E. G. Leser March, 1980
Chambers Works Bldg. 770 1-1-1
DYES AREA EAST SPRAY DRYER NO. 1
Principle of Process
A slurry or solution of product is pumped to an atomizing nozzle. A stream of compressed air is impinged upon the liquid stream causing it to atomize. The droplets of material thus formed come in contact with a large volume of hot air and the water is flashed off. The dry product is separated from the air stream. The product is discharged to containers and the air stream is discharged to the atmosphere.
Reactions
There are no chemical reactions done during the drying step.
N32957
DUP050467516
E. G. Leser Marche 1980
OPERATING INSTRUCTIONS
DYES AREA EAST SPRAY DRYER NO. 1
SUBJECT:
BFtmmOH:
Chambers Works Bldg. 77.0, III-l
1
DUP050467517
E. G. Leser March, 1980
OPERATING INSTRUCTIONS
Chambers Works Bldg. 770 III-2
SUBJECT:
DYES AREA EAST SPRAY DRYER NO. 1
OPERATION:
D--9 - Dryer 3' diam. x 15' high, S.S. dryer body with conical shaped bottom. The flat top is externally cooled with water.
DC-1 - A 51 x 51 x 171 high enclosure which contains 4-18" x 196" "Nomex" collection bags. It has a conical bottom with a rotary air lock for discharging solids. It has a Roots-Connersville blower. Model 18-4 (POS), driven by a 3 HP, 550 V motor to furnish air to the traveling rings which dislodge solids from the col lection bags. The ring drive is powered by a 1 HP, 550 V motor.
FN-4 - Main exhaust fan, Zura Model 213, displaces 3,600 CFM. It is driven by a 10 HP, 550 V motor.
FN-7 - Combustion air fan driven by a 5 HP, 550 V motor.
H-27 - Atomizing air heater. Natural gas fired indirect heater for atomizing air at a rate of 54,000 cu. ft./hr. It can furnish about 750,000 BTU's per hour.
H--28 - Drying air heater. Natural gas fired heater furnishing . total combustion gases for drying air at approximately 150,000 cu. ft. per hour. It can furnish about 1 million BTU's per hour.
P-12A/B Identical feed pumps. Moyno Style 1,2x3 powered through a variable speed drive by a 1 HP, 550 V motor.
P-94 - Circulating pump. Worthington L-l/2" pump, 100 gal./min., powered by 10 HP, 550 V Motor.
T-36 - Loading tub. Nominally a 2,950-gallon, S.S. tub with single speed, 56 RPM agitation, driven through a gear reducer by 15 HP, 550 V motor. ,
T-54/T-86 - Identical feed tubs. Nominally 2,950-gallon, S.S. tub with twin speed agitation, 56 RPM and 28 RPM, driven through a gear reducer by 15 HP, 7-1/2 HP, 550 V motor.
)
Spill Procedure;
WEAR ROBBER GLOVES, APRON AND BOOTS WHEN CLEANING DP SPILLS. ANY SPILLS FROM THE PRESLURRY TANK, FEED TANKS OR DOST COLLECTOR SHOULD BE HOSED TO THE DITCH WITH WATER. IF SPILL IS SIGNIFICANT (75 LBS.), CALL EXT. 555 - WASTE WATER TREATMENT PLANT TO REPORT (SEE OPERATING PROCEDURE NO. 28).
AU-2 *6t R2
DUP050467518
E. G. Leser March, 1980
OPERATING INSTRUCTIONS
SUBJECT:
DYES AREA EAST SPRAY DRYER NO. 1
OPERATION:
Chambers Works Bldg. 770 III-3
Loading Feed Tanks
1. Check T-36 to be sure valves under tank are closed and tank is clean.
When charging T-36, use funnel.
Supervisor-Production must check cleanliness of tank.
When direct loading T-54 or T-86, use screen.
2. Measure a small amount of water into tank, T-36 (Approximately 250-300 lb.). Turn on agitation.
Do not use any water if milled slurry is to be used. If material to be loaded has settled, bucket off the liquid into the tank, using this liquid in place of the water.
3. Load by shoveling and/or dumping material as called for on the lineup card. Record all amounts of material loaded.
Agitation can be helped if the tank is hooked up to recirculate and pump is started. WEAR GLOVES IN HANDLING.
4. Agitate and recirculate until a smooth slurry is obtained. Sample as called for. Obtain sample from recirculation line. Adjust pH as called for on line-up card.
See sample list and line up card for samples to be taken.
5. Pump charge from make up tank (T-36) to feed tank (T-54 or T-86) through the manhole screen (agitation must be on in feed tanks).
Omit this step if feed tank is loaded directly, as in the case of milled products.
6. After charge is in feed tank, rinse out make up tank with no more than 250 lb. of water and pump this to the feed tank.
7. After feed tank is loaded, dry dip tank, record on log sheet and sample to GAL for Gross Solids. Record dry dip and gross solids?on line-up card.
Mark sample to GAL - "No Unusual Hazards".
**" ..v*
2361 R2
DUP050467519
E. G. Leser March, 1980
OPERATING INSTRUCTIONS
SUBJECT:
DYES AREA EAST SPRAY DRYER NO. 1
OPERATION:
Chambers Works Bldg. 770 III-4
8. Wash out line with water to ditch.
Close valves under tank T-36 and vat wash the tank if required.
See Operating Instructions "Vatting Procedure" for method of vatting tank.
U-2361 R2
DUP050467520
E. G. Leser
March, 1980
OPERATING INSTRUCTIONS
Chambers Works
Bldg. 770 III-5
SUBJECT;
DYES AREA EAST SPRAY DRYER NO. 1
OPERATION;
Startup from Shutdown
1. Hook up proper feed line to P~12, A or B.
Hook up return line to same feed tank then start the feed pump P-12A or B.
Be sure the feed is circulating and returning to the feed tank.
It will take 5-12 minutes for feed to return to tank when starting up an empty system.
The feed controller TC-209 should be set on manual with at least a 9 psig output.
2. Close all explosion and access doors in D-9 and DC-1. Turn on water to cooling water reservoir on top of D-9.
Doors should be closed tightly to prevent air leakage.
Water must be turned on reservoir to prevent possible V. / fires in the dryer. Visual inspection should be made
that water is flowing from the reservoir by observing the discharge to the floor.
3. Place an empty drum on scale and start air lock.
Mark down the tare weight on the Produce and Ship ticket.
4. Remove demister* pad, wash it up well with water and replace.
5. If proper action does not take place in the following steps, see alarms and interlock sheet for probable cause and cor rective measures to be taken.
Turn on FN-4 exhaust fan.
Greer light on starter switch should go on. Blue d/p should raise to about 11 inches. This d/p measures the pressure difference across the spray dryer and dust collector.
J-2361 R2
DUP050467521
E. <3. Leser March, 1980
OPERATING INSTRUCTIONS
SUBJECT:
DYES AREA EAST SPRAY DRYER NO. 1
OPERATION:
Chambers Works Bldg. 770 III-6
6. At least one minute after starting FN-4, start positive air blower and ring drive.
There is a one minute time delay to ensure that the whole dryer system is purged.
The green lights on the start buttons should go on and the up-down orange light should change every 26 seconds to indicate that the ring drive system is working.
7. Start FN-7 combustion air blower. PS-206 set at 10"
Starter button's green light goes on. Alarm light PA206 goes out.
8. Open natural gas valve.
Starter button's green light goes on when valve is open.
9. Open atomizing air valve.
The pressure indicator should register and the alarm light PA-211 should go out.
10. Start H-27 (atomizing air burner). Turn controller to "manual" operation and move burner controls set point to 3 psig (0 C ).
11. Push start button on H-27.
This actuates the spark plug and a green light above the starter button.
12. After about 5-10 seconds, a green light should show on the start button and the alarm light WA-205 goes out.
Hold start button in for about 15 seconds, after the burner is lit.
13. If the green light does not show after 15 seconds, release the start button.
Three or four starts may be necessary when starting a cold burner. Wait for 30 seconds between tries.
If after'3 or 4 tries, there is still no green light, cal1 supervision.
1-2 41 R2
DUP050467522
E. G. Leser March , 1980
OPERATING INSTRUCTIONS
mi
SUBJECT:
DYES AREA EAST SPRAY DRYER NO. 1
OPERATION:
Chambers Works
Bldg. 770 III-7
14.
After the burner is lit, move the burner's set point up until the controller's output is 9 psig. Then switch to seal position, line up control point and indicator tempera ture. Then switch to automatic and move pointer to set point.
See list of Drying Control Set points for specific product being dried.
15. Follow Steps 9-13 to light drying air burner H-28.
When bags are to be dried after clean up, use only Steps 9-13.
16. As the temperature of the mid point of the dryer approaches the set point, switch controller 209 from manual to auto matic and open slurry feed valve.
Green light on slurry feed valve starter button will light when valve is open to dryer.
The set points for the temperatures of atomizing air, drying air, and mid point of the dryer designated as "slurry temperature" are given on the Special Instructions.
17. Adjust the following safety shut down points - 208, 212, 216, 308. (See list of drying control set points).
After the feed has been established, the red d/p (213) should start to climb. Normal operation is 2 to 4 inches. If above 4 inches, contact supervision. This d/p measures .the pressure difference across the dust collector.
18. Check drums on scale to be sure material is coming through unit.
19. If trouble develops during this procedure, contact foreman and check alarms interlock sheet.
J-2361 R2
DUP050467523
E. G. Leser March, 1980
OPERATING INSTRUCTIONS
SUBJECT:
DYES AREA EAST SPRAY DRYER NO. 1
OPERATION:
Chambers Works Bldg. 770 III-8
Normal Operation
1. Follow instructions given on the instruction sheets.
See also the line-up card. This card will indicate any hazards involved in handling individual products.
2. Maintain temperatures on burners and dryer as instructed.
Check lineup card and list of Drying Control Set Points. {III-l7)
3. Check hourly for dust losses at the stack by visual inspection of the stack discharge. Note condition of stack discharge (clean or not clean) on the DP Chart with the time of observation.
The dryer should be shut down when a dust loss is evident. Most of the products are very expensive. Dust losses are a source of atmospheric pollution.
4. Keep a check on the instruments to be sure the dryer is operating properly.
5. Replace the drum on scale when it is full.
6. As drums are being filled, add the specified amount of anti dusting oil if called for.
7. Label, tag, and head each drum immediately.
Include on parrel label, net weight, code nos. of pro duct, name of product, barrel number and hazards. Also tape a paper label on inside of drum.
8. Maintain an adequate supply of clean dry drums.
Be- sure the drums are stored in a safe manner.
Do not use wet drums.
9. Maintain the Produce and Ship ticket up to date.
-25 I R2
DUP050467524
E. G. Leser March, 1980
OPERATING INSTRUCTIONS
11 m
SUBJECT:
DYES AREA EAST SPRAY DRYER NO. 1
OPERATION:
Chambers Works Bldg. 770 III--9
10.
At the beginning and end of the shift, record the events of the shift on the shift log sheet. Dry dip the tanks and record.
Check weigh scale at beginning of each shift.
Be sure to note unusual occurrences in detail. Leave information on needed repairs, malfunctioning equipment, etc.
11. Keep the area clean and trash picked up.
The panel board must be kept clean and dry at all times.
1-2361 R2
DUP050467525
E. G. Leser March, 1980
OPERATING INSTRUCTIONS
SUBJECT:
DYES AREA EAST SPRAY DRYER MO. 1
OPERATION:
Chambers Works Bldg. 770 III-10
Shutdown
1. When the feed stock level is within I inch of the feed tank's outlet, wash down the tank using less than 100 lb. of water.
This will clean the tank and lessen the product loss.
2. Repeat Step 1 using up to 500 lb. of water.
3. As the output of slurry controller decreases, indicating that the wash water is reaching the nozzle, turn off the following in this order by pressing the stop buttons:
a. H--28 drying air burner b. H-27 atomizing air burner c. Atomizing air
d. Natural gas valve e. Combustion air blower FN-7 f. Feed pump P-12 A or B (only after lines have been
thoroughly flushed).
As each part of the system is shut down, the appro
priate alarm will sound. Shut off P-12 A or B if the tank is empty.
DO NOT RUN P-12-A or B DRY.
4. After the unit has cooled down (drying air below 100C, midpoint of dryer below 50C), open the atomizing air valve.
This is doije to cool down atomizing air heat exchanger without overheating the spray dryer.
5. After unit has cooled down, turn off atomizing air, ring drive, positive air blower and FN-4.
6. Check barrel on scale.
If there is a hang-up in bags, ;he barrel will fill rapidly when FN-4 is shut down.
FN-4 must be locked out by the Supervisor-Production before opening the unit.
7. Open dust collector doors and shake bags. Pack out all product. Then* turn off air lock.
?61 R2
DUP050467526
E. G. Leser March, 1980
OPERATING INSTRUCTIONS
SUBJECT:
DYES AREA EAST SPRAY DRYER NO.. 1
OPERATION:
Chambers Works Bldg. 770 III-ll
Cleanup
1. Check dryer and dust collector to be sure there are no hang ups of material.
If hang ups are found, contact supervision.
2. Place special cleaning funnel under air lock. Turn on air lock.
This is done to protect the scale from excess water.
3. Turn on the hot water to the bags.
This puts water on the inside of each bag. Be sure doors are closed on dust collector.
4. Turn on hot water to the dryer.
This puts a water spray on the inside of the dryer. Be sure doors are closed on dryer.
NOTE: Steps 3 and 4 above can be done simultaneously or independently. Check Orders.
5. Disconnect the recirculating line fron the feed tank. Allow line to discharge to the floor.
6. Start to fill the feed tank to be cle med with water (turn on agitation).
Be sure to Check this tank. Con :inue to clean this tank by use of a vat. See Vatti lg Procedure, "Ponsol" Area Special Instruction No. 35.
7. Chain off door to loading room.
8. Check valves under feed tank to be sure they are closed. t
9. Disconnect feed tank from P-12-A or B.
10. Wash out flexible feed line. Inspect it to be sure it is clean.
11. Place running;water hose into suction side of P12-A or B.
12. Start P-12-A or B.
This will wash out line from P-1' to floor of loading room. Green light on starter burton should go on.
1-2361 R2
DUP050467527
F
E. G. Leser March, 1980
OPERATING INSTRUCTIONS
Chambers Works Bldg. 770 III-12
SUBJECT:
DYES AREA EAST SPRAY DRYER NO. 1
OPERATION:
13. Start FN-4 exhaust fan.
If FN-4 does not start, see Alarms and Interlock sheet for probable cause and corrective measures to taken. The green light on FN-4 switch should go on. The blue d/p should go to 11 to 12 inches of water and the red d/p should go off scale (above 5 inches)
14. At least one minute after starting FN-4, start positive air blower and ring drive.
The green light on the starter buttons should go on and the up-down orange light should change every 26 seconds.
15. Open atomizing air valve.
The pressure indicator should register and alarm light FA-211 should go out.
16. Open by-pass 209 by turning switch to ON.
This will allow water from P-12 A or B to enter the dryer thereby cleaning the valve and feed line to the dryer.
17. After 10-15 minutes, close Bypass 209 and close Bypass 227.
This adds more water to the dryer and helps to clean it faster.
18. Stop P-12-A or B and pin it out.
19. Drain feed line.
20. Reverse flush the feed line.
21. When discharge from dust collector is colorless, open Bypass 227.
Turn off hot water to dryer and bags. Make sure switches are both off on both the 1st and 3rd floors to the hot water system.
A J-2361 R2
DUP050467528
E. G. Leser March, 1980
OPERATING INSTRUCTIONS
SUBJECT:
DYES AREA EAST SPRAY DRYER NO- 1
OPERATION:
Chambers Works Bldg. 770 111-13
22. Open and inspect the following to see if unit is clean.
a. Doors on dryer
b. Inspection ports in duct work: - one on second floor the other at end of duct on first floor. If unit is still dirty, clean with high pressure water before continuing.
DSE CARE IN HANDLING HIGH PRESSURE WATER.
c. Open the port in the cone of the dust collector. If this requires that a man enter the cone to clean it by hand, use the tank entry procedure. Obtain an air system for human consumption, an alarm horn, a stand-by man. Tag and lock out FN-4, the ring drive, air lock, tag the dust collector doors and the wash valves to the dust collector. Remove the air lock blades. Loosen the hold bands from the bottom of each bag. Slip the bags off their sleeves. Tie the bags together so all four sleeves into the cone are open.
PRIOR TO ANY ENTRY INTO THE DOST COLLECTOR. PUT A PLANK ACROSS THE DOORS AND UNDER THE RING DRIVE TO PREVENT THE RING DRIVE FROM FALLING IN CASE OF MECHANICAL FAILURE.
Call for a standby man before proceeding. Enter the cone through a bag sleeve. Clean the cone by hand. When the cone is clean, climb back into the dust collector through the bag sleeve. Replace the bags and clamps. Replace the air lock blades. Remove the locks and tags. Shower and change clothes.
d) Remove demister pad, wash it up well, and replace.
23. Start FN-7 combustion air blower.
Starter button's green light goes on. Alarm light PA206 goes OUT.
24. Open natural gas valve.
Starter button's green light goes on.
25.
Start No. H-27^ (atomizing air burner). Turn controller to "manual" operation and move burner controls set point to 3 psig (0C).
This puts burner in low fire position.
AU-2361 R2
DUP050467529
E. G. Leser March, 1980
OPERATING INSTRUCTIONS
Chambers Works Bldg. 770 III-14
SUBJECT:
DYES AREA EAST SPRAY DRYER NO. 1
OPERATION:
26. Push start button on H-27. This actuates the spark plug and a green light above the starter button.
27. After about 5 to 10 seconds, a green light should show on the start button and the alarm light WA-205 goes out.
Hold start button in for about 15 seconds after the burner is lit.
28. If the green light does not show after 15 seconds, release the start button.
Three or four starts may be necessary when starting a cold burner. Wait 30 seconds between trials.
If after three or four tries, there is still no green light, call supervision.
29.
After the burner is lit, move the burner's set point up until the controller's output is 9 psig. Then switch to seal position, line up control point and indicator tem perature. Then switch to automatic and move pointer to set point.
30.
Do not exceed 300C as a set point.
Continue drying out the bags for 5 to 10 minutes after the red D.P. has leveled off at 1/2 to 1 inch.
31. Turn off H-27 by pressing stop button. The alarms should sound and indicate as the equipment is shut down.
Shut natural gas valve. Stop FN-7.
32. Allow unit to cool down. (TC-209 below 50C). Then turn off atomizing air, ring drive, positive air blower and FN-4.
33. Have FN-4 locked out and inspect the unit. If either dryer and/or dust collector are dirty, contact supervision.
34. If no bag change is required, have FN-4 unlocked and proceed with next operation.
U-2361 R2
DUP05046753Q
E. G. Leser March, 1980
OPERATING INSTRUCTIONS
SUBJECT:
DYES AREA EAST SPRAY DRYER NO. 1
OPERATION:
Chambers Works Bldg. 770 III-15
35. If the next product to be dried is not dispersed, precoat the dryer and the dust collector as follows:
a. Lock out FN-4 and open dryer doors.
b. Coat the inside o the dryer with Marcarb N solution. Be sure to cover the inside of the door. Close the dryer doors. See the separate Operating Instructions for the Marcarb N System.
c. Remove the southwest bag from the lower dust collector ring. This gives access to the duct and dust collector hopper.
d. Coat duct and hopper of dust collector with Marcarb N Solution. Refasten the bag. Unlock FN-4.
e. Dry out the unit by using hot atomizing air (See III-5, Shutdown to Operation, Steps 2 thru 14).
iU-2'161 R2
DUP050467531
f E. G. Leser March, 1980
OPERATING INSTRUCTIONS
SUBJECT:
DYES AREA EAST SPRAY DRYER NO. 1
OPERATION:
Chambers Works Bldg. 770
III-16
Cleaning with Bag Change
1. Do Steps 1 through 34 of Cleaning System.
2. Open Dust Collector doors. Be sure all four doors are open.
Wear a disposable respirator when entering the dust collector.
3. Loosen hold bands from bottom of each bag. Slip bag off sleeve.
4. Lower platforms and push bars into place, at upper doors.
5. Loosen and remove hold band from top of a bag. Lift the bag off the hooks on sleeve. Then remove bag from unit. Fold and place in wash drums and send to laundry for cleaning.
6. Repeat Step 5 on the remaining three bags.
7. Secure bags to be hung from storage.
8. Place a bag on rail and put over sleeve. The hooks on the upper sleeve must go through the grommet to prevent bags from falling.
9. Allow bag to hang to bottom of dust collector. Replace hold band and tighten.
10. Repeat Steps 8-9 for the remaining three bags.
11.
Pull Lift both ring
platform rail against side of dust collector wall. up platform and fasten to rail. This must be done to platforms. Platform must engage interlock switch or drive will not operate.
12. Slip bottom of bags over sleeves and fasten with hold straps.
13. Close all doors in dust collector.
14. Do Steps 34 and 35 of Cleaning System if they apply to the next product.
j
All ?361 R2
DUP050467532
E. G. Leser March, 1980
OPERATING INSTRUCTIONS
HI SUBJECT:
DYES AREA EAST SPRAY
DRYER NO. 1
OPERATION:
Drying Control Set Points
Chambers Works Bldg. 770 III-17
Condition Atomizing Air Controller 205
Drying Air
I
400 C to
450C
450 C
Slurry Control 209
J TC-208
TC-212
TC-216
TC-308
95 C to 115 C
475 C
120 C
85C
625C
L 270 C
P 270C
S 350C
LC 270C
300C
80 C to 85 C 350C 95C 80C 625C
300 C
375C to
400 C
270 C
80 C to 85C
85C to 90 C
78C
350C
450 C 350 C
95C
100C
95 C
a
o
in
CO
80 C
80 C
625 C
625C 625C
J-; 3*1 R2
$
DUP050467533
E. G. Leser March, 1980
OPERATING INSTRUCTIONS
SUBJECT;
DYES AREA EAST SPRAY DRYER NO. 1
OPERATION:
Chambers Works Bldg. 770 III-18
Type of Product
Slurry Sample
2nd Barrel Sample
% Moisture
Intermediates I
1 pint prior to drying for G.S.
-
Every two hours
"Latyl" Disp. Crs.
L
1 pint prior 4 oz. to
to drying for lab. for
DPT G.S.
D.P.T.
Once per shift.
4 oz. to lab. for A.I.
"Ponsol" D Pdrs.
P
1 pint prior to drying for Gross Solid
4 oz. to lab. for Cloth Test
Once per shift.
"Sevron" S S
1 pint prior to drying for Gross
Solids
-
Once per shift.
Dry Composite
1 qt. to GAL
1 gt. to Gene Childs
1 qt. to GAL for D.T.
1 qt. to GAL.
Note;
Slurry sample should be taken just prior to drying, the dry dip must also be taken at this time and recorded both on log card and sample label.
2361 R2
DUP050467534
Cham bers W orks
B ld g . 770
111-19
a la rm lig h ts s h o u ld be checked d a ily to assure b u lb s a re w o rk in g .
oo
CM
1
SB
pc
CO 00
ss 0 ,o
CM Hl-1M.4
CM I SC
CM| EC
CM l SC
t-CM 1
'V p S3
ki P p
a
SC X!
x
0 g G G c to m
rH s s & s p
P
o o o op
0)
CD
0
c o o t3 o
p
-p
<
CO CO co w CD
0 r-l
0 r--1
PP
+i P
P 3 S3 p P
X3 Jp X! x! JP
CO CO CO to CO
04 e o u
04 E O U
CD
P
P
CO
0) CO
CO CO
CD
Eh P
<0 p
P
G P S3 SH p P
o P -P Oi p P
a) IB IB (0 (B
iB
P O Eh P XJ P
P
CO E 0 O (0 0 tn CO
CO
WP
01 cu 04 01 H Or
Q4
o IB o r--!
s
01 0)
E co
0) E
E CO
<0 E
01 X! CO
E CO Oi
E CO
3
<
o
r-l
P Eh 04
IB p CB pH 1--1
0 Pp 04 0
Q 04 Q
P
EC Er P P p <W
P XI
P
EH S3
o
s 0
0 >
O
0 s>
O
& 0
S 0
0 01 & > H O
CO >
M s PI O 3 0 Ss PI p i 0 PI 0
0E
p iB
CD
CO p 4-H 0
0
tn
EpP P
P
P
iB --i P
IB P CO
P CO
P 01 01
3 (0 P p id
(B x: 0
& G CO p P
CD
p E P P CO (0 IP Or *H
& (0 CO 3 0, 01 Or Q a
0
e p X!
(0 E
l--! u
p
P p CD P p P
P rH
3 p P -H Oh -p O 0 O
1 <=c
X5 rH rH iB
PpP
P (B CO 10 O 0 O CO
H p P p
G <B rH CO CD CO p
cB
G rH rH an < iB
Cn tn 0 G H
tn N H rH rH 3 N rH rH rH p
Cn E
H rH -P i-H O 0 0 0 id
G 3 o>. & N N CO id G 0 0 0 p
H 1--1
Ua P H
G H 'rH E
rH E
P X!
p P
O
p
p
0 P Cu
O ttl >i ip 0 O E -P (0 10 CO co E
O Cl p P -M P O IB CO 3 3 3
U H Q Cl < < U Z IP a a Q Eh
SC Pi
II
CM CO rtf u~> VO r~- oo to CO UD
P O O "3* 0 in 0 0 0 l-H rH rH
G CN CN CM O CN CM CM CN CM <N CM
rH * 1 1 CM
CN 1
1
1|1
faO < < <
1<
1
i < <
rt < <
Or at EH & Eh 12 a Oh EH Or a Eh
CD G O O
0) P IB
oo CM
SC
ns G to
t"
CM
I SC
co
P
<i>
c u p
XI
G
CL)
IS
xs P G o
e
t3 co
M
V <u x: o
CD
u <B
co
o o
rH
p CD P g w
IB c
o B Ss 04
E. G. Leser M arch, 1980
DUP050467535
*B o th a to m iz in g a ir and d ry in g a ir o v e r te m p e ra tu re in te r lo c k a re b y-p a sse d fo r two m inutes a fte r each re s p e c tiv e gas b u rn e r s ta rtin g b u tto n is re le a s e d .
m
U
o E2 o
TO Is-
P r o X CM E CD 1 itUH X rH H O ffl H
l-l O
Q)
P
XX!
CD
H
o
P
pi
i
PTO
Ep
p
CD p
P rl
X
O
+1 (!)
>i P P1 +1 p 1 H P 1 X -H X * *1-1 rH TO CD o3P o EP hQiWO PP Mm 3 P P TO P 3 3 O Cq-H
Q <W CO U
*
Is- iP as (x, -3
3 P P 3 Qj TO E TO 4J M Pi P
&0-- >0
rH VO
O'
OO--3
P CM o <* H *
H-OO 3 *0
TO3 CM CM 3
O' -- 3
333 PO O -H -H p rH
H 3 3P
P 3 -H O
CO 3 O* O 3 Is-
3 3 3 0) O
X *H *3* CO
E P IPP i i
o o p a>
o c a to
ft*
. p3 X3 p
rH
pO P 31
PTO 1
>1 PP
P O H Px
>1
P >H
P >H
P1
1 P
1
to
xH
-wP
*0 E *w
rH "rH o>
0P 3 P
u rH 0
p Q)*P
P3 ffl O X TO c v-t p TO
M
3 n &rH
cq 0 to O
1
p
P 3)
*O O
--3
CD P
O P :0
CM ? 3
--3
PP
P3
x 3
>i
P rH
P 3
X -H X
0
3 rH
-H P H
-H O
pP
3 CD H P 3 as
.p
P N O'
*H 3
o. e OVH
E 0 3 Sp
p H H
p Apx
p Is- P CO
CM CM
> 1 0) 1
O ffi o a
v*--s. --* r-- .
*
rH N M rH CN CO ** rH <N 00 rH CN CO
*
Po CO to C\
rH
X -
si U
P as
TO
a a m a
op
-rH EH rH
0) X
p
0 3
i--i rH *H S
P 3
X
P
P +i rH W
X!
3 rH 0 ir-H
P "iH
Eh
r<N 1 EG
p
P
pTO
P
O
3
rH rH -rl
P
3 M
3
X
TO
tD
P rl 3
5 CD O 3X H tp TO
PP X3
X CO TO
CM
1P ao
P
O
pp
rH Jp
p O) x
ffl X
X
p ip
0
3p o
rH 3
rH
H t-H s rH
H
ps
3 X
P rH P
>
P
TO X
3
rH 3=
rH P O H X s EP
P TO 03 P P CM 3 3 1 rH X K CO TO
DUP050467536
to M 0
o to r~ M r0 rH x cm g co i 3 *d M
HH u mh
MO 3 co 03 CP 3 rH PI
43 CD CJ
M 3 ia e
CO Mo 3 CM >t --M H 'C 0) O
i--I
0 3 IQ O l-H CP 0c
-rl
<u N 0) CP tSJ CP M OM 3 C < X 43
O a o to a> i -- "H 0) -H VO T3 ip >d rH
CM
X
0 (3
m a>
oo X <0 O -H
0) ft rH
X (0 M 3 S' o
X O c
3 a) a) >- c gun C
CP O'
3 M MM 3 fi 0 -H M a c
CO 3 3 P M ft H O
a) w rH
3 X 4.) +> 0 O G X s c c
3 3 3 3 -p
dX O o e d
u M M M O 03 3 W d rH 3 3
a) a> a) a) m M 3
XI M M
ft ft ft.-! o
03 10
E g g rH o X 6 3 x X
3 # o O d M > o . O
x XX O
COO H c c
M 4-1 X
M CM M M X 3 vf 4 +) rH sr M1
3 rH 3 3 Jm
1 03
IQ
l
1
> CM > > P M O O O'OQ
0 OH ft a ft
O ft
aft
a ft
CP c H C S 3 M
X O c
si* '1 a ft >
3
M
3 r~ -P Q)
I a) > a m iH ft ID rd
--a >
3 M `P
rH E rH 3 CM X
CO fd
to w
o
0) M
3 fern rH
M 0 > (d
ft rH o Ip
n 2
% * u 4->
0 -- Mo
cd
HIOHO Z &
O 3 CM -- ^ C
M CM
Lf) m
P -- Oi M o U C
3 d -H CM 3 d
CP-H 3 --- EQ 3
aCN
OM
0 -M -H tJi+) H
H C E C C O X
+> C o -rl -H O
M 3+! N OP fl
3 M 3 -rH fto X E ro ^
E X 3 OX 1 1
O 0 O X 3 >S U C P3 < 3 ft ft
,,~u .
_ __
*%
ft rH N fO ^ rH CM CO rH rH rH rH rH CM CO IT)
D o
u
zC
H3
EH 0
o d
o in
Xm
x 3
43
ft 03
PI
mM
o0
oft 3
Eh X 3
M
3
ft O
X 0 c
rH rH rl
s
M 3 S O rH
X
3c rH o X rH 3X Oo M3 EH w
1 z
c
X
s CO
M
o ft
3
o o M X
X O M 03
3 f3 03
0
X >X
X
3 OM d 0
X 03
d o 3 1--1 X
3 M
c
cn 4H W
rH
UX
X rH
O
3 MX
O H
X0o d s
X3c
M 3
M
S 0
1--i
r-H rH
M 3
X
O rH rH
H
C
03 X rH & M
X Js
3
X MX
t-~ X
O
3 3 r~
o
d X Cp l CO 03
IQ Z 1 3
rH
X ft
t
CP
rH X 0
ft
H 0 c a
M
s ed3
H
3X > 3
M rH U
rH
3 S
rH M H M M
3 >
CP dd
o rH 3 H
rH 3 03 - N O
X 3 d c 3 d H T3
> CP o & Cp g
rH d r! 0
O o to
t> M H x *d rH rcj X X
rH *d N CD 3 3 3
X H
rH
CP E
3W XX
M 03 3X
X r~ to
CO d O B 3 X 3 CM
fOt
H
ft
X >3
OX CJ 03
3X Z 03
1M XO
DUP050467537
E. G. Leser March, 1980
DYES AREA
n"PONSOIi** SPRAY DRYER
MATERIALS DRIED
Chambers Works Building 770 III-22
All of the following materials are SKIN & RESPIRATORY IRRITANT.
SKIN & RESPIRATORY IRRITANT is to be stenciled on each drum of material discharged from the spray dryer.
"ACETAMINE" SCARLET B CR. S.D. 1-AMINO-2-BROMO-4--HYDROXY AQ S.D. 1--AMINO--2,4--DIBROMO AQ S.D. "CAPRACYL" ORANGE R CR. S.D. "CAPRACYL" YELLOW 3RD CR. S.D. DEHYDROTHIO--p-TOLUIDINE SULFONIC ACID DEHYDROTHIO--p~TOLUIDINE SODIUM SULFONATE 1,4-DIAMINO-2,3-DICHLORO AQ S.D. DU PONT METANIL YELLOW CR. S.D. "HALOPONT" BLUE RNM DISP. CR. J ACID UREA S.D. LEUCO-1,4-DIAMINO AQ'. S.D. "LITHOSOL" RED 2B ACID "LITHOSOL" RED 4B ACID "SEVRON" YELLOW 3RL CR. S.D. "STYLACYL" BLUE RP CR. S.D,
007-220-2000 044-208-2000 045-015-2000 119-620-3000 119-620-3000 193-500-4600 193-251-4600 204-660-2000 288-720-3000 399-430-3000 424-164-2000 437-110-2000 459-180-4600 459-200-4600 873-101-3000 893-850-3080
DUP050467538
E,, G. Leser March, 1980
OPERATING INSTRUCTIONS
SUBJECT:
DYES AREA EAST SPRAY DRYER NO. 1
OPERATION:
Chambers Works Bldg. 770 XII-23
"These Operating Instructions have been issued after a
full review of current technology and building experi
ence as of
(date), and conform with the
current process technology as recorded".
(Author's signature) (Technical signature)
Author
Sr. Supervisor-Production
Sr. Supervisor-Technical
Production Superintendent
l acs #226DM
<
3-/P-fo Date Date 2 - Zo -$a Date Date