Document GKnqm1ORQ4J5bw7mDkBe5rJR7

WiC V^V.W Monsanto FOm |NAMf & LOCATION) R. J. Burkett, Texas City DA,E subject REFERENCE December 21, 1976 Safety Contact 1976 Follow-Up HDPE Department 35 TO : G. W. Daues cc' R. W. Ceyanes J. A. Glass G. W. Hanks C. E. Griffith All returned cards from the Safety Contact Program were reviewed for valid com ments and suggestions that could improve the safety performance in Department 35 and eliminate potential hazards. Some of the items noted are already being cor rected; others are new and will be implemented. Listed below are the valid com ments/suggestions with the status/planned action. ITEM NO. 1 2 3 SUGGESTIONS/COMMENTS Pellet transfer hose station operation has strain, tripping and pinch point hazards (2 coiranents). Changing screen blocks is a lifting, dropping, and burn hazard (3 comments). Removing blob/powder/ crumb from top of ram. Hands are inside fluff mechanism when ram moves (1 comment). STATUS/PLANNED ACTION RESPONSIBILITY This hose station has been mechanically revised several times to reduce hazards. Proper procedure/work practice is impor tant and must be followed. BAH Actions A. Perform work analysis to determine the proper procedure - develop formal written procedure and train all opera tors. B. Make and engineer study to explore new equipment or installation. A. Develop formal written procedure to change screen blocks. The procedure will be taught to each operator and enforced. B. Replace air hoist on lines 1 and 2 with 2 chain operated hoists. C. Provide leather welders gloves and sleevelets to each operator. RLT A standard written procedure will be developed to do this job safely. Equip ment modification will be done as required. RLT SC 14493 LAM015085 Safety Contact 1976 Follow-Up HDPE Department 35 Page 2 ITEM NO. SUGGESTIONS/COMMENTS STATUS/PLANNED ACTION RESPONSIBILITY 4 Revise door to additive New door that will swing in is on order. RLT package room to allow drums to be moved in more safely. 5 Moving, heating and Procedures and equipment will be re pumping liquid additives viewed and changed if needed. could cause burns, chemi cal contact irritations and strains (2 comments). RLT 6 Considerable dust is Each operator will be issued dust RLT present while dumping respirators. additives into blend tank. Procedure and evacuation equipment will be examined for adequacy. 7 Blade change on G1-1&2 Procedure recently revised to decrease RLT is a hazard(burns and hazard. Life of blades has been increased cuts). from 10 days to 7 weeks. 8 Removing blob from ex This is a violation of standard written RLT truder hopper while procedures - comment will be discussed screw Is turning. with the expert. 9 Filling procedure on fil Order has been written to modify piping on TEK ters F71-1&2 after main filters F71 - 1&2 to allow procedure to be tenance should be revised. modified. R. J. Burkett sc 14494 LAM015086