UNITED STATESUNITED STATES ENVIRONMENTAL PROTECTION AGENCY
* *REGION 1
ENVIRONMENTAL
AGENCY5 POST OFFICEB OSSTQOUN,A RMAE ,0 21S0U9-I3T9E12
100
PROTECTION
Date:Dated as shown on electronic signature(s)
Subj:Inspection Report
Clean Water Act - National Pollutant Discharge Elimination
System (" NPDES ")
SPS New England
DAMIANDigitally signed by
From:Damian Bednarz, InspectorDAMIAN BEDNARZ
Date: 2023.10.02 13:56:22
BEDNARZ
-04'00 '
Thru:Alex Rosenberg, Inspector
To: File
I. Facility Information
A. Facility Name:SPS New England
B. Facility Location:95 Behen Street
Everett, MA 02149
C. Facility Contacts: Greg Bashaw, Ship Captain
D. NPDES ID No (s).: NA, unpermitted
II. Background Information
A. Date(s) of inspection: August 16, 2023
B. Weather Conditions: 72 , cloudy
C. US EPA Representative(s):
Alex Rosenberg, Damian Bednarz
D. State / Local Representative(s):
NA
E. Federally Enforceable Requirements Covered During the Inspection:
40 C.F.R. 122.26-NPDES Multi - Sector General Permit (" MSGP ") for
Stormwater Discharges Associated with Industrial Activity (issued January 15,
2021, modified September 29, 2021)
F. Previous Enforcement Actions:
None known
ED_019088A_00003952-00001
III. Type and Purpose of Inspection
Evaluation
IV. Facility Description
SPS New England (the " Facility ") is a contract construction company staged in Everett,
MA. The Facility specializes in bridge, highway, transit, and marine construction
projects. Equipment necessary for construction projects are loaded onto barges and are
sent to the project destination. The Facility stages multiple tugboats and barges as well as
equipment on standby should a project require it. The Facility footprint is approximately
2 acres. To the west of the Facility is the Island End River, which flows into the Mystic
River located about 2,000 feet downstream to the South.
V. Inspection
EPA Inspectors Alex Rosenberg and Damian Bednarz (" Inspector Team ") arrived at
approximately 12 PM.
A. Opening Conference
Inspector Team was greeted by SPS Construction's ship captain, Greg Bashaw. Mr.
Rosenberg explained the reason for the inspection which involved an anonymous
complaint sent to EPA of a pressure washing operation resulting in paint chips escaping
the Facility boundaries.
Mr. Bashaw explained that SPS New England (the " Facility ") owns 5 tugboats and 5
construction barges, and that these vessels are maintained at a shipyard in Newburyport,
MA. About 20 feet away from where the Inspector Team was standing, one tugboat,
approximately 40 feet in length, was propped up on metal stilts and wood beams. Mr.
Rosenburg asked about the nature of the work being conducted on the tugboat. Mr.
Bashaw stated that a power washing operation was occurring on the tugboat's underside
to remove its paint in order to then repaint. The Facility had decided to conduct engine
work at this location at the same time, rather than the shipyard in Newburyport, because
of its relatively small size compared to the rest of the fleet. Mr. Bashaw explained that
power washing and engine work are not typical operations that occur at the Facility, and
that this work was temporary. Mr. Bashaw also mentioned that the Facility does not
conduct any kind of cargo loading or unloading, and that their main function was to load
equipment and construction supplies onto barges for various projects.
B. Facility Tour
The Inspector Team observed the propped - up tugboat with deteriorating paint on its
underside (slide 1, 2). Mr. Bashaw mentioned that the power washing operation is not
complete yet, and that the crew would return after their lunch break to continue working
on it. Red paint residue was observed on the pavement below the tugboat (slide 3).
Inspector Team also observed red colored water and paint residue flowing into a long
2
ED_019088A_00003952-00002
drainage channel covered by grates (slides 4-6). This same red colored water appeared to
be stagnant within the drain at the time of observation (slide 7). The drain system
continues towards the neighboring property beyond a chain - link fence (slides 10, 11) to
the North and then passes through a parking lot. To the South, the drain leads towards the
Facility storage areas (slide 12). The total length of this drain is about 800 feet from one
end to another.
Mr. Rosenberg asked about the purpose of this drainage system and where it discharges.
Mr. Bashaw stated that, based on his understanding, waters captured here are contained
under the concrete and do not daylight into the nearby river. Further, Mr. Bashaw stated
that he did not know about the capacity of the system, what organization manages it, or
how often the wastewaters are disposed of. He explained that all he knew was that the
system was designed to specifically capture waste that might seep from the remediated
superfund site over which the property is located, and that it is therefore permissible to
allow tainted waters, such as pressure waters, to enter it. Mr. Bashaw recommended
contacting the city of Everett to find out more about the drains.
Mr. Bednarz and Mr. Bashaw investigated the Facility boundary with Island End River.
Mr. Bednarz observed floating debris and particulates in the water (slide 13, 14) in
addition to paint chips of the same color as the tugboat's underside along the dock's edge
(slide 15). Mr. Bashaw stated that most debris found on the property are from seagulls as
they often drop clams from above to access the food inside the shells.
D. Closing Conference
Inspector Team and Mr. Bashaw had regrouped at the work trailer. The power washing
crew had arrived back on site from their break. One worker joined the conversation. In
discussion about work being conducted on the tugboat, he had mentioned that power
washing and blasting occurs infrequently. He recalled that he conducted painting and
blasting at some point in the last year when they renewed the seawall of the property that
is half submerged in the water.
Mr. Rosenberg explained that while power washing occurs, the Facility must implement
measures such as (berms and / or protective barriers) to ensure no discharge of pollutants
(wash water, paint chips or dust) is discharged into the river. Mr. Bashaw then instructed
the team of workers to put up a temporary barrier while the washing continued. The
Inspector Team did not see the installation of this temporary barrier while on - site.
Mr. Rosenberg explained the applicability of the MSGP permit Is based on the types of
exposed industrial activities that occur on site, and how conducting maintenance on
vessels might make the Facility applicable to Sector Q or Sector R. Mr. Rosenberg also
explained that an inspection report will be produced and sent to the Facility within 60
days of this inspection.
Inspector Team left the Facility and followed the followed the drainage system to the
North. No discharge point or outfall was observed however vertical open pipes were
present within the middle of the drain. Waters might drain through these pipes (slide 18).
3
ED_019088A_00003952-00003
There were two flow paths within the drain. One side was wet, and the other was dry.
Power wash water was draining to the wet side, and it is the wet side that connects to the
location with the vertical drain pipes. Mr. Rosenberg also noticed 3 manhole covers in the
Facility parking lot (slide 29) which might be access points for water management
infrastructure. In this area, Inspector Team also noted several dilapidated 55-gallon
drums which appeared to be full of liquid (slide 30). They were also visibly rusting from
the outside.
Inspector Team departed at approximately 1 PM.
Unless otherwise noted, this report describes conditions at the facility / property as
observed by EPA inspector(s), and / or through records provided to and / or information
reported to EPA inspector(s) by facility representatives and as understood by the
inspector(s). This report may not capture all operations or activities ongoing at the time
of the inspection. This report does not make final determinations on potential areas of
concern. Nothing in this report affects EPA's authorities under federal statutes and
regulations to pursue further investigation or action.
4
ED_019088A_00003952-00004