Document Ex7xnZLNY0QjZnkeM2n8vdKax

f erfyt, a*u CttemauzS- INC. CSCAM6IA PLANT INTEROFFICE MEMORANDUM To: E. A. Ray From: W. C. Wilde Re: Personal Monitoring for VCM Exposure at Pace Plant Date: {Dictated 3/29/74) April 2, 1974 Copies: yJ. T. Barr T. L. Carey R. Fleming*/ J. D. Kramer A. K. McMillan E. A. Primeau G. B. H. Speed R. R. Speigelhalter M. Sterraon Since 3/19/74, fifteen 8 hour samples for VCM exposure have been taken. The average of all of these samples is 20 ppm. Ten of the samples were on utility operators, and the average of these was 23 ppm. The highest reading was on a utility operator and was 44 ppm. The highest reading on one of the other operators was 32 ppm on the reactor operator, and the lowest reading was 2. 5 ppm on a maintenance mechanic. Nine extra batteries and three extra battery chargers were received. At that time the Calvert City plant had not received any of the extra batteries they had ordered, so three of the batteries were shipped to them. With the extra batteries and chargers it has been possible to get two, 8 hour samples per day. This uses the batteries only three hours per charge. We will try to get four hours per charge from the batteries, and if this is possible it will allow getting three samples per day. M. Stermon stated that they were getting four hours per charge at Calvert City. The samples that have been taken thus far have been for periods ranging from 6 hours and 40 minutes to 8 hours* In all cases the sampler was put on and started in the change room/laboratory building and stopped and taken off in the same building. The person being sampled was never in the PVC plant without the sampler on. If the exposure levels were for 8 full hours in all cases they would be slightly lower than those listed. WCW/jc Attachment c vt'<M W. C. Wilde AP00005921 E. A. Ray Operator's job Title Operator's NanSe -2Date Sampling Time Start Stop April 2, 1974 Shift Taking Sample TWA VCM Levels Utility* Martin (Carrol) 3/19/74 7:00 am 2;45 pm 7-3 B" 33 ppm Utility Berry 3/21/74 3:00 pm 10:30 pm 3-11 "C" 8 ppm Utility* Berry 3/22/74 3:00 pm 10:30 pm 3-11 "C" 18 ppm Utility* Jones (Carrol) 3/23/74 7:00 am 2:00 pm 7-3 "A" 43 ppm Utility* Berry 3/23/74 3:00 pm 10:00 pm 3-11 "C" 21 ppm Utility Kirkland(Carrol) 3/24/74 7:00 am 2:45 pm 7-3 "A" 5 ppm Utility* Berry 3/24/74 3:00 pm 10:30 pm 3-11 C" 44 ppm Utility* Kirkland(Carrol) 3/25/74 7:00 am 2;00 pm 7-3 "A" 19 ppm Utility Berry 3/24/74 3:00 pm 10:30 pm 3-11 "C" 12 ppm Utility Kirkland (Carrol) 3/26/74 7:00 am 2:00 pm 7-3 "A" 31 ppm Recovery Bott 3/26/74 3:00 pm 1 0:00 pm 3-11 "B" 12 ppm Reactor Curry 3/27/ 74 7:00 am 2:00 pm 7-3 "A" 32 ppm Finishing Boatwright 3/27/74 3:30 pm 10:30 pm 3-11 "B" 13 ppm Maintenance Kent 3/28/74 7:00 am 3:00 pm Day Worker 2. 5 ppm Sr. Operator Liggett 3/28/74 3:20 pm 10:00 pm 3-n b" 9 ppm ^^Fart of sample may have been lost. May be up to 10 ppm. * Operator inside a Reactor AP00005922