Clean Air Act - Section 112 (r)
Risk Management Program
and EPCRA 312 - - Tier II
Facility Inspection Report
FACILITY INFORMATION:
Name:Lineage Logistics Portland 1
Physical Address:17400 NE Sacramento Street
Phone Number:532-256-2525
Latitude / Longitude: (45.540200, -122.482900)
RMP Facility ID #1000 0019 2506
EJ Concerns:Yes (Above 80%)
CONTACT INFORMATION (RMP Implementation):
Name:Andrey Berezhnoy
Phone Number:503-256-2525
E-mail:aberezhnoy@lineagelogistics.com
EMERGENCY CONTACT INFORMATION:
Name:Andrey Berezhnoy
Phone (24-hr):503-313-0540
E-mail:aberezhnoy@lineagelogistics.com
Website:www.lineagelogistics.com
TRIP DETAILS:
Inspection Date:March 14, 2023
Inspection Time:0845 hours through 1145 hours
EPA Inspection Team:
Peter Phillips, US EPA Region 10 SEE Grantee, Lead RMP Inspector
Edward Johannes, US EPA Region 10 SEE Grantee, EPCRA Inspector
Terry Garcia, US EPA Region 10 SEE Grantee, RMP Inspector
Mhara Coffman, US EPA Region 10, RMP Inspector
Taylor Law, Weston Solutions, Inc., EPA START Contractor
DATE AND PROGRAM LEVELS OF SUBMITTED RMP:
Initial Submission Date:July 12, 2005
Date of Latest Update:December 7, 2022
March 22, 20223Page 1 of 5
Process (Program 1, 2, 3) as reported in RMP:
Process IDDescription
Process NAICS Program Chemical Name Quantity
Chemical ID Code Level CAS Number (lbs)
Ammonia, Anhydrous
1000128517 Refrigeration 1000161139 49312 316,870
(7664-41-7)
PURPOSE:
The purpose of this inspection was to determine if this facility is in compliance with Section 112 (r) of
the Clean Air Act and Title 40 Code of Federal Regulations (CFR) Part 68, Chemical Accident
Prevention Provisions.
The facility has been previously inspected in the past 5 years:NoYes
If Yes, Date of Last Inspection: 11-22-2019
The facility is High Risk:NoYes
Joint EPCRA inspection:NoYes
CAA Title V Air Permit:
Does the facility have a CAA Title V Permit?NoYes
RELEASE / ACCIDENT HISTORY:
Did the facility have a reportable release in the past 5 years?NoYes
EPCRA TIER II REPORTING:
Did the facility submit the [Enter Year] Tier II report to the SERC?NoYes
If Yes, Date the Tier II was submitted:1-10-2023
If No, calendar year of the most recent Tier II:
Did the facility submit a Tier II to the LEPC and local fire department? NoYes
If Yes, Date the Tier II was submitted:1-10-2023
INSPECTION ENTRY:
Peter Phillips led the inspection entry. The EPA Inspection Team (EPA) met with facility representative
General Manager Allan Delacruz at the Lineage Logistics facility in Portland, Oregon. EPA arrived at
the facility at 0845 hours and was joined by the following facility personnel:
Name Title
Allan DelacruzGeneral Manager
Andrey BerezhnoyFacility Maintenance Manager
Daniel MendozaFacility Maintenance Manager
Bo HurleyRegional Safety Manager
Boris VallejoMaintenance Technician
Aaron HawkinsRegional Maintenance Manager
Was a state / county / or local emergency representative present?NoYes
If Yes, Name and Title of Representative: Bryan Profit
The facility is a first responder:NoYes
If No, Responding Agency: Portland Fire Department
Page 2 of 5
Facility representatives escorted EPA to a conference room located in the facility's main office building.
Lead Inspector Peter Phillips introduced all parties present, provided a summary of the Risk Management
Program (RMP), and explained the purpose of the visit. Each EPA Inspector presented his / her credentials.
EPA requested an explanation of the facility's operations and any additional safety measures to be taken
during the site tour. Andrey Berezhnoy gave a brief description of the facility, operations, and personal
protective equipment required for the tour.
Prior to the inspection, EPA sent a certified notice of inspection letter to the facility informing them of the
CAA Section 112 (r) (6) (L) requirement that facility employees and employee representatives (such as a
union representative) have the right to participate in the RMP inspection, and that a copy of the letter must
be provided to the employee representative(s) and the letter posted in a manner accessible to employees
in the facility.
The facility is unionized:
No
Yes
An employee representative present during the facility visit:
No
Yes
If Yes, Name / Title: Andrey Berezhnoy - Facility Maintenance Manager
GENERAL INFORMATION:
The facility is regulated under RMP rule a Program Level 3 facility and is owned and operated by Lineage
Logistics Holdings, LLC. The facility provides large - scale public storage for food products and utilizes
one anhydrous ammonia to refrigeration system to support product warehousing, receiving, and shipment.
The refrigeration system utilizes approximately 16,870 pounds of anhydrous ammonia, and cools six
warehousing rooms. The facility employs 27 full - time employees on site, three of whom are designated
refrigeration system operators.
ON-SITE OBSERVATIONS:
EPA toured the facility from approximately 1000 hours to 1030 hours. A single engine room houses the
refrigeration system components supported by a roof - mounted condenser (photo 37). The refrigeration
system services six cold storage rooms. Each cold storage room contains a minimum of two evaporators
per room for cooling, and two ammonia detectors. Ammonia detectors engage alarms when they detect
ammonia at 25 parts per million (ppm) and the system initiates shutdown when it detects 100 ppm
ammonia.
The facility includes six cold storage rooms, designated as cold storage rooms 1-6 (photo 1). EPA
observed select areas of the facility including the interior loading area (photo 2), the forklift staging area
(photos 3-4), cold storage room 2 (photos 5-10), the engine room (photos 11-34), and the exterior areas
of the facility including roof - mounted components and the exterior loading dock (photos 35-38).
EPA observed food products warehoused in cold storage room 2 (photos 5-6) and cooled by evaporators
(photos 6-7). Two ammonia detectors provide safety alarms to the area (photos 8-10).
EPA toured the engine room (photos 11-12) and observed refrigeration system components including
compressors and piping (13-20), intake and exhaust vents (photos 21-23), and pump units (photos 24-26).
EPA observed inspection tags on components as current (photo 27). Safety measures observed in the
engine room include an emergency shower and eye wash station (photo 28), posted HAZCOM signage
(photos 29-30), ammonia detectors and alarm system (photos 31-32), posted safety contacts and permits
(photo 33), lockout tagout and emergency stop controls (photo 34-35), and absorbent padding beneath
compressors to support housekeeping (photo 36).
Page 3 of 5
EPA observed the roof - mounted condenser component of the refrigeration system and a windsock at the
exterior of the building (photo 37 and 38), as well as the exterior loading dock (photo 38).
Photographs taken during the inspection are included in Attachment A to this report.
After touring the RMP-covered process areas at the facility, EPA returned to the conference room to
review the RMP documentation. Upon completion of the document review, EPA provided a debriefing
to Allan Delacruz, Andrey Berezhnoy, Daniel Mendoza, Bo Hurley, Boris Vallejo, and Aaron.
INFORMATION COLLECTED FROM FACILITY:
Facility Tier II hard copy
Miscellaneous Safety Systems document
2. 4.EC 5Po.Ap y3s. i og1f.n R2ie0nf r2is1gh eerCeaottmi
ponl iSaysntceem bAluocdki tfl
ow diagram
AREAS OF CONCERNS ADDRESSED IN CLOSING CONFERENCE:
No areas of concern were identified at the time of the inspection.
DOCUMENTS REQUESTED NOT INCLUDED IN REPORT:
The following documents were requested during the inspection but are not included in this report. These
documents will still be reviewed to determine compliance with Section 112 (r) of the Clean Air Act.
No follow - up documentation was requested.
Page 4 of 5
INSPECTION REPORT CERTIFICATION:
This is to certify that I, Peter Phillips, was the lead inspector at this facility and that I have verified the
accuracy of the observations in this inspection report:
PETER PHILLIPSDigitally signed by PETER PHILLIPS
(Affiliate)
(Affiliate)
Date: 2023.07.17 11:27:07 -07'00 '
Inspector Signature
Digitally signed by JAVIER
JAVIER MORALES MORALES
Date: 2023.07.25 15:00:22 -07'00 '
RMP Coordinator / Approval
Digitally signed by ERIN
ERIN WILLIAMS WILLIAMS
Date: 2023.08.01 09:18:15 -07'00 '
EPCRA Coordinator / Approval
MATTHEWDigitally signed by MATTHEW
QUARTERMAN
QUARTERMANDate: 2023.08.01 09:54:42 -07'00 '
Land Enforcement Section Chief / Approval
Page 5 of 5
Attachment A-Photo Log
Site Name:Lineage Logistics Portland 1
City, State:Portland, Oregon
Photographer:Taylor Law
File Photo Layout ID Date TimeDescription
Photo 1.jpg13/14/2023 09:45 am Facility Layout Map
Photo 2.jpg23/14/2023 09:46 am Interior Loading Area, overview
Photo 3.jpg33/14/2023 09:46 am | Forklift Staging Area, overview
Photo 4.jpg43/14/2023 09:46 am Forklift Staging Area, overview
Photo 5.jpg3/14/45
2023 09:46 am Cold Storage Room 2, overview
Photo 6.jpg63/14/2023 09:47 am Cold Storage Room 2, overview
Photo 7.jpg73/14/2023 09:50 am Cold Storage Room 2, evaporators
Photo 8.jpg83/14/2023 09:50 am Cold Storage Room 2, ammonia detector
Photo 9.jpg93/14/2023 09:50 am Cold Storage Room 2, ammonia detector
Photo 10.jpg103/14/2023 09:50 am Cold Storage Room 2, ammonia detector
Photo 11.jpg113/14/2023 09:50 am Engine Room, overview
Photo 12.jpg123/14/2023 09:50 am Engine Room, overview
Photo 13.jpg133/14/2023 09:51 am Engine Room, compressors and piping
Photo 14.jpg143/14/2023 09:51 am Engine Room, compressors and piping
Photo 15.jpg153/14/2023 09:51 am Engine Room, compressors and piping
Photo 16.jpg163/14/2023 09:52 am Engine Room, screw compressor and piping
Photo 17.jpg173/14/2023 09:52 am Engine Room, compressors and piping
Photo 18.jpg183/14/2023 09:52 am Engine Room, compressors and piping
Photo 19.jpg193/14/2023 09:53 am Engine Room, compressors and piping
Photo 20.jpg203/14/202309:53 am Engine Room, compressors and piping
Photo 21.jpg213/14/2023 09:55 am Engine Room, air intake
Photo 22.jpg223/14/2023 09:55 am Engine Room, air exhaust vent
Photo 23.jpg233/14/2023 09:55 am Engine Room, air exhaust vent
Photo 24.jpg243/14/2023 09:56 am Engine Room, pump units
Photo 25.jpg253/14/202309:58 am Engine Room, pump units
Photo 26.jpg263/14/2023 09:58 am Engine Room, pump units
Photo 27.jpg273/14/2023 09:58 am Engine Room, maintenance tag example
Photo 28.jpg283/14/2023 09:59 am Engine Room, emergency shower and eye wash station
Photo 29.jpg293/14/202310:00 am Engine Room, hearing protection and posted hazcom signage
Photo 30.jpg303/14/2023 10:00 am Engine Room, posted hazcom signage
Photo 31.jpg313/14/2023 10:00 am Engine Room, ammonia detection system
Photo 32.jpg323/14/2023 10:00 am Engine Room, detection ammonia alarm
Photo 33.jpg333/14/202310:00 am Engine Room, posted emergency contacts and permits
Photo 34.jpg343/14/2023 10:01 am Engine Room, exit and lockout tagout station
Photo 35.jpg353/14/2023 10:02 am Engine Room, absorbent pad beneath compressor to aid housekeeping
Photo 36.jpg363/14/2023 10:03 am Facility Exterior, emergency stop for Engine Room system
Photo 37.jpg373/14/202310:04 am Facility Exterior, roof mounted windsock and condenser
Photo 38.jpg383/14/2023 10:04 am Facility Exterior, Exterior Loading Dock