TECHNICAL SERVICES DEPARTMENT
MONTHLY REPORT
. Summary
SEPTEMBER 1970 AROCLOR WASTES
CCNfrCESTTAI. Rssd and dastrsv
Currant Laval
Aroclor loaaaa during Septaatoar averaged 32/day (2600 ppfa). fluctuation at loaaaa occurred and vara eauaad byi
1. Tha old lisastone pic van overloaded with and discharged nolida containing PCS.
2. Oaa of datargant to claan the Aroclor departaant resulted in aaulsification and dacraaaad afficiancy of tha department sump.
3. Variabla severing of Muriatic Acid which, at
high rataa, cauaaa PO carrythroogh fro* old
liaaatoca pit.
.
.
4. Tha arm llnestoae pit not diacharging any PCS to tha plant effluent.
Alabama Watar Improvement Co--Liaalon Contacts
Contacts with MrZC Tachnical Staff vara mada to arranga to
diacuae program and raaulta. Illnaaa of staff aaobara and pzaaa of othar buainaaa pravantad thaix Mating with ua in Saptamhir. t*a ara aov able to inform thaai that tha nev liaaatoca pit van started up on SeptMber 23. To data tha PO laval in this pit affluent haa bean fro* 0-3 ppb on five 24-hour cnayoalta saaplae . (oorraaponding plant affluent was 90-240 ppb or 1.1-2. t #/day). Thia supports tha praalaa for iatari* action that Anniston's aajor discharge originstad in tha old limestone pit. Acid samples show that tha new pit has neutralirad 100% of tha ad which haa bean sent to tha pit.
OS* 013183 '
CCXW04MTUL. INSOtUAhOM
HARTOLDMON0034519
Soills
Cn* drum of Theminol Jail tram a fork lift and broke open. Approxi mately one gallon entered the sewer. The raac was absormed in the chat and was clan ad up.
Projects and Evaluations
The Pollution Job atatua raport ia attachad.
Data input for solid waatas containing PCS has baan completed. A report will ba published the first weak in October.
Preliminary evaluation for removing spent carbon from the HC1 carbon towers without draping into the sewer is in progress. Sawar relocation and sump ravia ions will ba required.
Feasibility of praping the limestone pit sludge will ba determined in October test. This will reduce cost of periodic pit cleanout.
AFE 3605 was forwarded for approval to contain/decrease Aroclor department process leaks ($15,300 capital and $6,850 expense).
A test aJcinoar was installed in the Aroclor sump and has operated success fully in removing the built-up ecus floating in the awp.