Methodology
Inventories The estimated replacement cost ol raw ma terials has been based on standard cost that approximates current cost. Finished goods and work in process have been estimated on the basis ol standard costs that approxi mate current cost and include current mate rial. labor, and overhead variances as well as an allocation of replacement-cost depreci ation of buildings, machinery and equipment determined on a straight-line basis.
Cost of Sales For those inventories accounted for on a' last-in, first-out (LIFO) basis, estimated re placement cost of sales, exclusive of depre ciation, was based on applying the UFO method of costing ending inventories ad justed for any decrements during the year. The turnover rate of inventories accounted for on a first-in, first-out (FIFO) basis is fast enough to approximate replacement cost. No attempt has been made to quantify the effects of improved efficiency or reduced op erating costs that might occur if manufactur ing facilities were replaced.
Property, Plant and Equipment in 1976. the estimated replacement costs for approximately 80%-85% of the Company's property, plant and equipment were devel oped on a functional pricing basis. This uses updated costs of recent applications of present-day technology. The estimated costs of replacing the remaining i5%-20% of total assets, where there has been little or no sig nificant technological obsolescence over the years, were appropriately indexed by year of acquisition at then-current price levels. After adjusting for changes in technology and additions and dispositions of productive capacity, the 1976 estimated costs were indexed using current price levels to arrive at 1977 and 1978 estimated replace ment costs.
Replacement-cost data have been pro vided for productive capacity represented by buildings, machinery and equipment used in mining operations. Since disclosure of the replacement-cost of mineral reserves is not required, depletion expense for mineral re serves has been included in the replace ment-cost data for inventories and cost of sales at the historical cost amount. Costs in
curred in acquiring mineral rights, leases or properties were related principally to the acquisitions of other businesses. These costs, which are included in depletable prop erties on the balance sheet and represent an expansion of the Company's productive ca pacity, amounted to Si5,330.000 and S4.425.000 m 1978 and 1977. respectively, in management's opinion, changing costs of acquisitions will result in corresoonding changes in revenues. Costs incurred in ex oneration activities and the development of ore bodies are not significant.
In addition, no replacement-cost informa tion has been provided for land and timberlands. as they are not consumed m the production process.
Accumulated depreciation of productive capacity at year end and the provision for depreciation for the year related to the re placement costs of such assets were calcu lated using straight-line depreciation rates based upon the estimated service lives and salvage values used for financial accounting purposes. This was computed by applying a general or specific index to year-end histori cal cost balances for cost and accumulated depreciation and then recomputing a ratio of accumulated depreciation to historical cost.
Timber The replacement cost of fee timber was de termined by estimating the reforestation cost to replace umber owned at December 31, 1978 and 1977. For those timber tracts that naturally regenerate atie selective or clear cutting, a cost per unit to manage the timber through a complete growth cycle was multi plied by the numoer ol units involved. For those tracts m Canada in which the Com pany starts the regeneration process, the estimated cos: of planting seedlings was added. Replacement cost of timber acquired by short-term agreements that entitle the Company to harvest the timber at its convenience during the following 12-18 months was deemed to be the same as historical cost.
Unit costs associated with the estimate of replacement cost of timberlands. determined as above, were applied to the amount har vested during 1978 and 1977 to obtain the replacement cost of timber harvested.