Document GmBNNvb2Ba4KR9Xgz4qkRVpOx

Monsanto FROM (NAME ft L OCATION) W. G. Krummrich Plan DATE April 23, 1969 SUBJECT REFERENCE TO 1ST QUARTER STATUS - 1969 AROCLOR GROUP OBJECTIVES ___________ Aroclor Group Objectives - 1969 Mr. J. W. Molloy I. SAFETY <r Pj^>^ ..Messrs-,--BrnTT^Armstrong V. Brawley B. Eden D. Fitzgerald T. E. Greenman C. M. Hamlet . D. W. Jackson W. A. Kuhn - G.0 R. M. McCutchan A. Objectives 1st Quarter Status 1. No serious injuries for Dept. 246 and Maintenance personnel in 246 area. 0 . 2. No disabling injuries for Dept. 246 and Maintenance personnel in 246 area. 0. 3. 1.0 minor injury per man per year 4 minor injuries = for Dept. 246 personnel. . 0.68 minor injuries/man ; year. 4. Ten minor injuries per year for all Maintenance personnel' while in Dept. 246. ., _ 1 minor injury Actions ' ' EDC 1st Quarter Status 1. Evaluate need for fume removal system on con tinuous chldrinators. . VI Complete. Need exists fpr #9 chlor. and sample shed. Premise to be issued,by 5/15/69 2. Develop safety device and . 2/1 interlock system inspection frequency for new plant. No work. 5- Use Inspection frequency 4/1 developed for batch plant. No work. 4. Review grounding of equip 4/1 ment. a. List equipment to be . grounded. ; . 2/1 Complete. b. Implement grounding. - 4/1 To be done by Paul Newman DSW 329527 STLCOPCB4076169 1st Qtr. Status Aroclor Group Obj. -2 - . ' 4/23/69 B. Actions (Continued) EDC 1st Quarter Status 5. Establish equipment / preventive maintenance procedure. 10/1 In progress by Mainte nance Engineering. 6. Upgrade lighting. 3/1 Installation is 50$ complete. 7. |8- 9- Extend elevator to 29 ft. level. Widen walkway around fume blower. Remove unused, corroded steelwork on drum lean-to. 3/1 3/1 2/1 No work. Scheduled for 2nd Quarter. No work. Scheduled for 2nd Quarter. Complete. 10. Evaluate lime addition facilities. 1/15 Complete. 1 port has been altered & success fully demonstrated. 3 other ports will be altered. EDC 5/15/69* 11. Update Dept, safety audit. 2/1 12. Evaluate upgrading of drum 3/1 lean-to. Complete. Review held 4/17/69. No work. New EDC 7/1 15. Modify tank-truck loading ramp. II. QUALITY 3/1 Complete. 1 A. Objectives 1st Quarter Status 1. .. . ... . Meet corporate quality goals Goals Actual 1242 1254 1242 1254 a. Resistivity (109 OHM-CM) b. Power Factor ($) c. TCC (ppm) ' 10,000 15,000 0.6 0.3 40.1 ---- 3,660 0.14 0.15 16,340 O.O96 0.64 2. Produce Aroclors,which are indis - Successfully demonstrate tinguishable from a customer's standpoint.from Anniston Aroclors'. . 3. Customer complaints: <0.3/100 shipments 1/635 shipment = 0.16/100 DSW 329528 STLCOPCB4076170 1st Qtr. Status Aroclor Group Ob j. -3 - ' 4/25/69 B. Actions EDC ; l/ Install & use the Organic 2/15 ' // Research instrument for measuring electrical properties. 2. Investigate specification revision for A13B3B and 1260PPO. 6/1 1 5| i Determine reasons for and correct discrepancies between lab analysis and in-line instrument indications of electrical properties. Vi . 4. Determine and match Anniston's analysis 4/1 (especially GLC) to assure product continuity between plants. 5. Demonstrate Anniston's process conditions in continuous plant. ; - . 2/1 6. Evaluate Hooker shutdown 2/1 on quality. . . 7. Demonstrate Iodine, co- 4/1 catalyst in continuous chlorinators. `. 8. Define "Aging" effect on 2/i quality. . . 9. Define effect of Porocel 5/1 treatment'. .. '. 10. Define quality effects of storage retention. 6/1 . 11. Define quality degradation 6/1 during loading.- . 12. Provide nitrogen blanket on 8/1 blend .and finished product tanks... - 1st Quarter Status Complete. No work. Work is continuing. Complete. Products are compatible. Not as yet approved by Business Group. Complete. See Report # 91370:4023-1. Approved by M. Kuhn 4/14. EDC 5/15/69. Complete. No effect on TCC's. Continuing. DSW 329529 STLCOPCB4076171 1st Qtr. Status Aroclor Group Obj. -4 - 4/23/69 III. CAPACITY A. Objectives 1. Meet 1969 Sales Forecast of' 60 M lbs. Aroclors and 21 M lbs. Aroclor blends. B. Actions 1. Install spare pump for #2 still. EDC Vi 2. Install new type* seals in all problem pumps. . 9/1 3. Determine proper blend compositions utilizing Brodimatic Meters. 4/1 4. Revise Aroclor-process improvement plan. 4/1 5- Evaluate necessity for 4/1 increased Aroclor storage ' capacity. 6. Demonstrate maximum capa- , 2/1 city of blends in expanded blend facilities. 7. Evaluate necessity for increased Pydraul storage ' capacity. 3/1 *8. Evaluate manufacture of 1 M lbs/yr of lower pour point material. 4/15 *9. Determine maximum capacities of all units. 6/1 *10. Insulate #7 storage and . #2 mix tanks. ` ' 7/1 1st Quarter Status All sales requirements were met. _ Aroclors - 10.75 M lbs. Blends - 4.52 M lbs. 1st Quarter Status . * Pump is here, waiting for project group to install. Continuing. Re-issue as MIP. EDC 6/1. No work. #3 Mix Tank & TTCB storage tank were successfully demonstrate Complete. Increased capacity is needed. * Actions were added at end of 1st Quarter. 0S\N 329530 STLCOPCB4076172 j 1st Qtr. Status Aroclor Group Obj. -5 - IV. COST A. Objectives ! 1. No negative variance from 1969 cost standard. 2. Mechanical expense not to exceed 1969 budget. B. Actions ^ EDC 1. Overtime for Dept. 246 personnel - 8$. ' 2. Absenteeism for Dept. 246 - 3$ 3. Change nitrogen standard cost from plant average ($0,375/100 SCF) to actual liq. N2 price ($0,187/100 SCF) 4. Determine maximum water 2/1 content in steel-HCl systems to avoid corrosion. -5. Revise item no. flow sheets.3/1 V,. YIELD A. Objectives . 1. Maintain the following yields on all raw materials: a. Biphenyl b. TCB c. TTCB 98$ 98$ 98$ ' B. Actions ` EDC 1. Evaluate blends yields based on results-of specification study. 6/1 2. Obtain credit for Montar production. 6/1 3. Establish Porocel Usage V23/69 1st Quarter Status Positive $31,500 Positive $18,000 1st Quarter Status O.T. - 10i3$ 6.5$ Complete. No work. New EDC 6/1. Complete. - 1st Quarter Status . 99.2i$ YTD 98.96$ YTD 95.51$ YTD 1st Quarter Status No work.^ No work. Still operating on 1st Porocel charge. . Ds\N 329531 STLCOPCB4076173 1st Qtr. Status Aroclor Group Obj. -6 - 4/23/69 B. Actions (Continued) EDC 1st Quarter Status 4. , Rework all off-gas condensate. Completed. 7500 gal. condensate were re covered. VI. PROCESS CONTROL A. Objectives 1. Improve operational control of process. / . B. Actions EDC 1st Quarter Status 1. Install level recorder on #2 Still. ' 4/1 Complete, 2. Establish still boil-down 3/1 Work in progress, and re-lime frequency. New EDC 6/1. 3. Modify blending procedure 6/l dependent on specification study. ; 4. Install high temperature shutdown system. . 4/1 Complete, 5- Evaluate separate chlorine 2/1 revaporization system. Complete. . 6. Use in-line analyzer to measure power factor. 2/1 Complete, 7- Prepare new operating instructions.A 8. Prepare new process description. } Awaiting process T control study. 9. Identify key process variables I .. and initiate control charts. --/ 10. Complete IFO's a. . New Plant b. Old Plant 2/1 Complete 8/1 99% Complete. EDC 5/1 11. Install level indicators 4/1 Complete, on finished goods tanks. 0S\N 329532 STLCOPCB4076174 t 1st Qtr. Status Aroclor Group Obj. -7 - B. Actions (Continued) 12. Install rupture disk / detectors on absorbers 4/23/69 EDC 7/1 1st Quarter Status C? \) P. V. Verna Technical Services Department /tm DSW 329533 STLCOPCB4076175