Document Gm8ZVDJdpeybg3DbxBQzMkyMr
PACIFIC OA.S uAjSTO
XuSOTF^IO COMPANY
UPCGt^-IS
--f~
356- E. AlISAL STREET
0. SOX 1171 SALINAS. CALIFORNIA 93301 * 1408) 422-8322
VV,, _ . M O ^ ^ A Y
OlViiiO-N ***haGEX`
December 12, 1975
Dear Interruptible Gas Customer;
'
On December 2, 1975, by Decision No. 85189, the Cal i forni a Publ i c Lit i 1 i ti es
Commission has ordered that; " California gas utilities shall not provide service to new or additional service to customers wherein the customer's new requirement will be in excess of 50 Mcf/day and that requirement can be met with an alternate fuel." and "Commission approval will be required before a gas utility can (1) provide service to any new non-residential customer with a demand of 50 Mcf/day and (2) install additional facilities to provide additional service to 5 nonresidential customer wherein the new level of service is in excess of 50 Mcf/day."
The Commission's decision modifies the provisions of PGandE's Gas Rule 19 that heretofore focused on 200 Mcf/day for non-residential customers as a dividing line.
Further in the decision, the Commission established five priority classes, noting
that the Federal Power Commission had adopted an end-use curtailment plan for
1 Paso Natural Gas Company, one of California's major suppliers of natural gas,
and that the California Legislature had added to the Public Utilities Code sections
requiring the PUC to establish a system of priorities among categories in desending
order, starting with those which "provide the most important public benefits and
serve the greatest need."
-
Appendix "3" of the Commissi on's decision is attached which describes the new end-use priorities.
The now priorities will not affect your operation until May. 31,. 1976,
-Following are the approximate forecast of levels of gas service for this curtailment
year under the old system and for the 1976-77 through 1977-78 curtailment years under
the new end-use priorities;
y.
1975- 76 Curtailment Year
(Gas Supp1ies Forecast)
Curtailment
Group Numbers,
5975-76
2. 76%
3 3/% 4 37%
5 99^%
1976-78 Curtailment Years
(Exhibit 203 of the C?UC Staff
In Case 9642). Priorities
1976-77
1 1GC%
2A 100%
28 100%
3 90-95% 4 70-85%
1977-78 i 00% 100% 100%
80-90% 60-70%
UCC 009337
In ter pup11b1e Gas December 12, 1975 Page 2
These numbers are subject to adjustment and the same general qualifications as previous data you received (average year, maintenance of existing supplies, etc,}
As a result of this decision, many changes In our tariffs and policies will be required
Energy Conservation Is extremely Important! Postive conservation efforts will enable us to supply your future energy requirements. Lets get together to discuss ways you can make your operation more efficient to save energy and reduce your energy costs. Please call me at 422 8322 for an appointment.
AKS/sw Enclosures
Industrial Power Engineer
v
UCC 009338
ATTACHMENT 1
C.95QI et al. Itc
' INTERIM ORDER
IT IS ORDERED that:
.
1. A- system of end-use priorities for statewide allocation of
natural gas based on the criteria set forth In Appendix 3 of this
decision is hereby adopted on an interim basis pending resolution of
any environmental impact issues. Tariff schedules reflecting the
end-use priorities established herein shall be riled by the respondent
utilities in accordance with General Order No. 96-A to become
effective within one hundred and eighty days from the effective date
of this order. 2. Southern California Gas Company (SoCal)Pacific Gas and
.
Electric Company (PG&E), and San Diego Gas & Electric Company (SDG&5) shall maintain data and report to the Commission quarterly on the
number of customers and consumption of nonresidential customers with
peak-day demands between 50-100 Mcf/d.
3. California gas utilities shall not provide service to new
customers, or additional service to current customers, when the
customer's new requirement will be in excess of 50 Mcf/d and that
requirement can be met with an alternate fuel.
4. Commission approval will be required before a gas utility
can (1) provide service to any new nonresidential customer with a
demand in excess of 50 Mcf/d and (2) install additional facilities to
provide additional service to a nonresidential customer when the new
level of demand is in excess of 50Mcf/d.
5. SoCal, PG&E, and SDC&E, shall file with the Commission
within one, hundred and twenty days after the effective date of this
order lists o* f customers falling; into, the categories of priority 2-A and priority 2-3 permanent, and priority 2-A and Priority 2-B temporary.
-30UCC 009339
C.,9581 et a 1. ltc
6. PG&E and SoCal. shall expand their mutual assistance
agreement cr negotiate a separate agreement to protect deliveries
to Priority 1 and priority 2 customers on a statewide basis.
7. PG&E, SDG&E, and Southern California Edison Company (Edison)
shall submit to the Commission within one hundred and eighty days
from the effective date of this order a detailed estimate of the
cost of converting igniter, start-up, and flame stabilization fuel
requirements and a detailed analysis of the quantities used for
these purposes. 8. PG&E, SDG&E, and Edison shall initiate a program designed
to convert to an alternate fuel the natural gas now used for igniter.
Start-up, and flame stabilization purposes.
9; Uses not exceeding 25 Mcf/d on a peakday may be in the
next higher priority where such use is a part of a multi- or split-
priority customer s total use.
10> PG&E, SDG&E, Edison., and SoCal.. shall report every six
months on. present and future plans relative to conservation. The
first such report is to be filed no later than December 30, 1975.
11. PG&E, SDG&E, Edison, and. SoCal shall file quarterly a
detailed analysis of:
a. Expenditures for the immediate past six months for conservation and expenditure forecasts.
b, Conservation activities and results with - present interruptible and steam-electric customers.
.
- jiUCC 009340
C.S581 et al, Itc
c. Conservation activities and results with
all other customer classes.
.
d. Insulation activities.
e. Customer information regarding energy conservation.
12. The authorization in Decision No. 83923 for certain petro
chemical companies to transfer to C Block priority is hereby extended
until the end-use priorities authorized herein become effective.
The effective date ox this order is the date hereof.
Dated at _____ San Francisco, California, this 2nd
day of December, 1975.
I will file a concurrence.
}sl LEONARD ROSS _ Commissioner
I will file a concurrence.
/s/ ROBERT BATINOVrCH Commissioner
D. W. HOLMES____________ ' president
WILLIAM SYMONS, JR._________
VERNON L. STURGEON__________
LEONARD ROSS___________________
ROBERT BATINOVICH____________ Commissioners
-32UCC 009341
C. 9531 at al. l.tc
APPENDIX 3 Page 1 of 4
End-tjse Curtailment
1. The following will establish an end-use priority system to replace the existing price-volume priorities under which^ the gas distribution utilities presently curtail deliveries
of natural gas.
2. The criteria for categorizing the uses of natural gas of the customers of record as of the effective date of this decision
is as follows:
.
Priority
Description
1 All residential use regardless of size.
All other firm use with peak-day demands less than 100 Mcf/d.
2-A
Where primary use is as a feedstock with
no alternative.
_
Current firm nonresidential use with peakday demands greater than 99 Mcf/d: .
Where conversion to alternate fuel is not feasible.
Where conversion to alternate fuel
is feasible.
-
.
Electric utilities start-up and igniter fuel.
2-B Current interruptible customers with LEG or
other gaseous fuel standby facilities:
...
Where conversion to alternate fuel is not feasible.
Where conversion to alternate fuel
is feasible.
Other interruptible customers with CPUC-approved deviation from.requirements for standby facilities.
3 All use noc included in another priority.
Industrial boiler fuel where capability of utilizing an alternate fuel is present.
Cement plants.
5 Utility, steam-electric generation plants and utility gas turbines.
UCC 009342
C.9581 et al. Inc
. APPENDIX B Page 2 of 4
The following definitions are to be associated with the criteria
Alternate fuels: '
Nongaseous fuels; particularly excluding SNG, LNG, and LPG.
Boiler fuel: .
Gas used specifically to fire_ boilers, regardless of the end use of the steam produced.
Feasible alternate fuel: *
.
The condition of a customer who currently has no capability of
using an alternate fuel (as defined above), but where conversion to alternate fuel is technologically possible and economically practicable, within the context of the customer '
in question.
Feedstock usage:
Natural gas used as raw material for its chemical properties in creating an end product.
Firm customers:
Customers currently purchasing gas under firm natural gas service
schedules.
Interruptible customers: Peak-day demand:
Customers currently purchasing gas -under interruptible natural gas tariff schedules.
A customer's highest month's require ment divided by the number of days of operation in that month.
Residential use: Industrial use:
Service to customers which consists of direct natural gas usage in a residential dwelling for space
heating, air conditioning, cooking, ' water heating, and other residential.
* uses.
Service to customers engaged primarily
in a process which creates or changes
raw or unfinished materials into
another form or product.
*
Note:
Industrial use is further defined as uses in the categories failing under Division 3, Mining, Division C, Construction,, and Division D, Manufacturing in the Standard Industrial Classi fication. Manual issued, by ' the Executive Office of the President, Office of Management and Budget.
UCC 009343
L-.93G1 et al. Itc
APPENDIX B Page 3 of 4
Process Gas:
Use for which alternate fuels.are not technically feasible such as in applications requiring precise temperature controls and precise
flame characteristics.
Electric utilit ss start-
up and igniter uel;
Electric utility natural gas use*
where no alternate fuel capability
exists for; (1) heating the boiler
system adequately during start-up
to enable efficient oil burning to
meet pollution standards; and
(2) insuring continuous ignition
and flame stabilization within the
boiler.
UCC 009344
TZ'.iZZl et al. Itc
AFFaI'DIZ 2t Fo.;';c 4 of 4
GAS PRIORITY CRITERIA Transfers To To t\`$r P rio ri t ids