a YTD score of 88,1 against a 1969 target of 95.0 minimum, Unfavorable trends continue in Aroclor 5460 solubility, Aroclor 1242 low dis tillation and TC Chlorides. Raw material benzol remain at low distillation level, with intermittent high toluene.
. C, Landwehr :kd
COiv/ii- /~\\ ) y CONFIDENTIAL
TRAN 025166
WATER PCB-SD0000005835
) ORGANIC DIVISION
1969 TSD COST IMPROVEMENT
ANNUAL JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV PRC
Sol. Aro. Leve 1 TAR
Ind.f, -Still SpC EST
_AJLJLQI5_________ ACT
Solid Aro.
TAR
Lower 5060 Soft. Point
EST. ACT
2250 2250 .221
--
--
** -
2250 225 0 225 0 2250 -
-2600 S690 2600 2600 2600 2600 2600 2600 ?6oo
1500 5490 4090 215C 467 C 800C 4230 7TJCT 3475 1500 54 90 4 8 90 2L5C 467 C 800C 4eJpU 7730
-
--
Sol.Aro.-Still TAR Coolant temp. EST. AFE 5015_________ ACT
_i6o -120 *60 1,79 *60 170 160 170 L60
-"
Sol .Aro, -Chlortar JM.
Batch End
EST;
3?0 399 .39a. 390 390 390 3?o 390 39 0
AE&JiflIS__________ ACT Sol.Aro. Yield TAR
SW/R Composition EST
,,AFS ,3016_________ ACT
Solid Aro,
TAR
Montar 5 Flake EST
-^FE 2949__________ ACT
2750 2750 2750 2750 2750 2750 2750 2750 ""
mo, IMP 1P?0 *0?0 1090 1080 1080 1080
-""
Sol.Aro, Blend 4465
TAR _25QQ 2590 2500 250Q 2500 2500 2500 piqp 25 0Q 2500 2500 2500 EST 1690 1920 1600 1490 710 1180 990 220 ACT 1690 1920 1630 14 9 C 710 1180 990 220
Sol.Aro.-Vcrti- TAR
cal Still Cond. EST
AFE 2324
ACT
70 70
90 90
70 90
0 70 9 0 90
"
-
"
70 90 90 90 90 -
"
Sol.Aro.Clg T/C Dock AFE 2542
TAR EST
ACT
940 940 950 0-0
Sol.Aro.-New Cl2 TAR
Unload - No Delay EST'
-CEP.1851__________ ACT
Sol id Aro.-Flake TAR
& Drum
EST.
CED 1450
ACT
Liq.Aro.
TAR
48-53 M #/yr. EST
AFE 2545
ACT
950 . 94Q 950 940 950 940 950
900 2330 2050 2320 1650 900 2 330 aosiL 2320
3000
5000 5000 5000 5000 5000 5000 5000 5090 5000 5000
0 0 100U 2000 2000 2000 300c 3000 3000 0 0 1000 2000 200C 3000 30CC 3000
5000 5QQ0- - - - - - - - - - -
0 550C 0 550C "
-- -" -
Liq.Aro.-No,2 TAR
3000 3000
Still Entrain Sep. est:
AFE 5095
ACT
Liq.Aro.-Montar TAR
Disposal
EST
AFE 295?
ACT
T 08 0 108p 3,080 io?9 *090 1080 1080 1080 1080 1080
0 00
00 0 -
0 00
00
-
Warehouse
TAR
Reduce Manpower EST'
CEA 1452
ACT
2000 3000 3000 3000 5Q0Q 300Q 3000 3000 3000 3000 3000 3000 2000 2C0u t00C 3000 3000 3000 300c 300C 30UC 2000 200C 20a 3000 300C 3000 300c 300C
Liq,Aro,New
TAR
Burners #3 Still EST
ACT
*?0p 1500 1500 1,500 1500 1500 1500 *500 1500 1500
0
0 1500 3000 900 0
-
0 0 1500 3000 900 -
Biphenyl Relocate TAR
No. 1 Preheat EST
CEA 1892
ACT
500 500 500 500 500 500 5 00 500 500 500 500 500
1500
0 1560 1870 0
0 15DC 0
150C 0 6 10 1370 0
0 150C -
HB -40
2nd Autoclave AFE 3102
TAR
EST ACT
3000
2230 3490
3000 3000
2580 0 24 2C 0
3000 3000 3000
3000 3000 3000 3000 3000
600 iwu 6000 Wo 4?<TCT 5TJU
600 1.0,40c 8600
6950
COMTPmArv1 <vv/rJ TRAN 025167
CONFIDEN \ iAl
WATER PCB-SD0000005836
ORGANIC DIVISION 1969 TSD COST IMPROVEMENT
ANNUAL JAN FEB MAR APR MAY JUN JUL AUG . SEP OCT NOV DEC
BiO Improve Tower Treat, AFE 5155 Improve Pit, Power Factor
TAR
EST -ACT TAR
EST ACT
450 459 450 450 4S0 450 450 450
00
0 584 645
00
0 585
900 900 900 900 900 990 900 900 0 500 900 yOo 9U0 0 500 83O 990
Central Air System
TAR EST
1000 1000 1000 1000
-
ACT
Optimize Rx Time PNP
TAR EST ACT
21Q0. 2m 2100 2500 2500 2500 2500 2500 2500 2500 2500
0 3420 0
0 0 294 0 L2bcr 9
0 3420 0
0 0 2940 2370
Reduce Mole Ratio NaOH/PNCB PNP
TAR EST ACT
m 4000 4000 4000 4000 4000 4000 4000
0
00
0u0
0 00 0 0
New Mash Mater Pump - PNP AFE 2998 Automatic pH Control
TAR EST ACT TAR EST
so 50 50 50 50 50 50 50 25 50 50 50 50 5 0 su 50 25 __5jQ_ ~10_ 50 50 50 50
500 500 500
PNP ACT
HC1 Filter Pump
TAR 330 330 540
EST 330 550 >40 ACT 3 3 >40
Now Blow Tnnk HC1.
TAR 200 290 209 200 200 200 EST 200 200 200 2U0 500 200 ACT 200 200 200 200 200 200
150,000 Cal.-HCl
Storage Tank
AFE 2468
.....
TAR EST
ACT
1769 1760 1790 1760 1760 1780 1760 1760 1780
"
u "
0 264 0 3290 2990 0 2830 3430
Produce Staley Grade Acid AFE 5076
TAR EST ACT
O
00 r-*
780 790 780 780 790 -
Cla Plt, Shutdown TAR
EST
CEA 1851
ACT
8880 8880 8880 8880 8880 8880 8880
0880
42885 L9900 *199(1
22% 6655 .2855 19900
H{j Recover from Residue
TAR _250 250 250 250
EST 3910 0
00
ACT 3910 0 0 0
Hg Wash Tank
AFE 2802 Biphenyl Productivity
TAR. EST ACT -TAR _ EST
ACT
250 250 250 250
o 0
0 0
0u 00
5600 5600 5600 5600 T600 Tgoo TSoo 5600 TSoo 5600 5600 S600
0 9u6u .5,0CX 0 0 0 3(3753; 2700 0
1800 5900 13.500 0
0
0 307 8 C 2700
Total Organic By Month M $
Total Organic YTD M $
'
TAR
EST ACT TAR
EST ACT
23-.; 20" 29.3 57.5 42-3 51.1 51.6 51.6 51.6
27.1 30.2 11.5 56.5 39.165 107.4
4 9.41C
16.5 23.8 27.3 11.4 25.75 45.9 110.SE 258.16 >
2?. 3 50. 1 46.9
79.4 78.8
116-9 79.6
159.2 115.9
2Wl
144.4
261.9 2505]
Hhf 365.1, 315U3 3es.ee
417.8
1
16.5 40.3 68.1 79.5 105.2 15U a5l.2Qf 31945
55.5 47 1.3' 521.9
COMPANY CONFIDENTIAL
**$27,780 adjustment included for months January thru June.
TRAN 025168
WATER PCB-SD0000005837
) AG DIVISION 1969 tsd cost improvement
ANNUAL JAN
Cooling Tower
TAR
Repiping
EST
AFE 2598 Optimize N2 6
ACT. TAR
Cla Levels
EST
ACT
Increase Waste
tar__
Acid Sales
EST
ACT
Chlorinator R.I,
TAR
EST
AFE 2244
ACT
EVOP Condensation Rx,
TAR EST ACT
750 0 0
Cl2 Unloading
TAR
EST
CEA 1831
ACT
Recycle Wash
TAR
Water
EST'
AFE 2960
ACT
Parathion Recovery1 TAR
EST
AFE 2655
ACT
Reduce Acetone
TAR
Losses
EST
ACT
Formulations
TAR
EST
AFE 2897 ,
ACT
Change Cooling
TAR
HsO Item 7}7
EST
AFE 3067
ACT
Well HqO to Jets
TAR ..
EST
ACT
Ag. Division
TAR 750
by Month
EST
ACT 0
Ag. Division YTD
TAR
EST ACT
750 0
Ag. Division
TAR
untargeted-R.M.
EST
Charges optimlzatii nACT
TAR
Untnrgetod - MCI EST Catch Tank& Coalej eACT
Ag Div,-Untargeted TAR
EST
^3 Cl2 Change out ACT
fpo
OO
1
0 ,r00o0
0
01
K>
OO1
FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
40 420 410 410 420 420 410 420 420
0 00
00
0
0 00
00
66oo 6700 67 00 6600 67"00 67 00
0 00
00
0
0 00
00
400 00 00
300 400 500 0 00 000
0
400
$50 250 250 ?50 50 250
00
0
00
750 500
500 750 750
0 12,615 0 12,615
5000 5000 5000 2000 0 0 1580 00
890 ?90 290 P90 90 290
00
0
00
580015800 5800
4 500 4 500 45OO
1600 1600 a600 1600 1600 1600 J 000 6600 10,GOj 4570 2000 5950 43OO 10/t00 928 ^ 4 570 1205
125 135 125 125 125 125 125 125 125 12U 180 155 272 333 310 120 100 171 27 2 333
500 500 500
750 50C 914 5 9145 91 *5 14675 1A6B5
,14575 1443 5 14485
126$
6,7SO 10,155 4842 4053 L^lL
0 12,615 i,420 10,530 9459 484; 5 64 88
1500 ?QQC 13.145 2029.C
441 rc ,53785 7547 a 83045 KP5 < 1170,11
12,65 W %815 5? ,7* 41,9* 45,949 6^114
0 12,615 17,0^5 27,615 57.07441,916 48,404
0
17 OC 369 C
170C
0 000
5000 6250 596c 4690 1330c 0 9}5C 6817 4920
4180 3250
CC;'/P*NIV CONFIDEN. u->-
WATER PCB-SD0000005838
AROCLOR
' Company confidential 5.
E. E. Bowles, C. R. Mcllwaln, J. W. Mattern, (V. R. Haupt)
Evaluate Quaterphenyl-
Polyphenyl Effect# on
1969 Savings $63,200 TSD Objective
Solid Aroclor Yield#___________________ ________________ $14.000B - 8(a)
Radioactive source for level alarm installed. Representative from Ohmart Corp. conducted radiation survey and instrument checkout. Start up delayed because of department downtime and producing Solid Aroclors other than 5460. Expect to start mid October.
Montar Use and Disposal
Savings $13,000
Project 2952MFC.
$10,000B - 8(g)
TSD Objective
Request to change route of piping to avoid going through the Chlorine plant has delayed installation of project. Necessary equipment delivery date is estimated at 4*6 weeks.
Sandvik Belt Cooler for Montar 5 Solldlflcatlon
Solid Aroclor Expan-
TSD Objective
slon Evaluation_________________ B - 8(1)
The Pilot Unit Testing has been successfully completed with good results, Price and size estimations have not been finalized. However, preliminary "ball park" figures show that a belt to handle 8000#/hr, requires a cooling width of 4 ft. x 55 ft. long. The purchase price of this size unit is in the 3$ M dollar range.
Porocel Columns
Assist
CEP 2132ProductionTSD Job No. 950
North Porocel columns to treat chlorobenzenes were started up on September 19, 1969. Results of first trial were Inconclusive. Further quality improvement tests are planned.
The start-up of the South columns has been delayed by the Aroclor fire. Start-up is now planned for the week of October 6, 1969.
BIPHENYL-SANTOWAX
W. G. Niemeyer, D. A. Self, J. M. Jones, (V. R. Haupt)
Debottleneck Biphenyl-
Santowax Distillation Area
Capacity
to 87.6 M lbs./yr. BiphenylIncrease
TSD Objective 8 - 7(a)
Installation of by-pass loops with blow-out connections for the two Santowax C flow meters was scheduled for 9/10/69. However, only about one fourth of the planned work was completed. The problem was that the operators were not able to unplug the recycle line and it was not safe to cut and weld on the line. Maintenance is now scheduled to unplug the line, A capacity/performance tast run will be conducted on the Santowax distillation celumn after the meters are re-installed and calibrated.
COMPr- * ' CONFIDENT, AL
TRAN 025170
WATER PCB-SD0000005839
BIPHENYL-SANTOWAX - (continued)
Company confidantlal 4.
Low Biphenyl Santowax for FDA 5460
Salta Support
TSD Objective B - 7(b)
A tower water loop study is in progress to try to increase the cooling water flow to the Biphenyl/Santowax distillation area. Increased cool ing water flow to the distillation area is required to produce low biphenyl Santowax.
Prediction and Control of Dust Explosion Potential in Biphenyl Flaker Packaging Svt*nSafetyTSD Job No. 9^1
At our last plant meeting on this problem, we decided to convert the biphenyl packer from fluidizing with air to fluidising with nitrogen. However, the estimated operating expense for nitrogen is much higher than originally thought. The estimated operating cost for nitrogen will be $15,000 to $14,000 per year compared to $1500 that was originally esti mated, Wa plan to proceed with this conversion, in spite of the high cost, to eliminate a hazardous situation. Inart gas generation equipment will be evaluated to compare operating costs and most economical method used long term.
Designed Experiment Run on
Process
No. 1 Biphenyl FurnaceStudyB - 7(e)
TSD Objective
All the samples have bean analyzed. Preparation of a progress report is in progress. Test results will be used to update math model of this process.
Install Knockout Tank on Santowax Jet Vent
Safety __________ TSD Job No. 862
Complete design package was transmitted to Maintenance for construction on September 9, 1969.
Natural Gas Safety Shut-off Interlock SwitchSafetyTSD Job No. 94B__________________
Complete design package was transmitted to Maintenance for construction on September 25, 1969.
COfl/fp/An,
ONFIDen , iAL
TRAN 025171
WATER PCB-SD0000005840
I
Company confidant la1
5. HC1 G. L. Moore, L. 0. Chembere, K. G. Hale, (A. G. McCarty)
Production of Staley Grade
New Earninga $288 M
Acid - AFE-^076______ _____________ Potential Savings $71.000
TSD Objective B - lOfcl
Savings of $13,300 resulted from the Coalescer and Catch Tank project during September, Spare elements of a modified deslgn are being completed by the vendor.
Plant pilot carbon treatment studies are scheduled to be run in November. The objectives are; 1) Accumulate design data neceseary to expand the carbon treatment area, and 2) determine the carbon treatment and condi tions necessary to produce "Staley" acid. An experimental project for pilot test facilities is being Issued ($700 experimental expense).
TSD Objective Issue HC1J1IEPlanning8_-. Ubl _
Plant review was held en 9/10/69. Revisions are being made to several sections as a result of plant review. Revised cep las will be submitted for final rev lew by IO/3I.
Reduce High Free Cl2 in Muriatic Acid
Quality
TSD Job No. 9S0
An expense project is being Issued to Install necessary piping to air blow a second storage tank and provide a temporary air supply until the cause and/or cure to the high Cl2 problem can be found.
PNP L. 0. Chambers, K.. G. Hale, (A. G. McCarty)
Debottleneck to
Capacity Savings
-Li-H,,
TSD Objective
Process changes targeted at rsduclng PNCB usage resulted in let-down problems during September. No savings resulted in September, Additional changes will be made and monitored by P. & Q.A. to attempt PNCB usage optlmlxation.
NIRAN
K. G. Hals, D. W. Dudley, T. W. Lawrence, (A. G. McCarty)
Demonstrate Parethion Recovery
Savinge $17,400 10-15% Reduced COD
TSD Objective B - 5(a)
No change in status. Construction in progress on test fscilitles.
TRAN 025172
WATER PCB-SD0000005841
NIRAN * icontinued)
Company confidential 6.
Acetone
Savings $12,900
Recovery20% Raduced CODB - 5(1)
TSD Objective
Recovery teete on #3 condeneation reactor indicate a 30% reduction in acetone loss. Gross savings (ethyl and methyl) from increasing acetone recovery is $40,000 per year plus a 20% reduction in COD load. Project 3340 was verbally approved 9/29 for $32,125 capital and $28,600 expense. Manpower evaluations are presently underway to determine what parts of the project will be installed during the '69 fall turn-around.
Central Chlorlne Unloading for Niran
Savings $21,000
TSD Objective
_____________________________________________g--................
Evaluation of rebuilding 12 year old compressor vs. purchasing new com pressor favors the new compressor. Compressor will not be purchased or Installed until late winter to prove worth of air pad on "cold chlorine cars" during winter.
Sul fur Recovery from Residue
$271,000/yr. Net Savings TSD Objective 53% Reduction in SO?B - 5(d)
C.E D. has suspended work on the Sulfur Recovery scope and will evaluate alternates to obtain yield savings at a lower capital cost.
The new objective would be to remove sulfur and recycle organics, but not clean-up sulfur for ra-uae.
Improve Chlorinator Cooling System
Profit New Sales and Productivity
Savings $48,000/mo. per 0.5 Hour TSD Objective
Reduction In Chlorination Time
B - 5(g)
A Tentative Process Amendmsnt is being prepared to cover plant trial of Freon-21. If approval is given, expect to begin trial approximately one month prior to the end of the 1969-1970 Ethyl run and extend approximately one month into the 1970 Methyl run.
Improve Intermediate Distillation CapacityCapacity
TSD Job No, 972
Possibilities are remote for obtaining significant increases in inter mediate distillation capacity with existing equipment. It is felt that thin-film or wiped-film equipment may be ouitable for processing this type of material rapidly. Contacts will be made with thin-film vendors to explore the possibility of application to this problem.
TRAN 025173
WATER PCB-SD0000005842
)
NIRAN - (continued)
Company confidential 7.
Replace Nitrogen with HC1 for Chlorination Sparge
Savings $60.000
TSP Job No, 6Q''>
Anniston PR&D has shown that Hl sparge produces no adverse effects during chlorination compared to nitrogen sparge. Since HC1 is produced during chlorinetion, it could possible be recovered for use as sparge gas replacing nitrogen. A tentative Procees Amendment will be prepared covering a plant trial of sparging with cylinder HC1.
PROCESSES! CLUALITLANALYS.IS
J. L. Murphree, Allen Hale, (W. B. Dunlap)
Process Surveillance
An 18 month downward trend In distillation level of raw material benzol
was revealed, culminating In 6 tank cars out of specifications. Toluene
in benaol was found to be out of spec. These factors may be related to a
documented Increase in Aroclor 1242 TC Chlorides over the last 5 months.
PNP"Identification of
Potential Savings
Critical Variables$60.000TSD Job No. 8^9
TSD Objective C - J
A final report on yield study was written. Reactor settings will be ad justed and controlled experimentally to verify the statistical prediction of the study.
Potential Savings Nlran Still Control______________ $79.000TSD Job No. 964
An AFE was approved to obtain and install control equipment. Design and drafting is scheduled for the 4th quarter. Installation EDC is 3/1/70.
ENGINEERING DESIGN AND SERVICES
Mechanlcal/Elsctrleal/Instrument Design and Drafting
J. C. Price, J. A. Veasey,
J. 0. House, G. W. Richey, B. D. Morgan, R. V. Carlisle, R. L. Brewer, J. K. Rennie, <W, F. Taffee)
Design was completed on Project 3161 - $3.8 M, Automatic Temperature Control of Thio Acid Reactors #1 & 2. Review drawings were transmitted with con struction drawings to follow in October.
Design is in progress on Project 3II8 - $9.7'M, Modify Agitator Interlocks on all critical vessels in the Nlran department. Transmittal is expected in October.
TRAN 025174
WATER PCB-SD0000005843
' ENGINEERING.DESIGN AND SERVICES - (continued)
Company confidential 8.
The following project safety reviews wera held or attended: Fire Pump
Capacity Check Equipment (AFB 3227 - $4.1 M), Install Pressure Control Valves in Fire Protection System (AFE 3211 - 95.7 M), Biphenyl Pilot Unit (AFE 3297 - $13 M).
A program is underway to gather data necessary for preparatioa of a short circuit coordination study of the electrical portion of the Nlran department. The results of this study will lead to the compilation of a program for testing switches, circuit breakers, protective relays and, in general, all major electrical equipment that could cause prolonged downtime due to its failure.
Training and supervisory time remained at a high level this month because of time necessary due to three recent manpower additions to the department, One E & I Technician la on loan to the Maintenance department to instruct maintenance employes in an alectrical instrument course.
Premises wera prepared and forwarded for the following projects: Niran Intarmediate Tank-Car Cleaning, Building 27 Dismantling, Eliminate "Head Knocker" at Aroclor.
Drafting
Review drawings were completed for the following projects:
Install 4" Heat Exchanger in Biphenyl (AFE 3282 - $1.4 M), Final Wash TankPNP (AFE 3342 - $2.0 M), Automatic Temperature Control of Thio Acid Reactors (AFE 3I6I - $3.8 M), Dual Chlorine Relief Valves - Nlran (AFE 33IO - $3.5 M),
Acetone Recovery (Electrical) (AFE 33^0 " $50.7 M).
Construction drawings were completed for the following projects:
Replacement of Water Loop-HCl (AFE 3240 - $8.4 M), Biphenyl Pilot Unit (AFE 3297 - $13 M), Debottleneck Solid Aroclor (AFE 2897 - $20 M), Replace Niran Generators (AFE 3305 - $41.9 M), Install Nash Compressor at Eimco Filter-Waste Treatment (AFE 2820 - $4.6 M), Acetone Recovery - (Piping)
(AFE 3540 - $50.7 M).
UTILITIES ENGINEERING
J. C. Price, J. 0. House, M. L. Marcum, (W. F. Taffee)
Transmitted review drawings for Teat Heat Exchanger (AFE 3282 - 91.4M) on Biphenyl Coeling Water. The design package will be transmitted In October. Started preparation of Utilities Improvement Items for inclusion in the Aroclor MIP. Started evaluations of projects to replace existing air com pressors with a Central Plant Air Compressor (aaclmated gross savings $12.0 M 16.0 M per year) and to Improve Plant Power Factor (estimated gross savings 95.0 M - $9.0 M). The premise for the power factor project is expected to be forwarded in October and for the compressor project in late November or early December. Continued work on Steam Plant MIP with completion scheduled for December 15.
COMPANY CONFIDENTIAL
" ^AN 025175
t WATER PCB-SD0000005844
)
PLANT IMPROVEMENT
Company confidant la1 9.
G. C. Goodwin, (W. F. Taffaa)
A premia waa prepared and forwarded for Renovating Nlran Control Room
and Lunchroom. Deaign package waa forwardad for: Up-grading Fire Pro tection Syetem (AFE 3293 - $7.1 M).
Meaara. K. B. Davis and J. Harrison of the Alabama State Highway Depart ment viaited the plant on September 26, to diacuaa the relocation of Highway 202 acroaa Monaanto property. They presented two schemes for the connection of old Highway 202 to the new 202 on the southeest side of the plant.
POLLUTION CONTROL
E. G. Wright, (W. F. Taffaa)
Air & HgO Pollution
Community and
Complaints Governmental RelationsB - 2
TSD Objective
No air or water pollution complaints were received at the Anniston Plant during September.
P.C.B. in Choccolocco Creek
Pollution Abatement
TSD Objective F - _________
The first sat of samples taken from Choccolocco Creek ahow lavela of P.C.B, from 2 to 8 PPB. Theae levela will be checked at periodic inter vals beginning in October with another set of samples from the creek.
HC. Neutralization Pit
Production Aaaistance
TSD Objective ____L-LJt______
The pit continued to neutralize all of the acid sewered thia month. No un-neutralited HC1 has left the plant since August 8. The pit is showing no signs of reaching a break-through point at the present time. Plans are to continue to extensively monitor the pit until it has reached the break-through point.
Choccolocco Creek
TSD Objective
Wildlife StudiesPollution AbatementF - 4 __________
Requested Drs. Gunning and Suttkus to da another study of Choccolacca during the fall season. This study will prabably be conducted during lata Oetaber. Samples of the fish and other wildlife from the creek will be collected, frozen, apd sent to Organic Research for P.C.B. analysis. Thia will provide some base data far evaluating the magnitude of the P.C.B, problem in Choccolocco.
CQMPf My
TRAN 025176
WATER PCB-SD0000005845
Company confidential 10.
POLLUTION CONTROL - (continued)
Elmco Filter at
TSD Objective F - 4
Waste TreatmentProduction AssistanceTSO Job No. 808
Construction la 95X complete, Start-up la scheduled for the first or second week In October.
Watte Treatment
All wastes were effectively treated during September. High solids continue to be a problem. Successful operation of the Elmco filter should ellminste the problem. Average daily values for Monsanto1s effluent are as follows:
PNP COD Parathlon BOD
Average dailv 1.0 PPM
12J .17 PPM
k PPM
SDeclficatlons 5 PPM
<-200 PPM -=-1.0 PPM (max.)
-=200 PPM
COMPANY
CCNFiDENTVAL
TRAN 025177
WATER PCB-SD0000005846
)
PLANT LABORATORIES G. W. Miller
Company confidential 11.
PROCESS RESEARCH AND DEVELOPMENT J. T. Bell
Of the 105 PR&D mandaya available in September, 63 were expended on projects outlined in the 1969 PR&D Progrem. The use of the remaining mandaya vara divided among vacation, supervision, illness, and miscellaneous.
Blend Scavenger
Improved Aroclor
Refinement (Aroclor)Electrical PropertiesJ. L. Brown
Evaluation of Type 4A Molecular Sieve as an absorbent for column refinement of Aroclor-Scavenger mixes was begun on 9/24 with completion targeted for 10/15/69.
HB-40 Process Studies Variables
Determine Process
W, H. Howard
Equipment failure has temporarily suspended attempts to prepare HB-40 via a continuous process. This aspect of the study is to be continued on 10/3. The effect of quaterphenyl level on reaction times and catalyst requirements has been determined by a batch process. Santovax C has been hydrogenated to HB-40 with an extended reaction period.
Biphenyl Tubular Pilot Studies
Obtain Desired Biphenyl/Terphenvl Ratio
J. L, Brown
Plans for the Biphenyl Pilot Laboratory were completed on 9/9 and trans mitted to maintenance. The plans were Issued for bids on 9/10. A delay of 15 days caused by failure of contractors to bid promptly has been encountered with construction now targeted to begin on 10/15.
Low Color Aroclor 5460
Develop Alternate Process
G, L, Arnett
The distillation of Aroclor 5060 and 5460 over a combination of lime and NaOH is effective in reducing color. DTA studies indicate thermal atability of the combination of Aroclor 5060, NaOH, and 1ime up to 400*C. Samples have been forwarded to St. Louis for corrosion studies. A PR&D report is baing prapared.
Parathion Isomer
Reduction
__________________ Increased YieldsG. L, Arnett
This project has been delayed by illness but will resume by 10/6.
COMPANY CONFIDENTIAL
00MP A * ?*/
TRAN 025178
WATER PCB-SD0000005847
PLANT LABORATORIES -(Cont'd)
Company confidential 12.
PROCESS RESEARCH AND DEVELOPMENT -(Cont'd)
Farathlon Condensation Reaction StudiesIncreased Yields_____________________ I. Ransaw
The project work plan has been Interrupted to derive a method for
determining the actual 1 conversion In the condensation reaction. The
reliability of the method Is to be determined by 10/3 with the study, as written in the work plan, to resume on 10/6.
Acetone Recovery (ParathIon)
Reduce COD LoadG, L, Arnett
Sample analyses have been made to support a plant demonstration of increased acetone removal in the condensation step. This study has been terminated.
ANALYTICAL AND QUALITY CONTROL
S. 0. Kemp
Complaint Report
Quality Number
Material
Cus tomer
12-A-69 13-A-69 14-A-69
Aroclor 5460 HB-40 Aroclor 1268
Swift Addyston Plant Central Solvents
YTD Quality Complalnts/100 Shipments 0.24
Reason
Organic Hatter Color High Melt Point
Target 0,20
COMPANY
CONFIDENTIAL
COMPANY
TRAN 025179
WATER PCB-SD0000005848
Company confidential CCMflJNITY RELATIONS. PERSONNEL. RECRUITINC. AND DEVI
Community Relations
1. J . C. Landwehr, W. P. Taffee and E. G, Wright attended a talk by Dr. Roy Ledbetter, Alabama State Extension Entomologist, on the positive benefits of DDT at the September meeting of the Decatur, Ala. Kiwanis Club, September 11.
Personnel
1. Brode D, Morgan, BSEE from the University of Arkansas, reported to work on September 2 as Electrical-Instrument Engineer I.
2. Ralph Noel, D.O. student, Cobb High School, started to work in ED&S September 18, 1969.
3. G. L. Moore, Co-Op from Ga. Tech, has returned to school to complete studies to obtain degree in Chemical Engineering.
4. All members of TSD attended a seminar on Parathion Poisoning Symptoms conducted by Ishmeal Ransaw, September 16, 1969.
5. All members of TSD attended Job Holders meeting conducted by W. B. Papageorge, September 24, 1969.
Recruiting
1. Summer employes reported to school September 15: P. D. Kinnear te the University of Chlcage, H. L. Marcum to the University of Tennessee, J. L. Gaines to Auburn University, and A. I. Hale to the University of Mississippi.
Development
1. J. C. Lendwehr participated in Innovation Exchange Program at
Brldgevlev Plant (Chicago), September 25-26.
-
2. V. R. Haupt visited the Newport England Plant to assist with Biphenyl ,, problems, September 4-20.
3. G. L. Arnett held a seminar at the Luling Plant, Lu1ing, La., to train decontamination team, September 25.
Visitors
1. Bob McCutchan visited the laboratory September 17 concerning Aroclor.
2. W. A. Kuhn visited September 3-4 and was special guest at the seminar end berbecue for new employes.
3. George Hunt from S&PP section of CED visited the plant on September 30 concerning the electrical failure in the Aroclor department on September 27.
COMPANY CONFIDENTIAL TRAN 025180
WATER PCB-SD0000005849
)
PROCESS IMPROVEMENT
distribution of time by technical service
Jan. Feb. Mar. Apr. May June July Aug. Sept, Oct. Nov. Due.
NEW PRODUCTS
PUNT IMPROVEMENT
ASSIST OPERATION'S
SPECIAL ENGINEERING SERVICES
TECHNICAL MANPOWER
MISCELLANEOUS ACTIVITIES
AND ABSENCES
---- m. j--
i .......:l.1
Jan. Feb. March Apr. May
COMPANY CONFIDENTIAL
June
July
Aug. Sept. Oct. Nov. Doc. TRAN 025181
WATER PCB-SD0000005850
IN MAINTENANCE
FOR CONSTRUCTION
IN MAINTENANCE COMPLETED
NOT CLOSED
PROJKC1S SUBMITTED
FOR APPROVAL
3
ao uo,
V)
<g 600
tgo 500 H F5 400
^00
200
100
00
APPROVED PROJECTS IN TSD
W Wtilp * / VVlU4UUlib4Mt
TSD PROJECT SUMMARY
WATER PCB-SD0000005851
)
ANALYTICAL SAMPLES
laboratory administration
ANALYTICAL MANPOWER
Manpower/sample
$/Manhours
1 Total Plant
Operating Cost '
1.5
1.0 0.5
Overtime 7.
COMPANY
WATER PCB-SD0000005852