EPA Region 5 Enforcement and Compliance Assurance Division INSPECTION REPORT
Inspection Entry Date/Time Inspection Exit Date/Time Weather Media Statute(s)/Program(s) Type of Inspection
03/21/2023 09:10 AM (ET)
Announced: No
03/22/2023 11:30 AM (ET)
Access: Granted
Cloudy, dry
Water
Clean Water Act, NPDES, Industrial
CEI - Compliance Evaluation Inspection
Permittee Name Facility or Site Name Facility/Site Physical Address City, State, Zip Code County/Borough/Parish Facility GPS Coordinates
Ohio Coatings Co. Ohio Coatings Co. 2100 Tin Plate Place Yorkville, OH 43971 Belmont 40.14658, -80.70718
FRS ID
110000735526
Permit Number(s) (If Applicable) OH0120588 (effective December 1, 2022 through November 30, 2027)
SIC and/or NAICS
3312
Lead Inspector: Megan Zale
MEGAN ZALE
EPA Region 5
Digitally signed by MEGAN ZALE Date: 2023.05.30 09:48:22 -04'00'
zale.megan@epa.gov
(440) 250-1711
Supervisor Review: Brooke Furio
Digitally signed by Furio,
Furio, Brooke Date: 2023.05.30 Brooke
10:56:53 -04'00'
EPA Region 5
furio.brooke@epa.gov
(440) 250-1705
SECTION I - INTRODUCTION
Site Entry and Inspection Objectives
Dave Emerich, Process Control Manager, was out on medical leave during the inspection. EPA Region 5 Lead Inspector, Megan Zale, arrived at the Ohio Coatings Co. (the "Site" or "Facility"), located at 2100 Tin Plate Place, Yorkville, OH 43971, at 09:10 AM (ET) on 03/21/2023 for an unannounced inspection. EPA Region 5 Lead Inspector presented credentials to Lori Clark and Doug Crow and informed them that this was an EPA Region 5 inspection to determine compliance as authorized by Clean Water Act (CWA) Section 308 and implementing regulations. This report is based on information supplied by Ohio Coatings Co. representatives, direct observations made by the EPA Region 5 inspector, records and reports maintained by the permittee and other information including: photographs taken by EPA Region 5 inspector(s), physical evidence collected by the EPA Region 5 inspector(s), measurements taken by EPA Region 5 inspector(s), verbal or written statements
1 of 30
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
made by information supplied by Ohio Coatings Co. representatives during or subsequent to the on-site Inspection, and materials, processes, data, photographs, or documents shown, demonstrated, or submitted to the EPA Region 5 inspector(s) by Ohio Coatings Co. representatives during or subsequent to the on-site Inspection. In addition, information gathered prior to or subsequent to the Inspection from a review of EPA, State, and/or public records may be included in this report.
Attendees Organization
EPA Region 5 EPA REGION 5 Ohio Coatings Ohio Coatings
Ohio Coatings
Ohio Coatings
Attendee Name
Megan Zale Jonathan Moody Lori Clark Doug Crow
Dave Emerich
Dave Bechtel
Title
Lead Inspector Inspector VP - Commercial Senior Quality Technician Process Control Manager Electrical Manager
Present in Opening Conf. Yes Yes Yes Yes
Present in Closing Conf. Yes Yes Yes No
No
Yes
No
Yes
Facility/Site Description
The EPA Region 5 lead inspector confirmed the following facility information:
Ohio Coatings purchases light gauge carbon steel cold rolled coils and electrolytically tin plates them. The coils are cleaned with NaOH based cleaner, rinsed with reverse osmosis treated water ("RO water"), pickled/cleaned with sulfuric acid based cleaner, rinsed with RO water, tension-leveled, trimmed, then tin plated and rinsed with RO water again. The plating medium is methyl-sulfonic acid. The coils are then chemically treated with sodium dichromate. All RO water rinses drain directly to the wastewater equalization tank and subsequently flows through the wastewater treatment process of neutralization, flocculation with a polymer, clarification, and then liquid flows over weirs to two sand filters, and solids go to a thickener, filter press, and off-site disposal. Clean water from the sand filters flows over a weir and to the final outfall box. The sand filters are a continuous backwash type and the backwash is directed back to the equalization tank. Sodium dichromate chemical treatment wastewater is directed to a chrome rinse equalization tank and then a chrome reduction tank, where it is treated with sodium bisulfite to reduce hexavalent chromium to trivalent chromium. It then flows to the wastewater treatment equalization tank. All coils are stored indoors. The RO water is treated pumped well water. Municipal water is used in the kitchen and laboratory, which flows through a drain system and then to the equalization tank and through wastewater treatment. Blowdown from the facility's cooling towers and the air scrubber goes to the equalization tank and through wastewater treatment. The facility utilizes a 275-gallon quench tank which has a continuous 8 to 10 gallon per minute (gpm) outflow to wastewater treatment during operation. The facility's design flow is 0.094 million gallons per day.
Facility/Site Information Industrial Sector/Sub- SIC Categories 3312 and 3471 sector Type of Operation Electrolytic tin plating of light gauge carbon steel cold rolled coils
2 of 30
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
Size of Facility
40 acres
Outfalls (and do the numbers and locations match the permit?)
001 and 002. The locations match the permit.
Do you self-monitor Yes and keep monitoring records?
Do you use in-house or contract out for laboratory analyses? Or both?
Contract out for all permit analyses but do in-house testing for pH and temperature
Have there been or No are there plans to make changes in the process(es) that will cause a new, different, or increased discharge?
Location(s)
SECTION II - OBSERVATIONS
OHIO COATINGS CO. Observation #: MZ2-OB-001
Date: 03/21/2023
Weather: Cloudy, dry
The designated stormwater effluent pipe outside of the facility had a significant amount of flow on the day of the inspection. Steam could be seen coming from the pipe, which indicated that the flow did not consist entirely of stormwater. It appeared to exit the outfall prior to the diffuser (Photos # 492 through 505). A schematic received from facility representatives showed that a PVC pipe for the facility's wastewater effluent was located within the stormwater pipe and connected to the diffuser.
OHIO COATINGS CO. Observation #: MZ2-OB-002
Date: 03/21/2023
Weather: Cloudy, dry
There was no wet thermometer in the effluent automatic sampler refrigerator.
OHIO COATINGS CO. Observation #: MZ2-OB-003
Date: 03/21/2023
The pH buffers for the effluent sampling probe appeared dirty.
OHIO COATINGS CO. Observation #: MZ2-OB-004
Date: 03/21/2023
3 of 30
Weather: Cloudy, dry Weather: Cloudy, dry
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
Some of the wastewater treatment components were located outside. These components were the sludge thickener, clarifier, equalization tank, and cooling towers.
OHIO COATINGS CO. Observation #: MZ2-OB-005
Date: 03/21/2023
Weather: Cloudy, dry
Facility representative Doug Crow stated that a weekly calibration was completed for the effluent pH probe, but the process that was shown to EPA during the inspection was a calibration verification.
SECTION III - RECORDS REVIEW
EPA requested via email six months of calibration records for the effluent pH probe. The records show that facility personnel record the slope percentage approximately every week. EPA also requested via email the pH probe model and user manual to verify whether the facility was following calibration or verification procedures and did not receive it from the facility representatives.
Water balance numbers shared with EPA by Doug Crow via discussion during the
inspection:
Flow rates shared with EPA
Gallons of flow per day
by facility representative
(calculated from flow in
Process
during inspection
previous column)
Clean
4 gpm*
5760
Pickel(etch)
5 gpm
7200
plating
6 gpm
8640
Quench
6 gpm
8695
chemtreat
9 gpm
12960
Fume Scrubber
5 gpm
7200
Aux Fume Scrubber
8 gpm
192
cooling towers
4 gpm
5760
RO reject
20000 gal/day
20000
Softeners
100 gal/regeneration**
300
Boilers
125 gal/week
25
*gpm = gallons per minute **gal/regeneration = gallons used per water softener regeneration process
Total
76,732
Permit Renewal Application
The facility's most recent NPDES permit renewal application, Ohio EPA form 2C (for the permit effective December 1, 2022 through November 30, 2027), lists the total flow from outfall 001 as 0.091 MGD in Section II. B. It also includes a list of process wastewater to outfall 001. Outfall 002 is not included in the Section II.B. table.
4 of 30
Ohio Coatings Co.
Inspection Date(s):
03/21/2023 - 03/22/2023
The information contained in Section II does not distinguish the process wastewater volume from the noncontact cooling water and does not include the reject water from the reverse osmosis, softeners, and boilers. Per the information entered in Section II.C. of the form 2C, the 0.091 MGD volume includes the process wastewater and the non-contact cooling water.
The "Fact Sheet Regarding an NPDES Permit To Discharge to Waters of the State of Ohio for Ohio Coatings Company" for the most recent permit (December 1, 2022 through November 30, 2027) includes the statement:
"Non-contact cooling water blowdown contributes 0.005 MGD to outfall 001. As a result of the dilution, NSPS [40 CFR 433.16(c)] require lower limits which are reflected in the calculation for total suspended solids, total cyanide, chromium, and total toxic organics. A ratio of 0.005 MGD to average flow was used: 0.094 MGD yields a 5.3 percent reduction in limits for these parameters."
Based on the information provided by the facility during the inspection, the percentage of the dilutional flow would be the combination of the cooling towers and blowdowns, 26,085 gallon/day (5,760 + 20,000 + 300 + 25) and divided by the total flow, 76,732 gallon/day which is approximately 34%. This is different than the approximate 5% dilutional flow reported in the most recent permit application.
Schematic showing that a PVC pipe for the facility's wastewater effluent was located within the stormwater pipe and connected to the diffuser.
SECTION IV - SAMPLING ACTIVITIES AND ANALYTICAL RESULTS
USEPA staff conducted field monitoring using an AT-600 manufactured by In-Situ Inc with serial number 689929. The AT-600 included a pH probe, and a temperature/specific conductivity probe. A calibration was conducted in the afternoon on March 20, 2023, with an In-Situ QuickCal solution for specific conductivity and ORP. A threepoint pH calibration was conducted in the morning on March 22, 2023, with 4.00, 7.00 and 10.00 buffer standards. All measurements were taken on March 22, 2023.
Time Description
Lat
Long
Temp Sp. Cond. pH
(F)
(uS/cm)
9:27 AM Discharge effluent box inside facility,
40.1469617 -80.7103217 79.5
6,359
7.90
shown in photo DSCN0488.JPG and
DSCN0489.JPG.
9:52 AM Stormwater outfall (002) shown in
40.1465900 -80.707335 67.5
4,610
8.00
photo DSCN0497.JPG
9:54 AM Edge of the Ohio River upstream of the 40.1466483 -80.707090 46.0
300
8.02
confluence of the conveyance shown in
photo DSCN0497.JPG
9:55 AM Edge of the Ohio River downstream of 40.1465333 -80.707055 45.1
453
7.79
the confluence of the conveyance
shown in photo DSCN0497.JPG
ORP (mV)
-108
114 152
174
SECTION V - AREA OF CONCERN Area(s) of Concern may not be in sequential order. The presentation of Area(s) of Concern does not constitute a formal compliance determination or violation.
5 of 30
Ohio Coatings Co.
Inspection Date(s):
03/21/2023 - 03/22/2023
AOC Reference #: MZ2-OB-001 Regulation and/or Permit Requirement
Page 9 of the "Fact Sheet" for the facility's current NPDES permit states: "Outfall 001 discharges treated process wastewaters via a 3-port diffuser (installed in July 2015) to the Ohio River. Outfall 002 discharges only stormwater. The diffuser extends from the final outfall pipe separated from the storm water at outfall 002." Page 14 of the "Fact Sheet" states that the diffuser is used to meet whole effluent toxicity limits.
AOC: At the time of the inspection, there was a significant quantity of flow coming from outfall 002 which is supposed to be the stormwater only outfall. It was not raining at the time of the inspection. Based on field monitoring conducted during the inspection, the temperature and specific conductivity of the water at outfall 002 was similar to the field monitoring parameters at outfall 001. The temperature at 001 was 79.5 fahrenheit and the temperature at 002 was 67.5 fahrenheit which was warmer than the ambient air temperature and the temperature of the river which was approximately 46 degrees fahrenheit. The specific conductivity at outfall 001 was 6,359 uS/cm, the specific conductivity at 002 was 4,610 uS/cm, the specific conductivity in the Ohio River upstream of the confluence was 300 uS/cm.
The designated stormwater effluent pipe outside of the facility had a significant amount of flow on the day of the inspection. Steam could be seen coming from the pipe. It appeared to exit the outfall prior to the diffuser. A schematic received from facility representatives showed that a PVC pipe for the facility's wastewater effluent was located within the stormwater pipe and connected to the diffuser.
AOC Reference #: MZ2-OB-005
Regulation and/or Permit Requirement
Page 16 of the facility's current NPDES permit: "3. FACILITY OPERATION AND QUALITY CONTROL All wastewater treatment works shall be operated in a manner consistent with the following: A. At all times, the permittee shall maintain in good working order and operate as efficiently as possible all treatment or control facilities or systems installed or used by the permittee necessary to achieve compliance with the terms and conditions of this permit. Proper operation and maintenance also includes adequate laboratory controls and appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems which are installed by a permittee only when the operation is necessary to achieve compliance with conditions of the permit. B. The permittee shall effectively monitor the operation and efficiency of treatment and control facilities and the quantity and quality of the treated discharge."
AOC: Facility representative Doug Crow stated that a weekly calibration was completed for the effluent pH probe, but the process that was shown to EPA during the inspection appeared to be a calibration verification. EPA was unable to determine the manufacturers recommendations for the calibration and verification schedule for the pH probe. EPA requested the probe model number and manual after the inspection from the facility but did not receive it.
6 of 30
Ohio Coatings Co.
Inspection Date(s):
03/21/2023 - 03/22/2023
AOC Reference #: MZ2-OB-005 Regulation and/or Permit Requirement:
Page 9 of the fact sheet for the facility's current NPDES permit: "Non-contact cooling water blowdown contributes 0.005 MGD to outfall 001. As a result of the dilution, NSPS [40 CFR 433.16(c)] require lower limits which are reflected in the calculation for total suspended solids, total cyanide, chromium, and total toxic organics. A ratio of 0.005 MGD to average flow was used: 0.094 MGD yields a 5.3 percent reduction in limits for these parameters."
AOC: RO reject is not included in the dilutional flow calculation in the facility's most recent permit renewal application, which created an incorrect water balance. It is also not included as a contributing flow source in section II B of the most recent permit renewal application.
SECTION VI - CLOSING CONFERENCE AND FOLLOW UP
Closing Conference
The EPA Region 5 Lead Inspector held a closing conference with Facility personnel at 11:30 AM (ET) on 03/22/2023 for the inspection. During the closing conference, EPA Region 5 Lead Inspector discussed the observations and Area(s) of Concern identified during the inspection. Observations and Area(s) of Concern have not yet been evaluated for a formal compliance determination.
EPA conducted the closing conference on 3/22/2023 at 10:30 AM. Dave Emerich joined via phone call. EPA stated that there should be a wet thermometer in the automatic sampler fridge where the effluent leaves the plant. EPA also mentioned that the pH buffers for the outfall sampling that were stored near the effluent automatic sampler looked dirty. EPA asked for information about the blue liquid in the floor drain next to the effluent location in the facility and Dave Emerich responded that it was precipitation from chemical testing in lab and that the chemicals from the laboratory go through the drain and to treatment. EPA asked if a pH calibration versus a pH verification is done at the effluent location regularly. Dave Emerich answered that pH is calibrated weekly. EPA asked if drawings were available for the effluent piping to the outfall diffuser system and asked about the apparent effluent flow in the stormwater pipe outside of the black effluent pipe. Dave Emerich verified that the black pipe should be effluent. He said it begins inside the facility. He confirmed that the 3-foot diameter pipe is the stormwater pipe. He said drawings were with the PTI for the installation of the outfall diffuser. He also said both the diffuser and the black stormwater pipe were installed in June 2014. He also said he does not know where the current flow in the stormwater pipe is coming from. He said there is normally no flow in the stormwater pipe on dry days like the day of the inspection.
Follow Up
EPA received an email from Dave Emerich on May 9th, 2023 containing a schematic showing that a PVC pipe for the facility's wastewater effluent was located within the stormwater pipe and connected to the diffuser. The email also stated that the PVC pipe was found dislodged from its position and allowing water to bypass, and that repairs were planned for May 13th, 2023.
EPA received an additional email from Dave Emerich on May 26th, 2023 which contained photos showing repairs made to the diffuser line.
7 of 30
Ohio Coatings Co. Inspection Date(s):
SECTION VII - LIST OF APPENDICES 1. Photo Log
03/21/2023 - 03/22/2023
8 of 30
Ohio Coatings Co. Inspection Date(s):
APPENDIX 1: PHOTO LOG
03/21/2023 - 03/22/2023
Cleaning process
DSCN0457.JPG
03/21/2023 10:25 AM
Photographer: Megan Zale
Facility processing area
No CBI
No PII
Cleaning process. Fume collection is through white pipe or duct, above process
Cleaning process fume water
DSCN0458.JPG
03/21/2023 10:25 AM
Photographer: Megan Zale
Facility processing area
No CBI
No PII
Cleaning process fume water flows here and is then pumped to wastewater treatment
9 of 30
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
Main fume exhaust
DSCN0459.JPG
03/21/2023 10:31 AM
Photographer: Megan Zale
Facility processing area
No CBI
No PII
Main fume exhaust - reverse osmosis treatment occurs where screen is. Wastewater flows out through pipe in bottom left of photo via sump pump (blue) to equalization tank.
Pumps that spray reverse osmosis water for cleaning
DSCN0461.JPG
03/21/2023 10:35 AM
Photographer: Megan Zale
Facility processing area
No CBI
No PII
Pumps that spray reverse osmosis water for cleaning. Drains to sump 1
10 of 30
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
RO Water Pumps After Pickling Station
DSCN0463.JPG
03/21/2023 10:41 AM
Photographer: Megan Zale
Facility processing area
No CBI
No PII
Reverse osmosis water pumps after pickling station
Reverse osmosis rinse after electro-plating 03/21/2023 10:46 AM Facility processing area Reverse osmosis rinse after electro-plating
DSCN0465.JPG
Photographer: Megan Zale
No CBI
No PII
11 of 30
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
RO rinse after sodium dichromate deposition 03/21/2023 10:51 AM Facility processing area RO rinse after sodium dichromate deposition
DSCN0466.JPG
Photographer: Megan Zale
No CBI
No PII
Wastewater treatment process diagram 03/21/2023 10:56 AM Laboratory Wastewater treatment process diagram
DSCN0467.JPG
Photographer: Megan Zale
No CBI
No PII
12 of 30
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
SCADA Log for chemical spills or wastewater treatment issues
DSCN0468.JPG
03/21/2023 11:00 AM
Photographer: Megan Zale
Laboratory
No CBI
No PII
SCADA log for chemical spills or wastewater treatment issues
Sludge Press 03/21/2023 11:11 AM Wastewater Treatment Area Sludge press
DSCN0469.JPG
Photographer: Megan Zale
No CBI
No PII
13 of 30
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
Effluent sampler 03/21/2023 11:12 AM Wastewater Treatment Area Effluent sampler
DSCN0470.JPG
Photographer: Megan Zale
No CBI
No PII
Effluent sampler refrigerator 03/21/2023 11:13 AM Wastewater Treatment Area Effluent sampler refrigerator
DSCN0471.JPG
Photographer: Megan Zale
No CBI
No PII
14 of 30
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
Thickener (foreground) and clarifier (background) 03/21/2023 11:17 AM Wastewater Treatment Area Thickener (foreground) and clarifier (background)
DSCN0472.JPG
Photographer: Megan Zale
No CBI
No PII
EQ tank on right, cooling towers on left 03/21/2023 11:18 AM Wastewater Treatment Area Equalization tank on right, cooling towers on left
DSCN0473.JPG
Photographer: Megan Zale
No CBI
No PII
15 of 30
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
Clarifier with center well 03/21/2023 11:21 AM Wastewater Treatment Area Clarifier with center well
DSCN0474.JPG
Photographer: Megan Zale
No CBI
No PII
Thickener
DSCN0475.JPG
03/21/2023 11:21 AM
Photographer: Megan Zale
Wastewater Treatment Area
No CBI
No PII
Thickener (sludge from bottom of clarifier is pumped here)
16 of 30
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
Sand Filters 03/21/2023 11:22 AM Wastewater Treatment Area Sand filters
DSCN0476.JPG
Photographer: Megan Zale
No CBI
No PII
Flocculation tank 03/21/2023 11:31 AM Wastewater Treatment Area Flocculation tank
DSCN0477.JPG
Photographer: Megan Zale
No CBI
No PII
17 of 30
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
Neutralization tank
DSCN0478.JPG
03/21/2023 11:32 AM
Photographer: Megan Zale
Wastewater Treatment Area
No CBI
No PII
Neutralization tank (NaOH or dilute sulfuric acid added here)
Chrome reduction tank
DSCN0479.JPG
03/21/2023 11:36 AM
Photographer: Megan Zale
Wastewater Treatment Area
No CBI
No PII
Chrome reduction tank (sodium bisulfite used to reduce hexavalent chromium to trivalent chromium)
18 of 30
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
Additives
DSCN0481.JPG
03/21/2023 11:42 AM
Photographer: Megan Zale
Wastewater Treatment Area
No CBI
No PII
Additives. Contained spill would go to equalization tank.
RO tank 03/21/2023 11:43 AM Wastewater Treatment Area Reverse osmosis tank (10,000 gallons)
DSCN0482.JPG
Photographer: Megan Zale
No CBI
No PII
19 of 30
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
Well water tank 03/21/2023 11:43 AM Wastewater Treatment Area Well water tank (10,000 gallons)
DSCN0483.JPG
Photographer: Megan Zale
No CBI
No PII
Water softener tanks 03/21/2023 11:44 AM Wastewater Treatment Area Water softener tanks
DSCN0484.JPG
Photographer: Megan Zale
No CBI
No PII
20 of 30
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
Buffers for pH probe calibration at effluent sampler
DSCN0485.JPG
03/21/2023 11:47 AM
Photographer: Megan Zale
Wastewater Treatment Area
No CBI
No PII
Buffers for pH probe calibration at effluent sampler
Log at effluent auto-sampler 03/21/2023 11:48 AM Wastewater Treatment Area Log at effluent auto-sampler
DSCN0486.JPG
Photographer: Megan Zale
No CBI
No PII
21 of 30
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
Effluent flow sensor and temp sensor
DSCN0487.JPG
03/21/2023 11:59 AM
Photographer: Megan Zale
Wastewater Treatment Area
No CBI
No PII
Effluent flow sensor (large sensor) and temperature sensor (small sensor)
Weir for effluent flow monitor 03/21/2023 12:00 PM Wastewater Treatment Area Weir for effluent flow monitor
DSCN0488.JPG
Photographer: Megan Zale
No CBI
No PII
22 of 30
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
Effluent during plant operation 03/22/2023 09:24 AM Wastewater Treatment Area Effluent during plant operation
DSCN0489.JPG
Photographer: Megan Zale
No CBI
No PII
Blue liquid in floor drain system near effluent 03/22/2023 09:27 AM Wastewater Treatment Area Blue liquid in floor drain system near effluent
DSCN0490.JPG
Photographer: Megan Zale
No CBI
No PII
23 of 30
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
Blue liquid in floor drain system near effluent 03/22/2023 09:27 AM Wastewater Treatment Area Blue liquid in floor drain system near effluent
DSCN0491.JPG
Photographer: Megan Zale
No CBI
No PII
Stormwater outfall on facility grounds 03/22/2023 09:36 AM Facility grounds Stormwater outfall on facility grounds
DSCN0492.JPG
Photographer: Megan Zale
No CBI
No PII
24 of 30
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
Flowing liquid in stormwater pipe 03/22/2023 09:38 AM Facility grounds Flowing liquid in stormwater pipe
DSCN0493.JPG
Photographer: Megan Zale
No CBI
No PII
Manhole downstream of first stormwater outfall. Per Dave Bechtel, the black pipe is the water from outfall 001 and goes to the diffuser.
03/22/2023 09:45 AM
Facility grounds
Manhole downstream of first stormwater outfall
DSCN0495.JPG
Photographer: Megan Zale
No CBI
No PII
25 of 30
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
Significant flow from stormwater outfall pipe. Per Dave Bechtel, the black pipe is wastewater from facility effluent and goes to the diffuser in the Ohio River.
03/22/2023 09:48 AM
Outfall 001
Significant flow from stormwater outfall pipe
DSCN0497.JPG
Photographer: Megan Zale
No CBI
No PII
26 of 30
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
Significant flow from stormwater outfall (002). Per DSCN0498.JPG Dave Bechtel, the black pipe is the wastewater from facility effluent and goes to the diffuser in the Ohio River.
03/22/2023 09:49 AM
Photographer: Megan Zale
Outfall 001
No CBI
No PII
Significant flow from stormwater outfall
27 of 30
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
Effluent from stormwater outfall flowing toward DSCN0500.JPG river. Per Dave Bechtel, the black pipe is the water from facility effluent and goes to the diffuser in the Ohio River.
03/22/2023 09:56 AM
Photographer: Megan Zale
Outfall 001
No CBI
No PII
Effluent from stormwater outfall flowing toward river
Facing stormwater outfall from river. Outfall 002. 03/22/2023 09:58 AM Outfall 001 Facing stormwater outfall from river
DSCN0501.JPG
Photographer: Megan Zale
No CBI
No PII
28 of 30
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
Facing stormwater outfall from river. Outfall 002. 03/22/2023 09:58 AM Outfall 001 Facing stormwater outfall from river
DSCN0502.JPG
Photographer: Megan Zale
No CBI
No PII
Manhole upstream of stormwater outfall 03/22/2023 10:06 AM Facility grounds Manhole upstream of stormwater outfall
DSCN0503.JPG
Photographer: Megan Zale
No CBI
No PII
29 of 30
Ohio Coatings Co. Inspection Date(s):
03/21/2023 - 03/22/2023
Stormwater outfall integrator readout 03/22/2023 10:11 AM Facility grounds Stormwater outfall integrator readout
DSCN0504.JPG
Photographer: Megan Zale
No CBI
No PII
Stormwater outfall integrator readout
DSCN0505.JPG
03/22/2023 10:11 AM
Photographer: Megan Zale
Facility grounds
No CBI
No PII
Stormwater outfall integrator readout - says 0.22 feet per second