Document G58N5LND6Eqe8gdrXGjx5NQo4

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 5 77 WEST JACKSON BOULEVARD CHICAGO, ILLINOIS 60604 SUBJECT: FROM: THRU: TO: CLEAN AIR ACT INSPECTION REPORT Buckeye East Chicago, East Chicago, IN Jason Schenandoah AECAB (IL/IN) Nathan Frank, Section Supervisor AECAB (IL/IN) File BASIC INFORMATION Facility Name: Buckeye East Chicago Facility Location: 3823 Indianapolis Blvd. East Chicago, Indiana 46312; 400 E Columbus Dr. East Chicago, Indiana Date of Inspection: August 3, 2022 EPA Inspector(s): 1. Jason Schenandoah, Environmental Engineer 2. Meaghan Pashen, Environmental Engineer Other Attendees: 1. Jason Symington, Operations Manager, Buckeye 2. Mike Cuddy, Lead Terminal Operator, Buckeye 3. Ryan Janesy, Operations Manager, Buckeye 4. Ryan Kelley, Terminal Specialist, Buckeye 5. Dhaval Shah, Air Specialist, Buckeye 6. Nicole Brower, Senior Engineer, Envirospec Engineering 7. Sasa Dunovic, IDEM inspector Contact Email Address: RJanesy@buckeye.com Purpose of Inspection: Tanks inspection Facility Type: Terminal Regulations Central to Inspection: NESHAP BBBBBB Arrival Time: 8:30 am Departure Time: 12:30 pm Inspection Type: Unannounced Inspection Announced Inspection OPENING CONFERENCE Presented Credentials Stated authority and purpose of inspection Provided Small Business Resource Information Sheet Small Business Resource Information Sheet not provided. Reason: Not a small business Provided CBI warning to facility The following information was obtained verbally from Buckeye Personnel unless otherwise noted. Company Ownership: Ownership has not changed in the past five years, but the company changed from a privately owned company to a publicly traded company in 2019. Process Description: Buckeye East Chicago's facility is broken up into two portions, east and west, separated by a canal. The west portion operates several storage tanks containing gasoline, distillate, blend stocks, and propylene. Petroleum tanks are either domed external floating roofs (EFR) tanks or internal floating roof (IFR) tanks. Material in the west portion is transported into and out of the terminal via pipeline. The east portion operates several storage tanks containing gasoline, distillate, jet fuel, blend stocks, and butane. Petroleum liquids are stored in either EFR storage tanks, domed EFR storage tanks, or IFR storage tanks. The east portion also operates a 4-bay truck loading rack that distributes petroleum liquids; the truck loading rack vents to a vapor recovery unit (VRU) and has a vapor combustion unit (VCU) as back up emissions control. A 12-rail car loading rack is used exclusively for propylene. There is a portable VCU that may be used on the 12-railcar loading rack, but it is not currently used. Staff Interview: Stack tests and regular maintenance are conducted on the portable VCU to meet permit requirements. In lieu of using the portable VCU to control emissions from the 12railcar loading rack, gases are compressed in the railcar. TOUR INFORMATION EPA Tour of the Facility: Yes Page 2 of 4 Data Collected and Observations: A Forward Looking Infrared (FLIR) camera was utilized during the inspection to perform optical gas imaging (OGI) throughout the facility. Emissions were visualized exiting a vent on Tank 137, that contains diesel. Buckeye personnel stated that diesel was actively loading into Tank 137 while OGI was being conducted. Emissions were imaged coming out of a vent on Tank 209. Tank 209 is an IFR storage tank and stores gasoline. OGI of Tank 202 demonstrated that emissions were escaping from the seal on the EFR. OGI of Tank 801 showed emissions escaping from several locations around the seal of the EFR. OGI of Tank 806 indicated that emissions were escaping between the EFR seal and the guiderail. Photos and/or Videos: were taken during the inspection. A digital photo log is detailed in Appendix A of this report. Field Measurements: were not taken during this inspection. CLOSING CONFERENCE Provided U.S. EPA point of contact to the facility Requested documents: Last 5 years of annual seal inspections for Tanks 202, 801, and 806 Last primary seal inspections for Tanks 202, 801, and 806 Last out of service inspection report for Tank 209 Last API inspection report for Tank 209 Compliance Assistance: All OGI video footage was shared with Buckeye. DIGITAL SIGNATURES JASON Digitally signed by JASON SCHENANDOAH SCHENANDOAH Date: 2022.09.23 Report Author: _____________1_4_:56_:5_6_-0_5'0_0_' ____________ Section Supervisor: Frank, Digitally signed by Frank, Nathan _N_a_t_h_a_n_______1_6:_41_:1_1 -_05_'0_0'______________ Date: 2022.09.26 Page 3 of 4 Facility Name: Buckeye East Chicago Facility Location: 3823 Indianapolis Blvd. East Chicago, Indiana 46312; 400 E Columbus Dr. East Chicago, Indiana Date of Inspection: August 3, 2022 APPENDICES AND ATTACHMENTS 1. Appendix A: Digital Image Log Page 4 of 4 Facility Name: Buckeye East Chicago Facility Location: 3823 Indianapolis Blvd. East Chicago, Indiana 46312; 400 E Columbus Dr. East Chicago, Indiana Date of Inspection: August 3, 2022 APPENDIX A: DIGITAL IMAGE LOG 1. Inspector Name: Jason Schenandoah 2. Archival Record Location: ERC folder: Enf_BuckeyeEastChicago_IN_22_InspRep Image Number 1 File Name MOV_0464 Date and Time (incl. Time zone and DST) 8/3/2022 9:42 am * Latitude and Longitude Description of Image Accidental video capture MOV_0465 8/3/2022 10:07 2 am * Tank 137 emissions from vent IR_0466 8/3/2022 ** 3 Accidental photo MOV_0467 8/3/2022 10:55 4 am * Tank 209 emissions from vent MOV_0468 8/3/2022 11:04 5 am * Tank 202 emissions near EFR seal 6 MOV_0469 8/3/2022 11:11 Tank 202 emissions near am * EFR seal 7 MOV_0470 8/3/2022 11:26 Tank 801 emissions near am * EFR seal 8 MOV_0471 8/3/2022 11:28 Tank 801 emissions near am * EFR seal 9 MOV_0472 8/3/2022 11:29 Tank 801 emissions near am * EFR seal 10 MOV_0473 8/3/2022 11:36 Tank 806 emissions near am * EFR seal and guide rail * Digital image metadata was 5 hours off from actual image time and has been corrected in the table above ** Metadata was not preserved for this file Appendices Page 1 of 1