Document GKqEVmBeev5pMqY7qKVOOpNyq

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION III 1650 Arch Street Philadelphia, Pennsylvania 19103-2029 Report Title: Inspection Date(s): Regulatory Program(s): Type of Activity: Site/Facility Name: Permittee(s): Site/Facility Operator: Site/Facility Address: Latitude: County/Parish: Permit Number: NAICS Code: Unique Project #: Clean Water Act Compliance Inspection Report 07/19/2022 National Pollutant Discharge Elimination System (NPDES) Pre-Treatment - POTW Inspection Sunbury Wastewater Treatment Plant Sunbury Wastewater Treatment Plant Sunbury Municipal Authority 462 South 4th Street Sunbury, PA 17801 40.85462 Longitude: -76.79459 Northumberland County PAL026557 22132 SIC: 4952 3E22WN019A Site/Facility Representative(s): Clyde Troutman Phone: 570-286-5858 Sunbury IPP Manager Email: ctrout@ptd.net Email: Point of Contact Zach Zechman, Wastewater Technician EPA Inspector: Garth Connor Phone: 215-814-3209 EPA Inspector Email: Connor.garth@epa.gov Report Preparer Signature/Date Supervisor Signature/Date GARTH CONNOR Date: 2022.09.07 10:59:55 -04'00' Digitally signed by GARTH CONNOR Garth Connor, ESS (ED13) Date EPA Region 3 - Philadelphia, PA 19103 ZELMA MALDONADO Date: 2022.09.09 07:55:21 -04'00' Digitally signed by ZELMA MALDONADO Zelma Maldonado Date ESS Acting Section Chief - EPA Region 3 Unique Project#: 3E22WN019A Sunbury Wastewater Treatment Plant - Pre-Treatment Report 07/19/2022 Table of Contents Section Page I Introduction............................................................................ 3 A Inspection Opening Conference...................................................................... 3 B Weather and Precipitation Conditions............................................................. 3 C Summary of the Facility.................................................................................. 4 II Site Activity..................................................................................................... 4 III Observations.................................................................................................... 4 IV Records Review............................................................................................... 4 V Closing Conference......................................................................................... 5 VI List of Attachments.......................................................................................... 7 Unique Project #: 3E22WN019A Page 2 of 7 Sunbury Wastewater Treatment Plant - Pre-Treatment Report 07/19/2022 I. Introduction On July 19, 2022, Garth Connor, an inspector from the U.S. Environmental Protection Agency ("EPA") Region III Office in Philadelphia, Pennsylvania, conducted an onsite Pre-Treatment Inspection at the Sunbury Wastewater Treatment Plant facility (hereinafter, "Sunbury", "the Facility". This Facility is located at 462 South 4th Street in Sunbury, Northumberland County, Pennsylvania. Sunbury operates a wastewater treatment plant for the residents in that community, and it also has a pre-treatment program for its industrial users. The Facility discharges its wastewater to the nearby Shamokin Creek, a tributary of the Susquehanna River. Sunbury is located just east of the Susquehanna River. The purpose of the inspection was to observe compliance with the Pre-Treatment regulations of the Clean Water Act (CWA) and to verify their compliance with the applicable industrial user regulations. The Pennsylvania Department of Environmental Protection was invited to the inspection but chose not to attend. A. Inspection Opening Conference The EPA Inspector arrived at the facility at about 10:00 AM for this onsite inspection and met with the following facility representatives: Name Garth Connor Clyde Troutman Zach Zechman Table 1: Inspection Attendee List Affiliation Telephone Email EPA Region III Inspector EPA - Phila. Office 215-814-3209 Connor.garth@epa.gov Site/Facility Representatives Sunbury - Manager of 570-286-5858 ctrout@ptd.net Industrial Pre- Treatment Program Sunbury - Wastewater 570-286-5858 Technician Garth Connor displayed his inspector credentials to Clyde Troutman at the start of the inspection, and explained that the purpose of the inspection was to observe their compliance with the pretreatment regulations of the Clean Water Act. The EPA Inspector informed the Sunbury staff that any information that the Facility deemed to be Confidential Business Information ("CBI") should be identified to the EPA inspector during the inspection and it would be handled as CBI according to EPA's CBI procedures. B. Weather and Precipitation Conditions During the inspection, the weather was mostly sunny with temperatures in the 70's. Unique Project #: 3E22WN019A Page 3 of 7 Sunbury Wastewater Treatment Plant - Pre-Treatment Report 07/19/2022 C. Summary of the Site/Facility Sunbury has an EPA-approved Pre-Treatment program for its industrial users (IUs), and it currently has only three significant IUs. Sunbury had more IUs years ago, but many of those industries have closed their operations in Sunbury and moved elsewhere. The three IUs operating in Sunbury now are Dempsey Uniform and Linen Supply (Dempsey), Weis Meats and, at a separate location, Weis Milk & Cheese (Dairy Plant). Dempsey does industrial laundering of medical uniforms and other linens, and it operates large washers and driers at its plant. Mr. Trout has worked as the Manager of the Industrial Pre-treatment Program at Sunbury for many years, and he is quite familiar with all three of these IUs and their manufacturing operations. The EPA inspector picked Dempsey as the IU to be visited in Sunbury for the second part of this inspection. Mr. Trout informed the EPA inspector that the IUs are all sampled twice a year by Sunbury pre-treatment staff and the IUs are also inspected annually by the POTW staff. II. Site Activity During the inspection, the EPA Inspector first discussed the details of the Sunbury's industrial pre-treatment program with Mr. Troutman and Mr. Zack Zechman, a Sunbury wastewater technician, in an Opening Conference at an office in the Sunbury wastewater treatment plant. Mr. Troutman explained to the EPA inspector that he and his staff issue 5-year discharge permits to all three of their IUs. They regularly sample and inspect all three of their industrial users to make certain that they're all operating within their permit limits. See Attachment #1 - Inspection Photographs for photographs of the different aspects of the IU inspection. The inspector walked thru the entire Dempsey plant to see the different segments of Dempsey's industrial laundering process. The inspection observations were made pursuant to the requirements of the Pre-Treatment regulations of the Clean Water Act. III. Observations The EPA inspector started at the Sunbury wastewater treatment plant with Mr. Troutman and Mr. Zechman. Mr. Troutman explained that Dempsey generates an average about 40,000 gallons of wastewater per day, and the flow is constantly measured by a flow meter operating near the front entrance to the Dempsey plant. Photograph #1 shows the Sunbury sampling vehicle that is used by the wastewater staff on sampling visits to their IUs. Photograph #2 shows some of the sampling equipment in the back of the vehicle, including a 24-hour composite sampler. The sampler is calibrated by Sunbury staff prior to each time it's used. The EPA inspector and the Sunbury staff were met by Kyle Jessick, Dempsey's Environmental Unique Project #: 3E22WN019A Page 4 of 7 Sunbury Wastewater Treatment Plant - Pre-Treatment Report 07/19/2022 Coordinator. Photograph #3 shows the front portion of the plant and the sign for Dempsey from the street (Edison Avenue). Photograph #4 shows the wastewater sampling location, called the sampling pit, which is about two feet below ground and is near the front entrance of Dempsey. Photograph #5 shows the same location with the metal cover removed so that the EPA inspector could observe the wastewater flow heading toward the sewer. The Sunbury sampling device, a 24-hour composite sampler, is placed into this discharge flow during wastewater sampling events. Both Dempsey and the Sunbury POTW staff sample at this exact same location, but they sample there in alternating quarters. Photograph #6 is the Dempsey storage area located in the rear of the plant for storage of waste oil and other cleaning chemicals. Photograph #7 is a spill kit within the Dempsey plant just in case of an accidental spill of any chemicals. IV. Records Review During this inspection, the EPA Inspector filled out a POTW Pre-Treatment Inspection Checklist, and that document is attached (Attachment #2 - POTW Inspection Checklist). He was also given an electronic copy of the Dempsey IU permit which includes all the parameter limits and sampling requirements for the industrial laundry's wastewater discharges (Attachment #3 - Dempsey IU Permit). Dempsey does twice a year sampling of its wastewater, and the Sunbury POTW staff also samples there twice a year. The laundry facility is sampled quarterly, a total of four times a year between the two types of sample collection. Sunbury staff sample the Dempsey wastewater in the first and third quarters of each calendar year, Dempsey staff sample in the second and fourth quarters. Sunbury has three significant IUs currently operating and they're all non-categorical industrial users that have been in business in Sunbury for many years. A recent sampling occurred in May, and the results are attached (Attachment #4 - Recent Sampling Results). The laboratory analysis of those samples was done offsite by Pace Analytical Laboratories in Williamsport, Pennsylvania. The results of the recent quarterly sampling by Sunbury staff were reviewed by the EPA inspector and show that all of results of the limited parameters are well below Dempsey's permit limits. The EPA inspector also received electronic copies of Sunbury's recent annual inspection of Dempsey in May of 2022 (Attachment #5 - Sunbury Inspection of Dempsey). V. Closing Conference After the facility inspection at Dempsey, the EPA Inspector met with the Sunbury facility representatives for a closing conference. The EPA Inspector shared preliminary observations with the facility. The EPA Inspector reiterated to the Sunbury staff that all the preliminary observations discussed were not compliance determinations. Any and all preliminary observations shared are subject to further investigation by EPA staff upon the additional review of records and documentation. Additional observations may be contained in this inspection Unique Project #: 3E22WN019A Page 5 of 7 Sunbury Wastewater Treatment Plant - Pre-Treatment Report 07/19/2022 report and its attachments that were not identified at the time of the closing conference after EPA reviewed additional materials that were sent following the onsite inspection. The inspection concluded at approximately 1 PM, and the EPA inspector then left the Facility. Unique Project #: 3E22WN019A Page 6 of 7 Sunbury Wastewater Treatment Plant - Pre-Treatment Report 07/19/2022 VI. List of Attachments Attachment #1: Inspection Photographs Attachment #2: Industrial User's Checklist Attachment #3: Dempsey's IU Permit Attachment #4: Sampling Results Attachment #5: Sunbury Inspection of Dempsey Unique Project #: 3E22WN019A Page 7 of 7