Document GV18y5Gm31QyvqaLZ3Kj7YZn

uc ms-z INTEUfiAL CORRESPONDENCE! LINDE DIVISION SPEEDWAY fACTOHY 4801 WEST 16th STREET, SPEEDWAY, INDIANAPOLIS, INDIANA 46224 To (Name) Division Location Copy to Mr. T. J. Kroh UCC; Linde Division Speedway Factory Date Originating Dept. September 17, 1974 Acetylene Cylinders Mr. J. Mr. F. Mr. H. Mr. K. Mr. C. Mr. D. i-Mi'T'""L. Mr. D, Mr. R. Mr. R. Mr. L. Dr. J. Mr. R. E. Bertrand E. Camic C. Dellinger Earl E. Frankenberger Jenkins J. LaFrance P. Maurer M. Neary Oldford G. Suelter J. Welsh/Dr. K. S. P. Wooldridge Lane Answsiing letter date Subject ASBESTOS Attached is Mr. LaFrance's letter of August 23, which summarizes the results of his recent air sample analysis in the acetylene cylinder manufacturing area. As you can see, the present equipment and process procedures are capable of maintaining dust particle limits below the July 1, 1976 OSHA regulations if the equipment operates properly. One of the keys to safe operating conditions is continuous operation of the exhaust blower on the asbestos shredder. This blower has not yet demonstrated a high level of reliability, and even if it had, it is conceivable that dust build-up in the lines or in the asbestos dust collector could make it ineffective. Continued use of the mixing equipment when the blower is inoperative or in effective will rapidly generate a hazardous level of asbestos dust in the shredder room. / In order to circumvent this situation, I would like for you to install an audi ble alarm system which will sound at the fill station when the pressure in the exhaust blower inlet duct reaches atmospheric pressure. I would suggest that you also maintain a replacement unit which can be quickly installed when the unit becomes inoperative. If this proves to be effective, it appears that we can maintain low levels of dust throughout the building without the need to install expensive central dust collection equipment. Please let me know when you can have the system modified and advise Mr. Camic so that he can instruct his supervisors and operators of the safety alarm. HLP:gh Attachment UCC 011737 ,j t**'. a. t 1 i 'll'rERNAL CORRESPONDED UNION CARBIDE CORPORATION To (Nome) Division Location Floor Numlfisi Copy to Mr. C. Frankenberger Linde Division Speedway Factory 4301 West 16th Street Indianapolis, Indiana 46224 Dote Originating Dept. Flaar Number Answering letter i Mr. J. E. Bertrand Mr. K. Earl Subject Mr. D. Jenkins Mr. R. M, Neary Mr. R,, Oldford / Mr. H, L, Phillips ^ Mr. L. G. Suelter Dr. J. J. Welsh/Dr. K. S. Lane 270 PARK AVENUE, NEW YORK, NEW YORK ll` August 23, 1974 Medical Department Dear Mr. Frankenberger: A follow-up industrial hygiene survey to evaluate the changes made in the acetylene cylinder filling building was performed on August 6-7, 1974. The results of the air samples for asbestos are shown on the attached table. At the time of the first addition of asbestos to the mix tank it was noted that the exhaust blower for the shredder was inoperative. It was decided to take samples anyway. As can be seen the results are 2-3 times the ceiling limit value of 10 fibers greater than 5 microns per milliliter. Respiratory protective equipment was worn by the operator and myself. The time of this operation requires about 10 minutes. UCC 011738 A2 1851 Mr. C. Frankenberger 2- - August 2 3, 1974 Follow-up samples a,fter the blower was repaired indicated concentrations at the limit value of 2 fibers. This also points up that routine periodic checking of equipment of this nature should be performed. It is also questionable whether or not is is wise to perform these operations when such conditions exist. The shredder itself could be improved so that the present methods of charging after breaking the bale outside the unit could be eliminated. All other operations checked and the general area samples were below the limit of 5 fibers and the limit of 2 fibers which becomes effective July 1, 1976. For the present it is suggested that these areas be checked on a monthly basis.. If results continue to be below limits, then a six month interval would be sufficient. It would also be desirable to sample when a cylinder is cut open in the machine shop. This operation has not been performed during one of my visits. With regard to cylinder clean-out I would suggest mounting two or three sampling heads connected to a central vacuum source to determine levels in this building. I would not expect to find much if any since this is predominantly a wet system. However, the data should be collected for record purposes. This was discussed with Messrs. Phillips and Wooldridg ' A2 1852 UCC 011739 Mr. C. Frankenberger -3- August 23, 1974 The rest of the plant was inspected as time permitted and no other operations were noted where air sampling was felt necessary for evaluation. Thanking you for your courtesy extended, I remain. LJL:lk Attachment Very truly yours, ^ Leo J. LaFrance Industrial Hygienist ^2jSj UCC 011740 Asbestos in Air Concentrations Union Carbide Corporation Linde Division Speedway Factory Indianap oli s, Indiana August 6-7, 1974 Asbestos Number of Fibers Location___________________.______> 5 microns per milliliter Acetylene Cylinder Fill Building New Shredder room operator * 30 New Shredder general area 20 New Shredder room on operator 2 New Shredder room general area 1 At top of mix tank Plug drill (on operator) 0 1 Top clearance inspection (on operator) 1 Wire brush fill plugs (on operator) ' ^-1 General area-walk around depts. 1 General air-top of power cabinet below old rest room 1 *21854 Remarks Exhaust blower inoperativ Exhaust blower in operation While charging asbestos usual operation usual operation usual operation usual operation UCC 011741