Document Ex6j63g9B2EBdYQwdDw621MQj

DownloadRandom document
j For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandards(a)naw. mil. NAVSEA PROJECT DATA SHEET (PDS) Date: MM/DD/YV PHASE 1 - PROJECT INITIATION AND PLANNING Project #: 1. Project Identification Project #: 2. Applicability: Check EH Project Title: PEO Carriers PEOLCS PEO IWS applicable box(es) PEO Subs/SEA 07 3. This project relates to: Check applicable box(es) EH EH PEO Ships/SEA 21 SUBSAFE Secondary Plant/SEA 08 Interest EH N/A 4. Type of Project: Check applicable box. See Appendix C (PDS Instructions) fo r descriptions. 1.0 Risk and Cost Reduction (RCR) 3.0 Technical Standard or Process (Document) 1.1 Cumbersome Work Practice (CWP) 3.1 Documentation for Ship Cost Reduction (DSCR) I I 1.2 Commonality (CMN) EH 3.2 Technical Tool (TT) I I 2.1 Critical Unfunded Technical Authority Role (TAR)____I I 4.0 Technical Authority Program Management (TPM) EH EH EH EH EH5. Project Classification: Unclassified FOUO NOFORN Confidential Secret N ote AA/A The content o f this PDS shall be kept unclassified. 6. Project Points of Contact Role a. DWO (or Group Director) b. TWH (or Technical Leader) c. EM Name Activity & Code Phone ###-###- Email Address d. LE e. POC (if other than LE) f. Task Manager g. HQ Program Manager h. HQ Project Manager 7. Project Summary (Briefly tell the storyfo r this project in a way that allows customers and other engineers to understand its importance.) a. Task Summary: Discussion (for SEA 05S use only) 1 of 13 US00006082 For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandards(a)naw. mil. NAVSEA PROJECT DATA SHEET (PDS) PHASE 1 - PROJECT INITIATION AND PLANNING Project #: 7. Project Summary (Briefly tell the storyfo r this project in a way that allows customers and other engineers to understand its importance.) - Continued b. Work to be Performed by Each Performing Activity (add more/delete as necessary)'. (1) Performing Activity #1 - ITWH's (or Technical Leader's) Business Unit Codel (2) Performing Activity #2 - TPA and Codel (3) Performing Activity #3 - TPA and Codel (4) Performing Activity #4 - ITT Exelis Assist Project Manager and Tech Chain with project processing, technical editing, format and content compliance reviews, and other related tasking as described in the PDS for TPM-002. c. Previous Work/Market Analysis: d. Concurrent Efforts: e. Future Efforts: f. Customer Demand Signal for this Project: g. Transition of Project Results to Fleet User: 8. Describe the expected improvements in the following (improvement statements)'. a. Relevance: b. Safety: c. Currency: d. Cost-Effectiveness/Retum on Investment (ROI): e. Commonality: Discussion (for SEA 05S use only) 2 of 13 US00006083 For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandards(a)naw. mil. NAVSEA PROJECT DATA SHEET (PDS) PHASE 1 - PROJECT INITIATION AND PLANNING Project #: 9. Approximate Time to Complete (in months): 10. Deliverables and Schedule: Go to Aooendix A for 1.0, 1.1, 1.2, 2.1, 2.2, 3.1, 3.2, and 4.0; Go to Aooendix B for 3.0. 11. Total Project Cost ($K): $ K 12. Performing Activities (PAs): a. PA #1 (always TW H 's or Technical Leader's Business Unit) cv. (1) Perlbrmer N aim - N o t e >1/': I f mission-funded, complete only p in k cells; otherwise, complete (1) through A c t i v i t y A ( ode Phone E m a i l Address EH EH<2) Role in Project: (3) Source of Funds: SE/TA OMN Mission Funding lapprov manhours: EH) Other, describe: (4) Activity Points of Contact for ERP Liaison Name Activity & Code Phone Email Address Technical #1 Financial #1 Technical #2 Financial #2 (5) Planned Funding Requirements - Detailed Budget ($K) Quarter A Quarter B Quarter C Quarter D Quarter E Quarter F Quarter G Quarter H Total Funding Plan ($K ) Labor ($K ) ODCs ($K ) Travel ($K ) # Man Years (o.oo) (6) Approved Funding - Detailed Budget ($K) FY FY 1st Q 2nd Q 3rd Q 4th Q Total 1st Q 2nd Q 3rd Q 4th Q Total M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y 111111111111P M M /D D /Y Y PM Initials PM Initials PM Initials PM Initials PM Initials (7) Obligated Funding - Detailed Budget ($K) FY 1st Q 2nd Q 3rd Q 4th Q Total 1st Q M M /DD/YY PM Initials 2nd Q M M /D D /Y Y PM Initials FY 3rd Q M M /DD/YY PM Initials 4th Q Total M M /DD/YY PR# Fund Doc # M M /D D /Y Y PR# Fund Doc # M M /D D /Y Y PR# Fund Doc # M M /D D /Y Y 1 M M /D D /Y Y PR# w m PR# w' F und D oc # Fund Doc # M M /DD/YY PR# Fund Doc # M M /D D /Y Y PR# Fund Doc # M M /DD/YY ! lllll PR# Fund Doc # Discussion (for SEA 05S use only) 3 of 13 US00006084 For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandards(a)naw. mil. NAVSEA PROJECT DATA SHEET (PDS) PHASE 1 - PROJECT INITIATION AND PLANNING Project #: b . PA # 2 N o t e >1/': I f mission-funded or other, complete only p in k cells; otherwise, complete (1) through (5). (1) Perlbmier N om e Activity & C ode or C ontractor Phone Eninil A ddress <2) Rule in Project: i ' i Source olTiiiui: EH SI. 1 A ( ) \ I \ EH M i s s i o n F u n d i n g l a p p r o v M a n h o u r s : EH) O l l i e r , d e s c r i b e : (4) Activity Points of Contact for ERP Liaison Name Activity & Code or Contractor Phone Email Address Technical #1 Financial #1 Technical #2 Financial #2 (5; Planned Funding Requirements - Detailed Budget ($K) Quarter A Quarter B Quarter C Quarter D Quarter E Quarter F Quarter G Quarter H Total Funding Plan (SK ) Labor ($K ) ODCs ($K ) Travel ($K ) # Man Years (o.oo) Prime Contract # ( 6 ) Approved Funding - Detailed Budget ($K) FY FY 1st Q 2nd Q 3rd Q 4th Q Total 1st Q 2nd Q 3rd Q 4th Q Total M M /DD/YY M M /D D /Y Y M M /D D /Y Y M M /DD/YY PM Initials PM Initials PM Initials PM Initials ( 7 ) Obligated Funding - Detailed Budget ($K) FY 1st Q 2nd Q 3rd Q 4th Q Total M M /D D /Y Y PM Initials M M /DD/YY PM Initials M M /D D /Y Y PM Initials M M /DD/YY 1 1 1 1 1 1 1 1 1 1 PM Initials FY 1st Q 2nd Q 3rd Q 4th Q Total M M /DD/YY PR# M M /D D /Y Y PR# M M /D D /Y Y PR# M M /DD/YY M M /D D /Y Y PR# 1 1 1 1 1 1 1 1 1 1 1 1 PR# M M /DD/YY PR# M M /D D /Y Y PR# M M /D D /Y Y 111111111111P PR# Fund Doc # Fund Doc # Fund Doc # W,Fund D oc # Fund Doc # Fund Doc # Fund Doc # Fund Doc # iiiiiii Discussion (for SEA 05S use only) 4 of 13 US00006085 For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandards(a)naw. mil. NAVSEA PROJECT DATA SHEET (PDS) PHASE 1 - PROJECT INITIATION AND PLANNING Project #: c. PA #3 (1) Performer Name Activity & Code or Contractor Phone Email Address (2) Role in Project: (3) Source of Funds: SE/TA OMN Other, describe: (4) Activity Points of Contact for ERP Liaison Name Activity & Code or Contractor Phone Email Address Technical #1 Financial #1 Technical #2 Financial #2 (5) Planned Funding Requirements - Detailed Budget ($K) W, Quarter A Quarter B Quarter C Quarter D Quarter E Quarter F Quarter G Quarter H Total Funding Plan ($K ) Labor ($K ) ODCs ($K ) Travel ($K ) # Man Years (o.oo) Prime Contract # (6) Approved Funding - Detailed Budget ($K) H FY FY 1st Q 2nd Q 3rd Q 4th Q Total 1st Q 2nd Q 3rd Q 4th Q Total M M /DD/YY M M /D D /Y Y M M /D D /Y Y M M /DD/YY PM Initials PM Initials PM Initials PM Initials (7) Obligated Funding - Detailed Budget ($K) FY 1st Q 2nd Q 3rd Q 4th Q I M M /DD/YY W m w. PM Initials Total 1st Q M M /DD/YY PM Initials 2nd Q M M /D D /Y Y PM Initials FY 3rd Q M M /DD/YY 1 PM Initials 4th Q Total M M /DD/YY PR# Fund Doc # M M /D D /Y Y PR# Fund Doc # M M /D D /Y Y PR# Fund Doc # M M /DD/YY W m w. M M /DD/YY PR# PR# Fund Doc # 'W . w Fund Doc # M M /DD/YY PR# Fund Doc # M M /D D /Y Y PR# Fund Doc # M M /DD/YY m m m m , PR# Fund Doc # WWWk.', d. PA #4 (1) Performer Name (2) Role in Project: See 7.b(_). (3) Source of Funds: Kl SE/TA OMN (TPM-002) Activity & Code or Contractor ITT Exelis 1H1W Phone Email Address Discussion (for SEA 05S use only) 5 of 13 US00006086 For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandards(a)naw. mil. NAVSEA PROJECT DATA SHEET (PDS) PHASE 1 - PROJECT INITIATION AND PLANNING Project #: 13. Distribution List for Project Coordination: a. Performing Activity POCs PA # Name Activity & Code or Contractor Email Address Project Intermediate Project Initiation Review Circulation MM M b. Reviewers Name SIB Distribution List R&SE Competency Distribution List DoD ASSIST Reviewer List for Document/LSC/Area QPL Suppliers/Applicants NECO Notice NSRP Shipyards ITT Exelis Activity & Code or Contractor Email Address Project Intermediate Project Initiation Review Circulation Discussion (for SEA 05S use only) Note: Asterisks indicate critical response needed. Reviewer must provide a positive response during project circulation before the document can proceed to publication. 6 of 13 US00006087 For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandardsQinaw. mil. NAVSEA PROJECT DATA SHEET (PDS) PHASE 1 - PROJECT INITIATION AND PLANNING Project #: 14. Project Initiation and Planning Concurrence a. TWH (o r T e c h n ic a l L e a d e r) Name: b. Task Manager Name (optional): C. DWO (o r G ro u p D ire c to r) Name: Date: MM/DD/YY Date: MM/DD/YY Date: MM/DD/YY P 5 M H Email PDS comvleted to this point to commandstandardsQi)navv.mil to reauest Project Initiation. d. Project Manager Name: Date: MM/DD/YY Place on R&SE Tracker O Yes O No 15. Project Initiation Circulation (7 days) a. Start: MM/DD/YY Due: MM/DD/YY b. Were comments received? 1 1 Yes, date of comment resolution: MM/DD/YY c. TWH (o r T e c h n ic a l L e a d e r) Approval of Comment Adjudication (name): (only if PIR comments were received) O No Date: MM/DD/YY S l l M H Email PDS completed to this point to commandstandardsQinaw.mil for SEA OSS approval to proceed to Execution. d. Project Manager Validation of Comment Adjudication (name): (only i f PIR comments were received) 16. Validation of Project Plan and Approval to Proceed to Phase 2 - Execution Program Manager Name: I f SE/TA OMNfunds ARE NOT needed, notify TWH (or Technical Leader), EM, and LE o f \ / approval o f the project plan and approval to proceed to Execution. Date: MM/DD/YY Date: MM/DD/YY Date: MM/DD/YY / sea i k \ I f SE/TA OMNfunds ARE needed, notify TWH (or Technical Leader), EM, and LE o f approval o f / action/ p roj ecfp ian a n ([placement o f the project in the hopperfo r funding consideration. Date: MM/DD/YY Discussion (for SEA 05S use only) Note: Asterisks indicate critical response needed. Reviewer must provide a positive response during project circulation before the document can proceed to publication. 7 of 13 US00006088 For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandards(a)naw. mil. PHASE 2 - EXECUTION NAVSEA PROJECT DATA SHEET (PDS) Project #: 17. Approval for Intermediate Review TWH (o r T e c h n ic al L ead er) Name: Date: MM/DD/YY 18. Intermediate Review a. Performing Activity POCs PA # Name Activity & Code or Contractor Concurrence Date MM/DD/YY MM/DD/YY MM/DD/YY MM/DD/YY MM/DD/YY ITT Exelis MM/DD/YY b. Intermediate Reviewers Name Activity & Code or Contractor Concurrence Date MM/DD/YY MM/DD/YY MM/DD/YY MM/DD/YY MM/DD/YY MM/DD/YY MM/DD/YY MM/DD/YY 19. Concurrence and Submittal of Project Deliverable(s) for Project Circulation a. Validate adjudication of Intermediate Review Comments. b. Update project summary and expected improvements (Blocks 7 & 8) in Phase 1 - Project Initiation and Planning. c. Attach draft project deliverables. d. Attach List of Changes (LOC) with rationale (for existing 3.0projects only). e. Attach this PDS. f. TWH (o r T e c h n ic a l L e a d e r) Name: Date: MM/DD/YY m RPPV^I Notify SEA 05S that project is ready to proceed to Project Circulation andprovide project deliverable(s) and PDS to W0KKK commandstandards(a)naw.mil. 20. SEA 05S Validation of Proper Coordination and Readiness to Proceed to Phase 3 - Finalization a. Project Manager Name: b. Program Manager Name: Date: MM/DD/YY Date: MM/DD/YY Discussion (for SEA 05S use only) 8 of 13 US00006089 For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandards(a)naw. mil. NAVSEA PROJECT DATA SHEET (PDS) PHASE 3 - FINALIZATION Project #: 2 1. Project Circulation a. Project Circulation Type EH GIR Full (45 days) GIR Limited (30 days) SIB 14-Day R&SE 14-Day b. Start: MM/DD/YY Due: MM/DD/YY EHc. Were comments received? Yes, date of comment resolution: MM/DD/YY No 22. Comment Adjudication a. Validate all comments have been properly adjudicated, resulting changes have been agreed to by the appropriate technical authorities, reviewers, and customers, as applicable; all necessary concurrences have been received; project is complete; and associated document(s) is(are) ready to publish. b. TWH (o r T e c h n ic a l L e a d e r) Name: Date: MM/DD/YY c. Task Manager Name (optional): Date: MM/DD/YY d. DWO (o r G ro u p D ire c to r) Name: Date: MM/DD/YY Notify SEA 05S that project is complete or readyfo r Final Concurrence. Submit Project Deliverables and PDS to commandstandards(a)navv. mil 23. Final Concurrence (when required, see B. 17) a. Start: MM/DD/YY Due: MM/DD/YY b. Validate all comments have been properly adjudicated and resulting changes have been agreed to by the activities listed in B.17. c. TWH (o r T e c h n ic a l L e a d e r) Name: Date: MM/DD/YY d. Task Manager Name (optional): Date: MM/DD/YY e. DWO (o r G ro u p D ire c to r) Name: Date: MM/DD/YY Notify SEA 05S that all signatures have been received Submit Project Deliverables and PDS to commandstandards(a)navv. mil 24. SEA 05S Validation of Proper Coordination, Project Completion, and Customer Acceptance. a. Project Manager Name: b. Program Manager Name: Date: MM/DD/YY Date: MM/DD/YY Notify project technical POCs o f approval ofproject completion. Date: MM/DD/YY TWH (or Technical Leader), EM, or LE ensures project historyfiles are maintained Discussion (for SEA 05S use only) 9 of 13 US00006090 For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandards(a)naw. mil. NAVSEA PROJECT DATA SHEET (PDS) APPENDIX A - 1.0,1.1, 1.2, 2.1, 3.1, 3.2, 4.0 Project #: A. 1. Project Activity Plan Task # Items/Activities Deliverable PA# Estimated # of Days From Receipt of Initial Planned Start Actual Start Funding Date Date Planned Completion Date Actual Completion Date (M M /D D /Y Y ) (M M /D D /Y Y ) S ta rt C om plete (M M /D D /Y Y ) (M M /D D /Y Y ) 1 2 3 4 5 6 7 8 Final Report/Document M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y See A.2 -A .4 below A.2. Final Report/Document Information (if applicable) Report/Document #: Title: A.3. Distribution Statement: Q A B Q C D C U E C U F Q X A.4. Schedule for Final Report/Document Circulation # of Days From Initial Receipt of Planned Date Actual Date Funds (M M /D D /Y Y ) (M M /D D /Y Y ) a. TWFI (or T e c h n ic a l L e a d e r) to forward 1st draft to reviewers for Intermediate Review. M M /D D /Y Y M M /D D /Y Y b. TWFI (o r T e c h n ic a l L e a d e r) Or DWO (o r G ro u p D ire c to r) to Submit proposed Report/Document to SEA 05 S for SIB Review. M M /D D /Y Y M M /D D /Y Y C. TWFI (o r T e c h n ic a l L e a d e r) Or DWO (o r G ro u p D ire c to r) to Submit Report/Document to SEA 05 S following comment resolution for Report/Document publication (normally within 60 to 90 daysfrom previous step). M M /D D /Y Y M M /D D /Y Y d. Publish Report/Document (normally within 30 daysfrom previous step). M M /D D /Y Y M M /D D /Y Y Discussion (for SEA 05S use only) 10 of 13 US00006091 For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandards(a)naw. mil. NAVSEA PROJECT DATA SHEET (PDS) APPENDIX B - 3.0 TECHNICAL STANDARDS AND PROCESSES GGB .l. Existing Document Information (if applicable) Document #: Project #: Page Count: Title B.2. Distribution Statement: GG A G B E G C GG D GG E GGF GG X Document Date: MM/DD/YY B.3. Document Type: Check applicable box(es) Defense Standardization Program (DSP) Document: GG GGAdopted Non-Government Standard GG(NGS) GG GGCommercial Item Description (CID) GG GGFederal Specification GG GGFederal Standard GG GGDefense Specification: GG GGPerformance Detail Defense Standard: Test Method Standard Interface Standard Standard Practice Design Criteria Standard Manufacturing Process Standard Defense Handbook Qualified Products List (QPL)/ Qualified Manufacturer's List (QML) International Standardization Agreement (ISA) Program Unique Document GG GG GGNAVSEA Drawing: NAVSEA Instruction NAVSEA Technical Manual/Publication GG GG GGStandard Type OPNAV Instruction TMSR or TMCR #: GG GG GGDesign Data Sheet Other (specify): Naval Ships' Technical Manual (NSTM) Chapter (DDS) B.4. Verify document record is entered and assigned in Human Capital Digital Dashboard (HCDD): GG Yes GG No B.5. Project Action: Check applicable box(es) GG GGDevelop GG GGRevise GG GGInterim Revision GG GGChange Amend Interim Amendment Cancel w/ Replacement Cancel w/out Replacement GG Reinstate GG Inactivate GG Reactivate GG Transfer GG Adopt (NGS only) GG Withdrawal of Adoption (NGS only) GG Administrative Notice GG Other: I f you selected a DSP document in B.3 above, complete items B .6 - B.12; otherwise, skip to item B.15. B.6. Environmental considerations GG GGa. Does the document require the use of hazardous materials or environmentally damaging materials? No Yes, list: b. Does the document consider the use of biobased materials? c. Does the document prohibit the use of biobased products? GG GG Yes No Yes No B.7. Coordination B.8. Classification Codes B.9. AMSC #: B. 10. Could an existing document be used GG Full Limited FSC/Area: NAICS: GG(if applicable) as is or with a minor modification? Yes, Doc#: No GGB.12. Does the document implement an International Standardization Agreement (ISA)? Yes, ISA#: B. 11. Is qualification GGrequired? Yes GG No No B.13. Lead Standardization Activity LSA POC Name Government Activity Phone # Email Address B.14. ASSIST Project #: Date Assigned: MM/DD/YY B.15. Technical Manual Management Activity (TMMA) (For Documents Specified as Technical Manual in B. 3 only) TMMA Name Government Activity Phone # Email Address Discussion (for SEA 05S use only) 11 of 13 US00006092 For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandards(a)naw. mil. NAVSEA PROJECT DATA SHEET (PDS) APPENDIX B - 3.0 TECHNICAL STANDARDS AND PROCESSES Project #: B.16. Schedule/Deliverables (DSP Documents, NAVSEA Standard & Type Drawings, DDSs, and Technical Manuals/Publications) a. Start date and/or date of receipt of funds. b. TWH (o r T e c h n ic al L ead er) to forward 1st draft to reviewers for Intermediate Review. C. TWH (o r T e c h n ic a l L e a d e r) Or DWO (o r G ro u p D ire c to r) to Submit proposed document to SEA 05 S for GIR/SIB Review. d. TWH (o r T e c h n ic a l L e a d e r) Or DWO (o r G ro u p D ire c to r) to Submit document to SEA 05 S following comment resolution for document publication. e. Publish document (depending on document type, completed by document owner or SEA 05S). # of Days From Initial Receipt of Funds Planned Date (M M /D D /Y Y ) M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y Actual Date (M M /D D /Y Y ) M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y B.16. Schedule/Deliverables (NAVSEA & OPNAV Instructions and Other Documents Reviewed/Signed by the SEA 05 Front Office - see also B. 17) a. Start date and/or date of receipt of funds. (Plan) b. TWH (o r T e c h n ic al L ead er) to forward 1st draft to reviewers for Intermediate Review. C. TWH (o r T e c h n ic a l L e a d e r) Or DWO (o r G ro u p D ire c to r) to Submit proposed document to SEA 05 S for SIB Review. (Writing Complete) d. TWH (o r T e c h n ic a l L e a d e r) Or DWO (o r G ro u p D ire c to r) to Submit document for concurrences. (Comments Adjudicated) e. TWH (o r T e c h n ic a l L e a d e r) Or DWO (o r G ro u p D ire c to r) fo Submit document fo SEA 05S for document publication. (Concurrences Complete) f. Publish document. (Sign) # of Days From Initial Receipt of Planned Date Funds (M M /D D /Y Y ) W. M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y Actual Date (M M /D D /Y Y ) M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y Discussion (for SEA 05S use only) 12 of 13 US00006093 For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandards(a)naw. mil. NAVSEA PROJECT DATA SHEET (PDS) APPENDIX B - 3.0 TECHNICAL STANDARDS AND PROCESSES Project #: B.17. NAVSEA & OPNAV Instructions and Other Documents Reviewed/Signed by the SEA 05 Front Office: Name Activity and Code Concurrence Required Yes No SEA 05B2 SEA 05B3 SEA 05C (TDM CE) SEA 05D (CSE SHIPS) SEA 05H (CSE IW S) SEA 05L (CSE LM W ) SEA 05M (TDM W SE LM W ) / NSW C PC DTD SEA 05N (TDM W SE Undersea) / NUW C NPT DTD SEA 05P (TDM SIPE) SEA 05S SEA 05T SEA 05U (CSE SUBS) SEA 05V (CSE CV) SEA 05W (TDM W SE Surface) / NSW C DL DTD SEA 05X SEA 05Z (TDM M E) NSWC CD DTD NSWC CO DTD NSWC CR DTD NSW C IHEODTECHDIV NSWC PH DTD NUWC KPT DTD SEA 00C (TDM OE) SEA 0 0 V W (NOSSA) SEA 04R (TDM IE) FFC N43 CPF N43 NSW C (Technical Dir) NSW C (Commander) NUW C (Technical Dir) NUW C (Commander) SEA 00V SEA05B SEA 05 (B rief Sheet) (Signature) PEO IW S PEO LCS PEO Ships PEO Subs PEO Carriers CNRMC SEA 04 SEA 07 SEA 08 SEA 21 Concurrence Date M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY Discussion (for SEA 05S use only) 13 of 13 US00006094