Document ExEG2V5xpnNOjG4x5GazRD97L
AR226-2641
AR226-2641
DuPont Modeling M ethodology and Results
DRAFT
Shimizu Site June 2003
About the Model
I Industrial Source Complex Short Term 3 (ISCST3) I Sold/used globally, including in Japan
http://www.phoenix-r.co.jp/products/products.htm
I Input
l Stack height, diameter I Flowrate, temperature I Mass of pollutant (kilogram per hour) I Local meteorological data (Shizouka 1997, 98, 99)
1 Output
l Ambient air concentrations in ug/m3 I Max values and locations outside the property line
Prevailing wind
ai i i w i
Facility
Vapor reaches ground level Ambient annual ground level concentration in ug/m3
Model Calculations
I Ambient air concentrations based on Gaussian Equation
I Concentration a function of a vertical term and a dispersion term
I Vertical term based on stack height, receptor elevation, plume rise, mixing
1 Dispersion parameters describe distribution of pollutant in lateral and vertical
Shim izu M odeling Inputs Stack Param eters
Source ID
2 3 4
Description
Location
Operations
Beiahi. m
Diameter, m Flowrate m3/hr
Pre-scrubber exit for Tine powder
Operates 24 hours
scrubber (called *AC Scrubber* on mao)
D Plant
per day. 180 days per year
8
0.68
2400
Post-scrubber exit for fine powder
Operates 24 hours
scrubber (called `A C Scrubber* on
per day. 180 days
mao)
D Plant
per year Operates 24 hours
15
0.6
9600
E Plant: copolymer per day, 270 days
D BC Scrubber
plant for P F A and F E P
per year
18.2
0.6
1620
M P-2 building:
Operates 24 hours
M P-2 scrubber
copolymer type micro- per day, 200 days
oowder
per year
16.1 10.6 assumed
7500
/
' S7*----- ^ /
(1) Given in email o f 4/17/03 from Hie etaka Hiromatsu: 600 s a mm square diameter. Converted to effective diameter of 0.66 meters.
Temp
100 c
40-50 C 40 C
40 C assumed
Correct stack height?
Shim izu M odeling Inputs Em issions Rates
Source ID i
Description
iPre-scnibber exit for fine powder scrubber (called "AC Scrubber 1 on map)
Location D Plant
Emission Rate, Emission kg/hr Rate, g/s
0.24
0.0667
iPost-scrubber exit for fine powder scrubber (called "AC 2 Scrubber" on map)
D Plant
0.24
3 DBC Scrubber
E Plant: copolymer plant for P FA and F E P
0.07
0.0667 0.0194
4 MP-2 scrubber
MP-2 building: copolymer type micro-powder
0.125
0.0347
Prelim inary M odeling R e s u lts
I Maximum annual concentrations calculated as 14 ug/m3
I Point of maximum concentration at south boundary of site (on property line)
Contribution of Sources
: Source ID i1
i2
:3
I4
Description i Pre-scrubber exit for fine !powder scrubber (called ;"AC Scrubber" on map) IPost-scrubber exit for fine jpowder scrubber (called j"AC Scrubber" on map)
^
Location D Plant D Plant
Contribution,
Height, m
ug/m3
Contribution
8
7.002!
50
15
3.345:
24
!DBC Scrubber ;MP-2 scrubber
E Plant: copolymer plant for P F A and F E P
MP-2 ixiilding: copolymer type micro-
18.2 16.1
2.953
0.771 total = 14.071
21 5