Document G5gDnzBynB72Kr1Yxrman7MLn
A n n i Sion
J. T. 3*11 . J. 1. Ccrdar
c. i. ;<3im
j. C. iandvshr H. t. Schults
t General Office*
Danns (1) B. Hodge* 3. Papageorge R. Savage
South Second St.
Other Locations
P. Macdonald Newport
B. w. Corlew vex
Anniston Plant
TECHNICAL SERVICES DEPARTMENT
MONTHLY REPORT
---------------------------------------------------------------------------------------------------------it-------------------------------------
S ummary
OCT 70
CONTIDETTIAL Read and Destroy
-_______________ , _ a4xx**"-asi
Aroclor loasea during Oct averaged 3#/d (405 ppb). Tour high daily value* (1000*4000 ppb) account for 1.8 lb./day neglecting thoee, October average ia 1.1 US./day. Actions now being taken to reduce upeeta.
c ' Althaea *atar taprovement CoMalaslon Contact*
A Meeting wa* held with the AKIC technical Staff. They were satisfied with the progress sad* at Anniaton on the ?C3 problae. Plant effluent levels will be reported non *iy.
Spill*
Cleaning out a plugged Mon tar druaout line caused son* to cpill on the floor which wa* absorbed in sand and cleaned up.
A leak in a chlorinator pn*p caused mm Aroclor to enter the rap where it was contained without leaving the department into tha plant waste sewer.
Projects t rrainations
1. Input data to define Magnitude of solid wests disposal problem was publlshg^ 1 n ncypbew. tacaf work has indi cated that Montar 5,; contains veryXlTtli PC3. If confirmed, this reduces PCS containing bulk solids by 10 M pounds per year.
2. Pr eelis approved for spent' carbon (containing PCB) collection and burial. Oltlaate disposal by incinera tion is present plan.
OSW 013900
CONHOtMTUt INtOIUATlOM
PLAINTIFF'S
exhibit
I a-V
HARTOLDMON0034558
Projects Evaluations - continued
2pC Lt,ic**. 3. Saaaval of avrrAs^from limastona pic Hh u
I ! t l _
by punping was succasafully demonstrated. This opens the
way co longer pic life by removal of solids during oparation of the pic.
Premise for rehabilitation of No. 1 limestone pic by 1/1/70 was approved in plane. Projeer preliminary estimate is J12M Capital, S2M Dismantling, and S26M Mechanical Expanse. This asciaaca will be reviewed and an AFE prapaxad in November. Cleanout work is prasanrly underway by pumping (saa 3 above) so ehac the usual PCB discharge Co Snow's Creak from pic cleanout will be minimised. Precautions fiail "V.ij'i. laiapaiaiy aapw.U i "nr high I are being taken to minimise PCS escape during limestone remove
5. Flow sheet developed for pilot clarifier intended to demonstrate removal of solida (with adsorb Aroclor) from limestone pit effluent. Premise and aatimata will be developed by mid-November.
.6 Approximately 300 gallons of liquid PCS was removed from department
sump after 2-1/2 months of operation.
'Skimmer* was successfully demonstrated with collected sens being vary high in PCS content (200K ppb). Approval was received to purchase.
:kd
'vT X. Kaupt
osy 013901