Document G5NMk6qRk3xBYvGe2a6Obo8v

FILE NAME Corning OC DATE 1958 DOC OC017 DOCUMENT DESCRIPTION Internal Report - Special Hazards Survey aise S SPECIAL HAZARDS SURVEY a PREPARED FOR ILLMECILMECHS HILLMSECHS DEVAMI H. J. BY F. K. SKL cx J. K. BOEURON April.25 and key 2 1958 _em, y Engineering Department SUFE INSURANCE INSURANCE aa ANOTHER PICTOH CATACAUGHT CATACAUGHT LUC OF CATACAUGHT Tenw ne@ : . ' ATNA KPwees ATNA AFFILIATED me wes ee me, L COMPANIES COMPANIES 42 0004.0! Hartford, Connecticut < EXHIBIT EXHIBIT ONES LES KAYLO DIVISION HOLIE HOLIE N. N. J. April 26 and May 2 1958 Purpose The purpose of this visit was to determine to dust in production operations the employee exposure Contacts Mr. F. W. Schl and the writer Harper Mr. Justice Personnel contacted 1. Pfeiffer Plant dr.mie dr.mie Director Mr. Production Superintendent Caesario Personnal Assistant SafetyDirector for Illinois Also present were Mr. Gardner Engineering Representative who ser, viacneds Mtrh.isPapullaSnhtoe E- na Safety Procedures Smith Air samples were taken using beth the starlard Greenberg- impinger and the midget impinger using isopropyl alcohol collecting medium Dust counts were made on as the procedure as outlined by the United States PubalilcigHhetalftihelSdefrovlilcaeding the Air : Sample I. 1 - Main Mxer Charging - Asbestos - taken at luval of the operator on his left aide 6.3 million particles per music foot of air the ; breathing Air Sample No. 2 Jydropulper Charging - taken at the to the right of the operator breathing lovel 4.0 million particles per cubic foot of air Air Sample 51.8 No. 3 - Horizontal Splitting Saw - taken at the of the breathing level . operator separating the pieces as they came through the DIT taken between the saw and the operator million particles por cubic foot of air Air Sample 46.3 No. 4 million Matware Finishing - Charging and leval of operator feeding flat ware particles per cubic foot of air taken at breathing to the trin smr . Air Sample Ib 5 - Flat vare - Finishing Turnover at Rubber - taken at ^' breathing level of operator * @ . 9.5 million particles per cubic foot of air ^' . 42.007 42.007 0002 . Air Sample 11.5 11.5 11.5 No. 6 - Packaging - Taken at the breathing between the two mon filling boxes million particles per cubic foot of air level midway Air Sample No. 7 - Router - taken at the ; level of the two men discharge end at the broathing pieces applying cloth wrapping to the . 16.3 million particles per cubic foot of air Air Sample No. 8 - Molded Pipe - Trim Saw B taken at of operator as he fed sav breathing level 5.1 million particles par cubic foot of air Air Sample No. 9 - Tubular Hold - taken at breathing level between the off and slitting sawB 9.5 million particles per cubic foot of air Air Sample No. 10- No. 2 Stripping Line - taken at breathing loval on right side of line to the left of the first operator 10.2 million particles per cubic foot of air Air No. - Sample 11 lelevveellCoarf mUennloading - taken in box car in breathing piling Kenite onto pallets . 20.0 million particles per cubic foot of air Air Sample No. 12 - Mixing ~ Tubular Mold - taken at while operator weighed out and breathing level batches mixed up two complete 7.5 million particles per cubic foot of air Discussion we would To like assist in the interprotation of the above dust counts of the dust to point out that the maximum acceptable which is 100 free silica or 100 asbestos concentration is particles per cubic foot of air siderably less than 100 free 5 million As we know that the dust hero is con- silica acceptable limits or 100 asbestos maximum for an operation generally of this has been established as 10 million particles from the air sampling type show that with reference to the above our results a mumber of the counts are above the _ . 42 007 0003 1 > the limits Air Samples Nos limits and several are closely approaching are acceptable as is also 1 and 12 which are the mixing operations Sample lk 2 did note that the bagged asbestos 129 While taking Air Sample No. 1 we This would help con- were actually dripping quite wet in fact some dust dam In discussing this siderably to keep the amount of asbestos plant had received a large shipment of asbestos thorughly the rains had thoroughly matter we found that this so that to store this outside asbestos . and it was necessary to wet down all bagged wet this material If it would be possible in the mixed we feel that the dust exposure would suggest that this before it is openewdouanldd be greatly reduced We mixing operations be considered is Air dangerously high count In the operation here -. No. 3 shows a a band ear the man removing the which the splitting of flat ware on dust is due to this handling of pieces separates the two pieces and the create too great a problem as the ware The band saw itself does not is working quite effectively it is equipped with a dust collecter which installed which will renove exhaust system should be He noted that the man We feel that an of this comessive dust from the breathing area Use of a respirator for wearing a respirator this operator was not this operation should be mandatory discussed shows a high ecunt also As in the operation but Air Sample No. 4 the dust is not due to a cading operation in the above paragraph The operator in placing the rather to a handling of the flat waro dust The smr collector flat ware on the line stirs up considerableHere again wo feel that an the itself appears to be working offoctively of the dust from should be considered for removal exhaust system breathing level of this man At the time of this visit this operator that this is essential for this work was waaring a respirator and we feal the threshold linite } <Th>e results of Air Sample No. 5 are approaching it leaves the No. 1 rubber ' At this point a men turns over the fat ware as off the flat ware dust The rubbers are a sanding operation which smooths loose Recently a brush was installed on the No. 1 rubber to remove to be quite effective from the top surface after sanding This appears at the end of the We did note that there had been an exhaust hookup If such wore belt of the No. 1 rubber and this was nroitghctobnneercteedducu edp still further this is connected we feel that the dust here and we feel that The man working here was using a respirater a desirable practice - 42 007 Ai,, r suple No. 5 was taken at the ' men ware placing the flat packaging of fat ware Hore two were in cartons Again the dust was due mainly to the handling handling operation be made for He would suggest that further removing dust fronths are as it studies Perhaps additional brushes here could cases off the No. 2 rubber mn on the line was eliminate most of this dust One man wearing respiratowresarfionrg a thirsesoppierraattoironW- e would like to see both . 7~ Our Sample No. 7 was teken at the three men were applying a cloth discharge end backing to the of the router whore sample here is above the threshold pipe covering Our due to the adhesivo linit but this high count nay be we noted that the parstpircalyesbehiandg applied to the pieces In our counting would indicate that the a tendency to bunch together which For this adhesive spray was also scoring on the reason we are not overly comerned with the count results hare Thisoperation Air Sample Ho 9 was taken at tubular mold is performed by one man who finishing on the sam there is also operates two smis Besides the collectors This fan was not running wearing a respirator a mall mhaust fan in back of the mashines during our test The operator here was not here might be With the exhmust fan in operation the counts to wear a resprierdautcoerd enough so that a man working here would not need A Air Sample No. 10 uns taken on the No. 2 count in only 10.2 million stripping line Although the that the amount of dust particles bare per cubic foot of air we feal to set is greater than shom We up our oquipment to get a true were not able breathing level of all men working here sample of the general There appears to be an forfodmust stirred up when the mids are broken and excessive amount sax We were told that open the ware removed system for this operation consideration We has been given to an extmust here but in the meantime we would feel very much like to see one installed were being used at this time respirators should be worn here lione ~\ handling In the box car bags unloading of Konite Air Sample No. 11 the men were dust here This is a form of free silica There bags due breaking to in the type of bag used by the shipper was considerable and also due to the car It would be desirable if be made with the suppliers to use arrangements could in the car so that a leakproof beg and to stack them they would not be broken by the rovement of the The men here were all all times for wearing respirators and they should be car this operation worn at a: 42 007 0005 j oD provided mixing We checked on the respirator program at this Ches not come up to Cans Illimis plant We find that it with standards The im are respiraters but they ching their o~-n filters In the departent we found e respirator in a carton dusty area Tho cover en a desk in quite a was not tight fitting and dust could in contaminating the respirator ib are scep propan be reviewed with the recommending that the respirator Illimis standards purpose of bringing it up to wot In discussing the ray program we find that to dust are given rays once production workers exposed every two years a year and for all other employees once rays are sent to Dr. Trido at Jaranac Lake for interpretation There has been no reported cases of either or asbuutosis at this plant silicsais . : Attached are a list of conditions at the recommendations which we feel would inprove plant and decrease the occupational disease exposure J.Lkobinson J.Lkobins:o:n form Lu | . 42 007 0006 ON ENDES KAHLO DIVISION HORLIN N. J. ro . . 1. A review should be made of the ftoolblroiwnigngit up to Chans Illinoipsresstaenndtarrdesspainrdatsohropurldogirnacmluidneotrhdeer A. Two respirators should be provided for to dust so that one each employee exposed sterilized while theroestphierraitsorbecianngbue sceldeaned checked and storage B. A clean duct cebinct should be provided for of respirators at some convenient place when not in use C. Somone should be assigned to handle this basis - possibly the plant muurse cleaning on a daily D. Respiratore should be worn in all dust include take at the producing areas which unloading box splitter charging of flat ware line cars molded stripping ware line and packaging of flat ware between rubbers on flat of 2. A study should be made in exhaust regard to the possibility installing systems in order to remove the excess dust from the breathing zone where flat ware is removed from the operator's flat waro is charged on the splitter where stripping operations finishing line and on the No. 1 and No.2 . ; 3. The section of extaust should be connected up at the end of the balt 4. Would suggest that consideration be cleaning system given for providing a vacuum of overhoed . to eliminate hand broom sweeping and blaring dom 42 007 0007 vt