Cconoco)
Interoffice Communication
To Paul Morstead
From
R. A. Conrad
Date July 5, 1984
PROPOSED RESPONSIBILITIES - DOCK SERVICES TO SUPPORT VCM PLANT OPERATIONS
Per our discussion, Steve Reynolds has put together a proposed dock procedure for the VCM Plant operations. He has reviewed this in-
plant with operations, engineering, maintenance, safety and laboratory personnel. After you have had a chance to review the attached procedure
in-house with your people, let's have a limited meeting to discuss any needed clarifications, revisions, etc. During your review stages please feel free to contact Steve Reynolds, Joe Ware or myself for any needed information or clarification of what is meant or the basis for any item in the outline.
R. A. Conrad Plant Manager Conoco VCM
br cc: JWW-RB-SJR bcc: RTF-RWS
(conoco)
PROPOSED DRAFT COPY FOR REVIEW PURPOSES
Interoffice Communication
to R. A. Conrad From S. J. Reynolds
Date subject
July 2, 1984
PROPOSED RESPONSIBILITIES OF DOCK SERVICES TO SUPPORT VCM PLANT OPERATIONS
Attached is a list of functions that are currently performed to support the VCM Plant operations at the docks. As a result of the Conoco-Vista dock service agreement, the responsibility for many of these functions must shift from the VCM Plant to the Refinery. Included with the list of functions is a draft proposal of which company should be responsible for each function.
When the Vista buyout is final, Conoco will own all of the VCM Plant dock equipment. Therefore, arrangements must be made as to who is responsible for each function and in what form that responsibility will take. Such items include equipment maintenance, environmental reporting, dosimeter badge testing, etc.
It is recommended that after the Refinery reviews these functions and responsibilities, that a joint meeting of the Refinery and the VCM Plant be arranged to finalize these responsibilities.
If there are any questions, please contact me at ETN: 640-5127.
S. J. Reynolds Process Engineer
br cc: JWW-MLA(5)-MCM-JRH(4)-SRA-RB-PLF-DLD-MGH-RTF-RWS
CViH ooooo 3/53
PROPOSED RESPONSIBILITIES OF DOCK SERVICES TO SUPPORT VCM PLANT OPERATIONS
DOCK FUNCTION
1) VCM/EDC Loading & Venting Hoses a) Operation & Handling b) Testing of Hoses c) Hydraulic Boom: i) Owned by ii) Maintenance d) Repair & Replacement of Hoses
2) VCM Vent Recovery System: a) Owned and Operated by b) Maintenance
3) Carbon Bed Adsorption System: a) Operation b) Transportation/Regeneration
4) VCM Fixed Point Monitor System: a) Operation b) Maintenance c) Calibration of GC
5) Hydroquinone Injection: a) Injection Operation b) Hydroquinone Storage c) Proper Measurement for Each Tank
6) EDC Emissions Control System: a) Operation b) Maintenance c) Steam for N Heater
CWH 000005759
PRESENT RESPONSIBILITY
Refinery Docks VCM Plant VCM Plant VCM Plant VCM Plant
VCM Plant/Refinery Docks VCM Plant
Refinery Docks VCM Plant
Refinery Docks LCCP LCCP
Refinery Docks VCM Plant VCM Plant
Refinery Docks VCM Plant Refinery
PROPOSED RESPONSIBILITY
Refinery Docks Refinery Docks (1) Refinery Refinery (2) Refinery
Refinery Docks Refinery Docks (2)
Refinery Docks VCM Plant (3)
Refinery Docks Refinery Refinery
Refinery Docks VCM Plant VCM Plant
Refinery Docks Refinery Docks Refinery
DOCK FUNCTIONS
PRESENT RESPONSIBILITY
7) EDC Storage Tank, T-415:
a) Daily Gauging b) EDC Transfer Gauging c) N Purge Monitoring d) N2 Purge Maintenance e) EDC Sampling
Refinery Docks Refinery Docks Refinery Docks VCM Plant VCM Plant
8) EDC Transfer Pump, P-415 (VCM), P-677(Ref.)-
a) Operation b) Maintenance
Refinery Docks VCM Plant
9) Ship Inspection Before Purging
VCM Plant
10) Ship Purging:
a) Operation & Coordination Between Ship and N2 Truck
b) Ordering & Scheduling of N2 Trucks c) Oxygen Analysis After Purging
Refinery Docks
VCM Plant VCM Plant
ID Breathing Air Rack
a) Replacement Bottles Cost b) Maintenance
VCM Plant VCM Plant
12) VCM Ship Sampling
a) Sample Taking b) Sample Hose, Including Maintenance
VCM Plant VCM Plant
13) Information on Ship/Barge Movement & Coordination of Ship to Shore Communications:
a) Provided by b) Assisted by
Refinery Docks VCM Plant
14) VCM PI ant "Gang Box"
15) Spare Parts Warehousing: All equipment for VCM Plant Operations
VCM Plant VCM Plant
000005760 CU1-
PROPOSED RESPONSIBILITY
Refinery- Docks Refinery Docks Refinery Docks Refinery Docks Refinery Docks
Refinery Docks Refinery (2) VCM Plant
Refinery Docks VCM Plant VCM Plant
Refinery Refinery
VCM Plant Refinery Docks
Refinery Docks VCM Plant VCM Plant
Refinery
DOCK FUNCTIONS
PRESENT RESPONSIBILITY
PROPOSED RESPONSIBILITY
16) Environmental: a) Reporting b) Recordkeeping c) Monitoring
17) Employee Exposure Monitoring: a) Dosimeters Supplied By b) Dosimeters Transported to VCM Plant for Analysis cl Dosimeter Analysis d) Recordkeeping e) Semi-annual Physical (Including Costs)
18) Operating Manual Updates for USCG
19) Annual Relief Valve Testing
20) Annual Pressure Gauge Testing
21) Training: a) Safety b) Environmental c) Operations
22) VCM Filters: a) Filter Change-out b) Spare Filters Cost & Warehousing
VCM Plant VCM Plant VCM Plant
VCM Plant VCM Plant
VCM Plant Refinery VCM Plant
Refinery Docks
VCM Plant
VCM Plant
Refinery Docks VCM Plant VCM Plant/Refinery
VCM Plant VCM Plant
Refinery Refinery Refinery
Refinery Refinery
VCM Plant Refinery Refinery Docks
Refinery Docks
Refinery
Refinery
Refinery Refinery Refinery
Refinery Refinery
Notes 1) VCM Plant must be notified in writing of hydrotesting of VCM/EDC Dock loading hoses to ensure being dried before use. 2) All maintenance on equipment required for VCM Plant operations will be done by the Refinery. The VCM Plant reserves
the right to repair this equipment on an emergency basis. For Example: VCM compressor breaks down during ship loading and the Refinery can not get anyone out to repair in a reasonable amount of time. The VCM Plant must receive copies of all preventive maintenance logs kept an equipment required for VCM Plant operations. Preventive maintenance must
be done on a reasonable schedule. 3) Carbon bed regeneration will be certified by the VCM Plant and must be approved by the Refinery when completed.
CUH 000005761