Document G5GbQKKZrYdX5Lmyjr15rdko7

112 CHAPTER 7 1962 Guide And Data Boole Table I.... Unit Steam Consumption of Process Equipment* Kitehen Appliances Uxdwrr* of water beating) CotUMBpfion,b Lb per Hr P**8 He^&at Equipment Zonsump- Han,* lb Pflt per Hr pa'g Stock and vegetable kettles (per S gal) Vegetable steamers (per compartment) 8team tables (per sq ft) Bain-Maries (per sq ft) Coffee urns (per gaf) Water urns (per gal) Soup warmers (30 * 30 x 28 in.) Egg boilers (3 compartments) Clam, lobster, and potato steamers (per com partment) Oyster pots Plate and cup warmers (per 20 cn ft) Food-warming ovens (per 20 cu ft) Silver burnisher and washers Dishwashers (per tray) Leuadry Equipment Tumblers 40 x 94 in. 30 x 36 in. Washers, (per gal water heated) Flatwork ironers, 100 to 120 in. cnest type (per roll) 50 to 100 in. cylinder type (per machine) Standard presses Large shirt body presses Cun and neckband presses Seevers Steam-electric irons Woolen pressing machines Large--electnc vacuum Small--electric vacuum Large--steam vacuum Small--steam vacuum Feather cleaning and sterilising 15 pillows per hr 20.0 40.0 1.7 3.4 3.4 5.0 100.0 . 18.0 40.0 18.0 35.0 35.0 69.0 60.0 360 225 1 60 60-120 105 190 15 12 8 25 12 35 20 175 7-20 7-20 7-20 7-20 7-20 7-20 7-20 7-20 7-20 7-20 7-20 7-20 7-20 7-20 100 100 15-100 100 100 100 100 100 100. 100 65. 65 65 65 100 Sterilizers, for bottles or pasteurization (per ^ bottle) Sterilisers, for water, (per gal) Sterilisers, for instruments and utensils 8 x 9 x 18 in., water depth 3% in. 9 x 10 x 20 in., water depth 3K in: ' 10 x 12 x 22 in., water depth 4 m. 12 x 16 x 24 in., water depth 4 in. 10 x 12 x 36 in., water depth 4 in. 16 x 15 x 20 in., water depth* 10 in. 20 x 20 x 24 in., water' depth 24 in.' Sterilizers, for instruments @ 240-250 F 12 x 20 m. 14 x 22 in. 16 x 24 in. Sterilizers, for surgical supplies 10 x 20 in. 12 x 20 in. 14 x 22 in. 16 x 24 in. 16 x 36 in. 20 x 28 in. 20 x 36 in. 20 x 48 in. 20 x 60 in. Sterilizers, (autoclave) (240-250 F) 15.5 x 24 in. 17.5x28 in. 21.5 x 30 in. 24 x 38 in. . Disinfector, mattress 30 x 42 x 84 in. 60 x 66 x 108 in. Blanket warmers 18 x 24 x 72 in. \ 1 12 27 30 39 60 66 92 144 * 40 " 40 40 40 40 40 40 40 40 48 40 60 40 72 40 10 . 40 22 40 28 40 38 40 54 40 60 78 98 * 124 40 40 40 40 24 32 .40 42 40 40 40 40 42 35-60 318 35-60 4 35-60 From Dwtrict Hcotte* HnAart (National District Heating Anodatioa, Third V-dHioi. 1991). ^ Thee* nlati wpitwal approximate requirement* after warm-up period. be expensive or undesirable. Thin corrugated aluminum sheets or asphalt-saturated asbestos felt are available for covering the insulation on lines exposed to the weather. Such linos may introduce freeze-up problems, higher heat losses and, in many locations, would be considered unsightly 5. High-pressure transmission feeders may be employed where the plant is remote from the distribution area, or where it is desirable to augment the capacity of an gristing system Design of such feeders and of distribution systems for various load conditions is covered fully in District Heating Handbook. 3rd Edition.* 6. Piping routed in loops with suitable valves to provide . alternate feeds for. major loads, allows service to be maintained - despite .trouble in any one feeder.* 7. It is desirable to estimate as far as possible the probable growth and change in load centers. Since character of the dis trict served is almost certain to change with time the distribu tion system must be planned so that it can be adapted to accommodate changes. It is helpful to provide a mngfar dis tribution plan which can be revised from tiro* to tiTM to suit conditions as the system grows. Steam Distribution Pressure The pressure at which the steam is to be distributed will depend upon that available at the plant and pressure re quirements of apparatus to be served* The advantages of low-pressure distribution (2 - to 50 prig) compared with high pressure are: (1) lower heat loss per square foot of pipe surface; (2) lower losses from leakage, trap discharge, and venting; (3) less trouble with traps and valves; (4) less trouble from flash steam at drain age points; (5)' simplified problems in pressure reduction at the buildings; (6) suitability of standard fittings; and (7) general reduction in maintenance costs. Some heating companies find that the overall losses in relation to steam delivery are higher with high-pressure dis tribution. With distribution pressures not exceeding 50 prig, there is less danger if the full distribution pressure riiould build up in the radiators or heaters through the faulty operation of pressure-regulating valves. With pressures higher than 50 prig, or the safe working pressure of heating or process equipment, a second pressure-reducing'valve or some form of emergency relief is required to prevent exces sive pressures in the radiators or other equipment.* - Pressure reducing valves are more fully described in Chapter 6 (Steam Heating Systems). The installation of reducing valves on district steam installatiring however, may present specific problems that are not normally encountered in building steam beating applications. Utility companies in some instances must assume' greater responsibilities in their pisfrict Heating fQb|e 2___ Annual Steam Consumption for Water Heating for Various Types of Buildings, per Cu Ft of Volume*'* --------------Type of Budding CoAtvraptioa, Lb/iYr) (Co Ft] Ceawmpliea tb/(ft) (C ft) 000 F deg Teeep. tthe'af Water) Hotel Residence dub apartment house Department store Theater parting garage 3.20 2.56 2.41 0.95 0.85 0.57 ' 0.46 2.66 2.11 1.99 0.79 0.71 0.48 0.38 rnr-* fl amUy*b by fourteen dstoic* heating comp*met from motored m> BuOdinc volume i* approximate from volume. *From Di*ruA Hootint Handbook (National District Ba*tia Affodatioo, fbird Edition, 1951, p. M7). 113 Table 3 .... Load Duration for Typical District-Heating System (CimwJofi* Hewn of Mont Send-ovf per Year at Various loads Expressed ht Poteen! of Peak Hourly load*) Wonf Output % of Peak Hours per Year Meat Output % of Peak Hours per Year 100 5 55 1800 95 40 50 2200 90 40 3100 85 150 30 4100 80 300 20 5150 76 500 15 5700 70 750 10 6400 65 1050 6 8760 60 1400 * Baaed oo carre oo pace 9, District Btatinf Handbook, Third Edition, 1951. Note: A plant harlot Peak send-out at 100,000 lb per hr will aead out *0,000 (SO percent of 100,000) lb per hr or men tar 300 hr par yr. operation and maintenance and are often under regulations that are different for various cities. The advantages of high-pressure distribution are: (l) gnoiw pipe sizes; (2) availability of the steam for various other operations requiring higher pressures than the build ing heating system; and (3) wider flexibility in allowance for mriffliiTn pressure drop. Where distribution pressures are not as high as desired, higher pressures can be obtained by use of a steam compressor* It is sometimes desirable to install a separate high-pressure line from the boiler plant for steam supply to laundries or other high-pressure equipment rather than to operate the' entire distribution system at higher pressures. Pipe Sizes In district hating work it is common practice to design the piping system on the basis of pressure drop. The initial pressure and the minimum permissible terminal pressure are specified, and the pipe sizes are so chosen that the required amount of steam, with suitable allowances for future in creases, will be transmitted.without exceeding this pressure drop. The steam velocity is therefore almost disregarded and may be very high. Velocities of 35,000 fpm are uot considered high for pipes in conduits. Where pipes pass through build ings, however, consideration should be given to the pos sibility of.objectionable noise due to high velocity. By the use of permissible pressure drops with high velocities, after allowance has been made for future increase in-load, the pipe sizes may be kept to a minimum'with consequent savings in investment. Some lines in a loop system may need to be in. creased in size in order to handle reverse-direction flow in emergencies* The steam flowing through any section of the piping can be computed from a study of the hourly steam requirements of the several buildings served. In this connection, allowance should be made for the diversity of the load, that is, the ratio of the coincident maximum demand of all of the group of buildings served by the main, to the sum of the individual maximum demands of each of the buildings served. This ratio is known as the Coincidence Factor and varies from 050 in some institutional groups to 0.90 in areas where loads Me principally for heating and heat is turned on at about; th* same time each morning-. Consideration should also be given to the net total load on a line, based on a study of the loads in the various buildings,' in order to determine the* relative merits of providing one or more separate supply ' hues to serve all-year load3. Such lines will permit turning off the mains that supply strictly seasonal space-heating loads during the summer months. When lengths of pipe, steam quantities, and initial and terminal pressures have been chosen, the pipe sizes can be calculated by means of Figs. 22 to 26 of Chapter 6. The district-heating industry, however, uses C/nuan'a fonnula for determining pipe sizes because pressure drope can be de termined simply and directly from a chart. This formula has been checked by tests, and found correct within ranges of velocity used in district heating. A convenient chart de veloped from this formula is available from the National District Heating Association* Conduits for Piping Conduits for underground steam pipes are used to pro tect the pipe and insulation from external damage and to provide a space in which the pipe is free to expand or con tract while held in proper alignment; The conduit should be constructed of non-corrosivc materials, or, if of metallic content, should be suitably protected against corrosion. It must be of adequate strength to withstand the earth and traffic forces to which it will be subjected. The conduit should be reasonably waterproof and in many cases provision should be made to drain seepage from its inside. With any form of conduit unless it is actually below water level, provision should be made to completely exclude water or to carry away ground water and prevent it from collecting around"the conduit. This is often accomplished by placing a layer of coarse gravel or stone underneath and portly surrounding the conduit with one or two lines of tile having open joints which serve to carry the water to a sewer or other suitable outlet. Proper foundations should be provided to prevent settlement and to insure proper pitch of piping at ail times. Manholes may be required at intervals to provide access to valves, traps, and expansion joints. They should be drained. Some safe means of disposing of condensate.from piping should be provided. There are many types of conduits. They fall into six fol lowing general classifications: Box-type, Solid-pour, Pre fabricated, Tile, Monolithic, Granular Fused, and Water proof. Cross-sections of a few of the typical types are shown in Fig. 1. Box-type conduits are typical of those built with common materials and have many variations. Conduit A, Fig. I, shows a commonly used type in which a corrugated metal form is placed as an inverted U over the insulated pipe line in stalled on a concrete slab. The concrete may be reinforced