Document Gj5Z67e8VbzqrbJa5Kq0Mx44

PROGRESS REPORT JOB NO. REPORT NO. r technical services dept. - w. q. krummrich plant 34li_4ll9 ______ (2). W.O. KRUMMRICH PLANT RESEARCH GENERAL OFFICE * 0. D. Dressed R, McCutchan G.O, J. E. Smith D. Malone '^3 a a. E. Leisy gj Sir. w. DALTON F. Elliott D, Woods T. Greenman tJ J. 0. Bright *C3d. danna W.R. Richard D. E. Cayard Qc. E. ANAGNOSTOPOULOS P. W. EDWARDS Bj. W. Molloy `tei G. Vincent ai P. B. Hodges R. E. Howard OTHERS J. rT" Savag< NlTftO * w. ft. KCLLOOO ANNISTON J .C. Landweh So. 2nd St. *Op.O. DeGarmc SG. L. Bratsch M D. Armstrong ^ M, Batz-CED D. J. O'Toole ts^ E. Billen J.Sraith/W. V. Jackson (2 Parker- WGK A. HEININOER 0 D. D. HOSMER H. C. Carder Patrick * J.F. Quinn 0 S. Tucker 0 L. W. SprandelD W. Kuhn-G.O. n. L. SAMPLE B, Williams 0 R, Stratmeyei) TO RECEIVE DETAIL SECTION TITLE: WATER POLLUTION: AROCLOR CONTROL personnel: m. Pierle (C. F, Buckley) PROBLEM: Report status of measurement and control work. The analytical results on wastewater samples indicate that total plant aroclor losses equal 700#/day. Additional samples are being taken to verify the above number and to determine the major source of losses. Additional possible sources of aroclor not discussed in Report 1 are rip track car washings. Department 248 therminol system. Department 246 HC1 off-gas purification by activated carbon (218) and acid scrubbing (217), and maintenance of electrical transformers. The sampling program has been expanded to cover these sources. The overall sampling program is now directed to determine: 1, Aroclor losses from Department 246, 2, % aroclor removal at waste treatment plant, 3, Aroclor losses to the Mississippi River, 4, Contamination extent of Mississippi River bank. /br Michael Pierle Technical Services Dept, DSW 258023 COMPANY CONPlDENTIAL INFORMATION This document is the property of Monsanto Company and the recipient la responsible for its safekeeping and disposition. It contains confiden tial information of Monsanto Company which must not be reproduced, revealed to unauthorized persons or sent outside the company without proper authorization. Either retain in secure files or destroy. FpHM WOK SOO REV-2/66 STLCOPCB4061735 91341:4119(2) -1- December 11, 1969 SCOPE This report details the work and progress accomplished in aroclor control since September, 1969. Analytical data and sampling modifications are included. STATUS A. Analytical Results The analytical results of initial samples were received from Scott Tucker on 11/24/69. A copy of the results is included in the Appendix. The results indicate that the influent to the Sauget Village treatment plant (Log. No. 16, 17, 19, 21, 95, 98, 100, 102) contained an average of 700#/day aroclor. Samples (Log. No. 14, 15, 18, 19, 20, 96, 97, 99, 101) taken downstream of the aroclor manufacturing department (Dept. 246] contained an average of 4#/day aroclor. These results would indicate that the aroclor is not coming from Dept. 246. However, sample No. 19 indicates that the aroclor is being concentrated in the light oils present in the sewers. Therefore, it is possible that either the department samples contained only the aroclor in solution or in water emulsion or the aroclor. losses are originating elsewhere than at Dept. 246. The sampling program must be altered to determine the actual losses from Dept. 246. B. Additional Sources Sources of aroclor not enumerated in Report 1 are as follows: 1. Rip Track - Aroclor tank cars are washed at the rip track. Some cars are equipped with bottom plugs instead of bottom valves. Thus, when the plugs are removed, aroclor can drain to the sewer until the cleaning equipment is attached and the bottom hole is plugged. 2. Electrical Transformers - Leaks or system change out. 3. Dept. 218 Carbon - The activated carbon used to purify HC1 off gas from Dept, 246 is sewered. 4. Dept. 217 Acid Scrubber - Dept. 246 off-gas when used in Dept. 217 is scrubbed with chlorosulfonic acid. The scrubber liquor is sewered. 5. Dept. 248 will use an aroclor furnace in their expansion. C. Control Measures 1. Rip Track - The procedure for cleaning tank cars is as follows: a. Heat contents and blow to waste receiving tank. b. Attach cleaning equipment to bottom valve or plug. DSW 258024 STLCOPCB4061736 913*1:4119(2) -2- December 12, 1969 c. Transfer all wash and rinse material to waste receiving tank. d. Haul contents of waste receiving tank to landfill. This procedure eliminates losses from tank car cleaning except for attaching equipment to bottom plug. Drainage from plug occurs only if contents are not,completely removed by Step(a) above. 2. Electrical Transformers a. During maintenance, pyranols are drummed off either for re-use or disposal in the landfill. b. Leaks, if present, are not at this time controllable and justification does not exist at this time to dike existing transformers. 3. Dept. 246 - Approval has been received to proceed with part of the settling basin project to entrap aroclor and remove it from the sewer at the department. D. Sampling Locations The sampling program has been modified as follows: 1. Grab Samples a. Village treatment plant oil scum and sludge to determine if aroclor is removed in either of these layers. b. Activated carbon sample from Dept. 218 to determine amount adsorbed from 246 HC1 gas. c. C/S acid scrubber liquor to determine amount of aroclor re moved by scrubbing 246 gas. d. Mud samples from Mississippi River bank as per Report 1. e. Free aroclor in Dept. 246 trench sewers is pumped to receiver and measured. Overflow gates were installed in each trench sewer so that the free aroclor could be retained and removed. The information gathered by this work should be useful in designing the settling basin project. (Section B-3) f. Mississippi River water sample from Monsanto loading dock. All composite samples will be representative of 24 hour samples. If analytical results are high from any of the sources, the sampling frequency will be increased from approximately one sample/week to what ever is dictated by the results. S, Tucker's suggestions as to sampling are appreciated and will be incorporated into the program. DSW 258025 STLCOPCB4061737 91341:4119(2) -3- December 11, 1969 2. Composite Samples a. Influent to treatment plant. b. Effluent from treatment plant. c. Effluent from all Department 246 sewers. Conclusions 1. Initial analytical results indicate that 700#/day aroclor is lost to the sewer. This is in excess of previous predictions. (Report 1) 2. Additional possible sources of aroclor are the Rip Track, Dept. 246 off-gas purification. Dept. 248, and maintenance of elec trical transformers. Future Work 1. Measure losses from Dept. 246. 2. Determine % removal of aroclor by waste treatment plant. 3. Report upon analysis of samples from Mississippi River bank. 9^AuI /br Michael Pierle Technical Services Dept. DSW 258026 STLCOPCB4061738 APPENDIX DSW 258027 STLCOPCB4061739 OR Log No. 14 WGK 15 WGK 16 WGK 17 WGK 18 WGK 19 WGK .19 WGK 20 WGK 21 WGK 95 WGK . 96 WGK 97 WGK 98 WGK 99 WGK 100 WGK 101 WGK 102 WGK * '. -5- RESULTS WGK. WATER SAMPLES Sample Identification Date Taken Amount Found (Reported As ppm Aroclor 1242 Except Where . Noted) 24N, #1, Sewer 24N, #2, Sewer SVO, #1 , Sewer SVO,#2, Sewer 24N, #1 MVO, #1 MVO, #1, Oil Layer 24N, #2 MVO, #2 MVO 24N 24N SVO 24N MVO 24N MVO 7/69 7/69 ' 0.05 1 .40 , OS' / 90 7/69 . *> 7/69 7/18/69 1 .87 -/. S 7 7/18/69 7/18/69 7/15/69 7/15/69 0.17% 1 .71 fcvCTP * ? / 7 / 10/2/69 -10/7/69 9/25/69 -9/30/69 10/2/69 -10/7/69 9/25/69 -9/30/69 7/28/69 -8/3/69 7/28/69 -8/3/69 7/21/69 7/21/69 (o X. 0.20 0.45 4 to'risr' 1* ,l -u 0.04 ^ 0.03 stSPS3 75-3 . - 77. 2.7 * T-^cd! 2*\ ix. (-Z. o *-1 0 .a ? p^ 9.2 V 4^ =.4- . DSW 258028 STLCOPCB4061740