ORGANIC PRODUCTION AND MATERIAL HANDLING DEPARTMENTS LONG TERM OBJECTIVES AND 1966 GOALS AND ACTION
December 28, 1965
LONG TERM OBJECTIVES
A. Establish,, maintain, and supervise procedures and policies to insure the safety of personnel and property.
B. Maintain and improve the production, and on-time delivery of uniform quality products within competitive specification.
C. To achieve by direct supervision, planning, and process control, the minimum short range costs.
D. To generate, assist in development, and implementation of process improvements to achieve long term minimum costs.
E. Effectively train and utilize all personnel to effect long term minimum costs, and provide for growth of facilities.
1966 GOALS AND ACTION?
A. Establish, maintain, and supervise procedures and policies to insure the safety of personnel and property,
1. Operate with no lost time accidents, no near-miss accidents, and achieve a serious injury index of less than 9.0.
2. Complete a minimum of 20 significant safety improvements during the year.
3. Conduct Bi-annual safety audit on all operations and facilities.
4. Safety awareness, and training to be constantly improved by monthly departmental meetings and day-by-day contacts.
5. Safety and Housekeeping inspection to be conducted by superinten dent with responsible foreman and/or supervisor. Housekeeping level to be :to satisfaction of Plant Manager. Responsibility Superintendent
B. Maintain and improve the production, and on-time delivery of uniform quality products within competitive specification.
1. Achieve average quality Sfcqre of 97.0 and R.F.T. Index of 98.0.
2. Achieve a quality complaint index of 2.5 per 100 M pounds pro duction, or no more than 4 justifiable complaints.
DSW 551800
STLCOPCB4090217
1966 Goals and Action (Continued)
2
3, Achieve a service complaint index of 4.0 per 100 M pounds of production, or no mor,e than 8 justifiable complaints,
4, Attain a minimum of 4 significant product quality improvements,
and 2 service improvements.
:
5, Achieve 98% on-time shipments.
C, To achieve by direct supervision, planning, and process control, the minimum short range costs.
1. Generate raw material savings of $133,400 from 1965 practices by obtaining the following yield improvements:
Material Biphenyl Group
1965 Actual
1966 Target
Targeted Dollar Savings
Benzene (% of theory)
99.76
99.00
$12,600*
Isopropanol
0.727
0
17, 600
Acetone
0. 189
0. 650
7,200*
Santowax C (S.R.)
119.0
116.5
7,400
Raney Nickel
0.057
0.05
1, 000
Santowax R
102.5
101.5
2,800
$ 9, 000
Aroclor Group
Biphenyl (% of theory) HC1 Credit (L. A.)
95.5 37.2
97.0 49.0
$14,200 59, 000
Santowax R (% of theory) HC1 Credit (S.A.)
85.5 70.4
87.0 75.5
2, 300 5, 400
Limestone
64.6
40.0
4, 600
Anhydrous HC1
117.65
116.0
4,700
^Targeted Losses
. $90, 200
DSW 551801 STLCOPCB4090218
1966 Goals and Action (Continued)
Material PNP Group
1965 Actual
KC1
142.44
PNCB
117.37
NaOH
74. 97
1966 Target
140.00 116.5
73. 0
3.
Targeted Dollar Savings
$ 11,100 15, 500 7, 600
$ 34,200
$ 133,400
2, Labor utilization (hrs/cwt. ) to be improved to achieve the following:
Product
1965 Actual
1966 Target
Biphenyl Santowax R HB-40 Liquid Arodors Solid Aroclors Muriatic Acid Cl2 - NaOH KOH PNP
0, 067 0.09 0. 151 0. 062 0.202 0. 034 0.046 0. 062 0.164
0. 063 0. 085 0. 140 0. 058 0. 170 0. 031 0. 044 0. 060 0. 130
3. Improve variable direct manufacturing costs other than labor at a
rate at least equal to volume increases.
.
4. Reduce process downtime to less than 1.5% and other down time to less than 2.0%. Process downtime to be improved by elimination of pluggage, and bottlenecking problems; other downtime to be improved by better scheduling, and develop ment of surge capacity between departments.
5. Actively generate, and assist in the development of specific cost reduction items to achieve savings of $420 M in 1966.
6. Improve material handling costs at least equal to rate of volume increases.
DSVJ 551802
STLCOPCB4090219
1966 Goals and Action (Continued)
4
D. To generate, assist in development, and implementation of process improvements to achieve long term minimum costs.
1. Assist in development of scope, and provide liaison for Ware housing Facilities.
2. Assist in development of scope, and provide liaison for modernization of Aroclor-Biphenyl-HB-40 finished goods handling.
3. Provide production liaison for Biphenyl Still Project, and have start-up plans completed by 11/1/66, Achieve design premises by 1/1/67.
4. Complete start-up of silicon diodes rectifiers in Chlorine Plant, and achieve design premises 45 days of completion of construct ion.
5. Establish and supervise effective process control of Chlorine facilities by 6/1/66,,
6. Evaluate and implement improvements to Aroclor treatment, and filtration facilities. Scope developed by 6/1/66,
7. Audit all reports and records for possible simplification, or elimination by 10/1/66.
8. Develop measurements and controls for "Work to Assist" and "Plant Improvement" costs by 5/1/66.
9. Generate a minimum of 3 significant increases in production capabilities.
10. Actively assist, and provide process control and information on terphenyl recycle research program.
11. Develop program for upgrading of HB-40 facility - Project for dismantling by 2/1/66, Autoclave Project by 4/1/66.,
DSW 551803 STLCOPCB4090220
1966 Goals and Action (Continued)
5.
E. Effectively train and utilize all personnel to effect long term minimum costs, and provide for growth of facilities,
1. Complete F.L.I.T. training all personnel by 6/1/66.
2. Continue development of Process Function Outlines. All department PFO's, and operator training to be completed by 1/1/67.
3. Devise next phase in Operator Training Program by 10/1/66.
4. All Operating Instructions, and Standard Manufacturing Processes to be current by 10/1/66.
5. Develop more objective Position Guides for all personnel. Guides to be keyed to objectives, and Position Specification by 3/1/66.
6. Conduct at least 2 Supervisory Training Meetings during the year.
f oSlN