Document ExdLMmM3dLzNaXJLZ82kvDYaV
capco
CAPCO PIPE COMPANY, INC.
1400 Twentieth Strut, South * P. 0. Box
WILLIAM R. PERREU Vic* PrMldwit--S*l
January 22, 1987
/ ------------
City of Glendale Public Works Department 5850 W. Glendale Ave. Glendale, AZ 85301
Attention: Daniel V. Perna
Gentlemen:
I want to thank you for the opportunity to speak on behalf of the A/C industry at your recent specification meeting. By this letter I would like to reiterate my comments made at the meeting concern ing field cutting of A/C pipe. Field cutting can be accomplished today within the OSHA guidelines with all available methods, with the exception of the dry abrasive disc saw. Even this method is acceptable to OSHA when using the wet attachment.
However, with the introduction of the A/C Pipe Closure Unit last
year, field cutting has become a thing of the past. The new
closure unit puts to rest OSHA's concern of exposure due to field
cutting and machining of A/C pipe. When you eliminate the cutting
and machining, you eliminate the possibility of exposure. A/C
Pipe Closure Units are readily available from both CertainTeed
Corporation and Capco Pipe Company, Inc.
t
Based on this information, I would appreciate if you would revise the last paragraph on page 3 of your "Pipe Material Report" dated November, 1986, in order to clarify the field cutting procedure. It seems to me that "extreme safety precautions" is too strong a term for a product that can be used as safely as A/C pipe.
We in the A/C industry anticipate no interruption in the manufac turing and selling of A/C pipe from any governing agency and sincerely appreciate the City of Glendale specifying and using our product.
Very^fcrulv yottlrs,
/
WiTTiam Rr'perrell
cc: Jim Dusanko - Cement Asbestos Sales Co. Lloyd Ambler - CertainTeed Corporation
Quality Piping Materials
CTD028554