NAVSEA PROJECT DATA SHEET (PDS)
Date: MM/DD/YV
PHASE 1 - PROJECT INITIATION AND PLANNING
Project #:
1. Project Identification
Project #: 2. Applicability: Check
EH Project Title:
PEO Carriers
PEOLCS
PEO IWS
applicable box(es)
PEO Subs/SEA 07
3. This project relates to: Check applicable box(es)
EH EH PEO Ships/SEA 21
SUBSAFE
Secondary Plant/SEA 08 Interest
EH N/A
4. Type of Project: Check applicable box. See Appendix C (PDS Instructions) fo r descriptions.
1.0 Risk and Cost Reduction (RCR)
3.0 Technical Standard or Process (Document)
1.1 Cumbersome Work Practice (CWP)
3.1 Documentation for Ship Cost Reduction (DSCR)
I I 1.2 Commonality (CMN)
EH 3.2 Technical Tool (TT)
I I 2.1 Critical Unfunded Technical Authority Role (TAR)____I I 4.0 Technical Authority Program Management (TPM)
EH EH EH EH EH5. Project Classification:
Unclassified
FOUO
NOFORN
Confidential
Secret
N ote AA/A The content o f this PDS shall be kept unclassified.
6. Project Points of Contact
Role
a. DWO (or Group Director) b. TWH (or Technical Leader) c. EM
Name
Activity & Code
Phone ###-###-
Email Address
d. LE
e. POC (if other than LE)
f. Task Manager
g. HQ Program Manager
h. HQ Project Manager
7. Project Summary (Briefly tell the storyfo r this project in a way that allows customers and other engineers to understand its importance.)
a. Task Summary:
Discussion (for SEA 05S use only)
1 of 13
US00006082
For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandards(a)naw. mil.
NAVSEA PROJECT DATA SHEET (PDS) PHASE 1 - PROJECT INITIATION AND PLANNING
Project #:
7. Project Summary (Briefly tell the storyfo r this project in a way that allows customers and other engineers to understand its importance.) - Continued b. Work to be Performed by Each Performing Activity (add more/delete as necessary)'.
(1) Performing Activity #1 - ITWH's (or Technical Leader's) Business Unit Codel
(2) Performing Activity #2 - TPA and Codel
(3) Performing Activity #3 - TPA and Codel
(4) Performing Activity #4 - ITT Exelis Assist Project Manager and Tech Chain with project processing, technical editing, format and content compliance reviews, and other related tasking as described in the PDS for TPM-002.
c. Previous Work/Market Analysis:
d. Concurrent Efforts:
e. Future Efforts:
f. Customer Demand Signal for this Project:
g. Transition of Project Results to Fleet User:
8. Describe the expected improvements in the following (improvement statements)'. a. Relevance:
b. Safety:
c. Currency:
d. Cost-Effectiveness/Retum on Investment (ROI):
e. Commonality:
Discussion (for SEA 05S use only)
2 of 13
US00006083
For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandards(a)naw. mil.
NAVSEA PROJECT DATA SHEET (PDS)
PHASE 1 - PROJECT INITIATION AND PLANNING
Project #:
9. Approximate Time to Complete (in months):
10. Deliverables and Schedule: Go to Aooendix A for 1.0, 1.1, 1.2, 2.1, 2.2, 3.1, 3.2, and 4.0; Go to Aooendix B for 3.0.
11. Total Project Cost ($K): $
K
12. Performing Activities (PAs):
a. PA #1 (always TW H 's or Technical Leader's Business Unit)
cv.
(1) Perlbrmer
N aim -
N o t e >1/': I f mission-funded, complete only p in k cells; otherwise, complete (1) through
A c t i v i t y A ( ode
Phone
E m a i l Address
EH EH<2) Role in Project:
(3) Source of Funds:
SE/TA OMN
Mission Funding lapprov manhours:
EH) Other, describe:
(4) Activity Points of Contact for ERP
Liaison
Name
Activity & Code
Phone
Email Address
Technical #1
Financial #1
Technical #2
Financial #2
(5) Planned Funding Requirements - Detailed Budget ($K)
Quarter A Quarter B Quarter C Quarter D Quarter E Quarter F Quarter G Quarter H Total
Funding Plan ($K )
Labor ($K )
ODCs ($K )
Travel ($K )
# Man Years (o.oo)
(6) Approved Funding - Detailed Budget ($K)
FY FY
1st Q
2nd Q
3rd Q
4th Q
Total
1st Q
2nd Q
3rd Q
4th Q
Total
M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y 111111111111P M M /D D /Y Y
PM Initials
PM Initials
PM Initials
PM Initials
PM Initials
(7) Obligated Funding - Detailed Budget ($K)
FY
1st Q
2nd Q
3rd Q
4th Q
Total
1st Q
M M /DD/YY PM Initials
2nd Q
M M /D D /Y Y PM Initials
FY 3rd Q
M M /DD/YY PM Initials
4th Q
Total
M M /DD/YY PR#
Fund Doc #
M M /D D /Y Y PR#
Fund Doc #
M M /D D /Y Y PR#
Fund Doc #
M M /D D /Y Y 1 M M /D D /Y Y
PR# w m PR#
w' F und D oc #
Fund Doc #
M M /DD/YY PR#
Fund Doc #
M M /D D /Y Y PR#
Fund Doc #
M M /DD/YY ! lllll
PR#
Fund Doc #
Discussion (for SEA 05S use only)
3 of 13
US00006084
For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandards(a)naw. mil.
NAVSEA PROJECT DATA SHEET (PDS)
PHASE 1 - PROJECT INITIATION AND PLANNING
Project #:
b . PA # 2
N o t e >1/': I f mission-funded or other, complete only p in k cells; otherwise, complete (1) through (5).
(1) Perlbmier
N om e
Activity & C ode or C ontractor
Phone
Eninil A ddress
<2) Rule in Project: i ' i Source olTiiiui:
EH SI. 1 A ( ) \ I \
EH M i s s i o n F u n d i n g l a p p r o v M a n h o u r s :
EH) O l l i e r , d e s c r i b e :
(4) Activity Points of Contact for ERP
Liaison
Name
Activity & Code or Contractor
Phone
Email Address
Technical #1
Financial #1
Technical #2
Financial #2
(5; Planned Funding Requirements - Detailed Budget ($K)
Quarter A Quarter B Quarter C Quarter D Quarter E Quarter F Quarter G Quarter H Total
Funding Plan (SK )
Labor ($K )
ODCs ($K )
Travel ($K )
# Man Years (o.oo)
Prime Contract #
( 6 ) Approved Funding - Detailed Budget ($K)
FY FY
1st Q
2nd Q
3rd Q
4th Q
Total
1st Q
2nd Q
3rd Q
4th Q
Total
M M /DD/YY M M /D D /Y Y M M /D D /Y Y M M /DD/YY
PM Initials
PM Initials
PM Initials
PM Initials
( 7 ) Obligated Funding - Detailed Budget ($K)
FY
1st Q 2nd Q 3rd Q 4th Q
Total
M M /D D /Y Y PM Initials
M M /DD/YY PM Initials
M M /D D /Y Y PM Initials
M M /DD/YY 1 1 1 1 1 1 1 1 1 1 PM Initials
FY 1st Q 2nd Q 3rd Q 4th Q Total
M M /DD/YY PR#
M M /D D /Y Y PR#
M M /D D /Y Y PR#
M M /DD/YY
M M /D D /Y Y
PR#
1 1 1 1 1 1 1 1 1 1 1 1
PR#
M M /DD/YY PR#
M M /D D /Y Y PR#
M M /D D /Y Y 111111111111P
PR#
Fund Doc #
Fund Doc #
Fund Doc #
W,Fund D oc #
Fund Doc #
Fund Doc #
Fund Doc #
Fund Doc # iiiiiii
Discussion (for SEA 05S use only)
4 of 13
US00006085
For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandards(a)naw. mil.
NAVSEA PROJECT DATA SHEET (PDS)
PHASE 1 - PROJECT INITIATION AND PLANNING
Project #:
c. PA #3 (1) Performer
Name
Activity & Code or Contractor
Phone
Email Address
(2) Role in Project:
(3) Source of Funds: SE/TA OMN
Other, describe:
(4) Activity Points of Contact for ERP
Liaison
Name
Activity & Code or Contractor
Phone
Email Address
Technical #1
Financial #1
Technical #2
Financial #2
(5) Planned Funding Requirements - Detailed Budget ($K)
W, Quarter A Quarter B Quarter C Quarter D Quarter E Quarter F Quarter G Quarter H
Total
Funding Plan ($K )
Labor ($K )
ODCs ($K )
Travel ($K )
# Man Years (o.oo)
Prime Contract # (6) Approved Funding - Detailed Budget ($K)
H
FY FY
1st Q
2nd Q
3rd Q
4th Q
Total
1st Q
2nd Q
3rd Q
4th Q
Total
M M /DD/YY M M /D D /Y Y M M /D D /Y Y M M /DD/YY
PM Initials
PM Initials
PM Initials
PM Initials
(7) Obligated Funding - Detailed Budget ($K)
FY
1st Q 2nd Q 3rd Q 4th Q
I M M /DD/YY W m w. PM Initials
Total
1st Q
M M /DD/YY PM Initials
2nd Q
M M /D D /Y Y PM Initials
FY 3rd Q
M M /DD/YY 1
PM Initials
4th Q
Total
M M /DD/YY PR#
Fund Doc #
M M /D D /Y Y PR#
Fund Doc #
M M /D D /Y Y PR#
Fund Doc #
M M /DD/YY W m w. M M /DD/YY
PR#
PR#
Fund Doc #
'W .
w Fund Doc #
M M /DD/YY PR#
Fund Doc #
M M /D D /Y Y PR#
Fund Doc #
M M /DD/YY m m m m ,
PR# Fund Doc #
WWWk.',
d. PA #4 (1) Performer
Name
(2) Role in Project: See 7.b(_).
(3) Source of Funds: Kl SE/TA OMN
(TPM-002)
Activity & Code or Contractor ITT Exelis
1H1W
Phone
Email Address
Discussion (for SEA 05S use only)
5 of 13
US00006086
For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandards(a)naw. mil.
NAVSEA PROJECT DATA SHEET (PDS)
PHASE 1 - PROJECT INITIATION AND PLANNING
Project #:
13. Distribution List for Project Coordination:
a. Performing Activity POCs
PA #
Name
Activity & Code or Contractor
Email Address
Project Intermediate Project Initiation Review Circulation
MM
M
b. Reviewers
Name
SIB Distribution List R&SE Competency Distribution List DoD ASSIST Reviewer List for Document/LSC/Area QPL Suppliers/Applicants NECO Notice NSRP Shipyards
ITT Exelis Activity & Code or Contractor
Email Address
Project Intermediate Project Initiation Review Circulation
Discussion (for SEA 05S use only) Note: Asterisks indicate critical response needed. Reviewer must provide a positive response during project circulation before the document can proceed to publication.
6 of 13
US00006087
For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandardsQinaw. mil.
NAVSEA PROJECT DATA SHEET (PDS)
PHASE 1 - PROJECT INITIATION AND PLANNING
Project #:
14. Project Initiation and Planning Concurrence a. TWH (o r T e c h n ic a l L e a d e r) Name: b. Task Manager Name (optional): C. DWO (o r G ro u p D ire c to r) Name:
Date: MM/DD/YY Date: MM/DD/YY Date: MM/DD/YY
P 5 M H Email PDS comvleted to this point to commandstandardsQi)navv.mil to reauest Project Initiation.
d. Project Manager Name:
Date: MM/DD/YY
Place on R&SE Tracker O Yes O No
15. Project Initiation Circulation (7 days)
a. Start: MM/DD/YY Due: MM/DD/YY
b. Were comments received?
1 1 Yes, date of comment resolution: MM/DD/YY
c. TWH (o r T e c h n ic a l L e a d e r) Approval of Comment Adjudication (name):
(only if PIR comments were received)
O No Date: MM/DD/YY
S l l M H Email PDS completed to this point to commandstandardsQinaw.mil for SEA OSS approval to proceed to Execution.
d. Project Manager Validation of Comment Adjudication (name):
(only i f PIR comments were received)
16. Validation of Project Plan and Approval to Proceed to Phase 2 - Execution Program Manager Name:
I f SE/TA OMNfunds ARE NOT needed, notify TWH (or Technical Leader), EM, and LE o f \ / approval o f the project plan and approval to proceed to Execution.
Date: MM/DD/YY
Date: MM/DD/YY Date: MM/DD/YY
/ sea i k \ I f SE/TA OMNfunds ARE needed, notify TWH (or Technical Leader), EM, and LE o f approval o f
/ action/
p roj ecfp ian a n ([placement o f the project in the hopperfo r funding consideration.
Date: MM/DD/YY
Discussion (for SEA 05S use only) Note: Asterisks indicate critical response needed. Reviewer must provide a positive response during project circulation before the document can proceed to publication.
7 of 13
US00006088
For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandards(a)naw. mil.
PHASE 2 - EXECUTION
NAVSEA PROJECT DATA SHEET (PDS)
Project #:
17. Approval for Intermediate Review
TWH (o r T e c h n ic al L ead er) Name:
Date: MM/DD/YY
18. Intermediate Review
a. Performing Activity POCs
PA #
Name
Activity & Code or Contractor
Concurrence Date
MM/DD/YY
MM/DD/YY
MM/DD/YY
MM/DD/YY
MM/DD/YY
ITT Exelis
MM/DD/YY
b. Intermediate Reviewers
Name
Activity & Code or Contractor
Concurrence Date
MM/DD/YY
MM/DD/YY
MM/DD/YY
MM/DD/YY
MM/DD/YY
MM/DD/YY
MM/DD/YY
MM/DD/YY
19. Concurrence and Submittal of Project Deliverable(s) for Project Circulation
a. Validate adjudication of Intermediate Review Comments.
b. Update project summary and expected improvements (Blocks 7 & 8) in Phase 1 - Project Initiation and Planning.
c. Attach draft project deliverables.
d. Attach List of Changes (LOC) with rationale (for existing 3.0projects only).
e. Attach this PDS.
f. TWH (o r T e c h n ic a l L e a d e r) Name:
Date: MM/DD/YY
m RPPV^I Notify SEA 05S that project is ready to proceed to Project Circulation andprovide project deliverable(s) and PDS to W0KKK commandstandards(a)naw.mil.
20. SEA 05S Validation of Proper Coordination and Readiness to Proceed to Phase 3 - Finalization a. Project Manager Name: b. Program Manager Name:
Date: MM/DD/YY Date: MM/DD/YY
Discussion (for SEA 05S use only)
8 of 13
US00006089
For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandards(a)naw. mil.
NAVSEA PROJECT DATA SHEET (PDS) PHASE 3 - FINALIZATION
Project #:
2 1. Project Circulation
a. Project Circulation Type
EH GIR Full (45 days) GIR Limited (30 days) SIB 14-Day R&SE 14-Day
b. Start: MM/DD/YY Due: MM/DD/YY
EHc. Were comments received? Yes, date of comment resolution: MM/DD/YY No
22. Comment Adjudication
a. Validate all comments have been properly adjudicated, resulting changes have been agreed to by the appropriate technical authorities, reviewers, and customers, as applicable; all necessary concurrences have been received; project is complete; and associated document(s) is(are) ready to publish.
b. TWH (o r T e c h n ic a l L e a d e r) Name:
Date: MM/DD/YY
c. Task Manager Name (optional):
Date: MM/DD/YY
d. DWO (o r G ro u p D ire c to r) Name:
Date: MM/DD/YY
Notify SEA 05S that project is complete or readyfo r Final Concurrence. Submit Project Deliverables and PDS to commandstandards(a)navv. mil
23. Final Concurrence (when required, see B. 17)
a. Start: MM/DD/YY
Due: MM/DD/YY
b. Validate all comments have been properly adjudicated and resulting changes have been agreed to by the activities listed in B.17.
c. TWH (o r T e c h n ic a l L e a d e r) Name:
Date: MM/DD/YY
d. Task Manager Name (optional):
Date: MM/DD/YY
e. DWO (o r G ro u p D ire c to r) Name:
Date: MM/DD/YY
Notify SEA 05S that all signatures have been received Submit Project Deliverables and PDS to commandstandards(a)navv. mil
24. SEA 05S Validation of Proper Coordination, Project Completion, and Customer Acceptance. a. Project Manager Name: b. Program Manager Name:
Date: MM/DD/YY Date: MM/DD/YY
Notify project technical POCs o f approval ofproject completion.
Date: MM/DD/YY
TWH (or Technical Leader), EM, or LE ensures project historyfiles are maintained
Discussion (for SEA 05S use only)
9 of 13
US00006090
For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandards(a)naw. mil.
NAVSEA PROJECT DATA SHEET (PDS) APPENDIX A - 1.0,1.1, 1.2, 2.1, 3.1, 3.2, 4.0
Project #:
A. 1. Project Activity Plan
Task #
Items/Activities
Deliverable
PA#
Estimated # of Days From Receipt of Initial
Planned Start
Actual Start
Funding
Date Date
Planned Completion
Date
Actual Completion
Date
(M M /D D /Y Y ) (M M /D D /Y Y )
S ta rt
C om plete
(M M /D D /Y Y ) (M M /D D /Y Y )
1 2 3 4 5 6 7 8 Final Report/Document
M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y
See A.2 -A .4 below
A.2. Final Report/Document Information (if applicable) Report/Document #:
Title:
A.3. Distribution Statement: Q A B Q C D C U E C U F Q X
A.4. Schedule for Final Report/Document Circulation
# of Days From Initial Receipt of
Planned Date
Actual Date
Funds
(M M /D D /Y Y ) (M M /D D /Y Y )
a. TWFI (or T e c h n ic a l L e a d e r) to forward 1st draft to reviewers for Intermediate Review.
M M /D D /Y Y M M /D D /Y Y
b. TWFI (o r T e c h n ic a l L e a d e r) Or DWO (o r G ro u p D ire c to r) to Submit proposed Report/Document to SEA 05 S for SIB Review.
M M /D D /Y Y M M /D D /Y Y
C. TWFI (o r T e c h n ic a l L e a d e r) Or DWO (o r G ro u p D ire c to r) to Submit Report/Document to SEA 05 S following comment resolution for Report/Document publication (normally within 60 to 90 daysfrom previous step).
M M /D D /Y Y M M /D D /Y Y
d. Publish Report/Document (normally within 30 daysfrom previous step).
M M /D D /Y Y M M /D D /Y Y
Discussion (for SEA 05S use only)
10 of 13
US00006091
For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandards(a)naw. mil.
NAVSEA PROJECT DATA SHEET (PDS)
APPENDIX B - 3.0 TECHNICAL STANDARDS AND PROCESSES
GGB .l. Existing Document Information (if applicable) Document #:
Project #:
Page Count:
Title
B.2. Distribution Statement: GG A G B E G C GG D GG E GGF GG X
Document Date:
MM/DD/YY
B.3. Document Type: Check applicable box(es)
Defense Standardization Program (DSP) Document:
GG GGAdopted Non-Government Standard GG(NGS)
GG GGCommercial Item Description (CID)
GG GGFederal Specification
GG GGFederal Standard
GG GGDefense Specification:
GG GGPerformance
Detail
Defense Standard:
Test Method Standard
Interface Standard
Standard Practice
Design Criteria Standard
Manufacturing Process Standard
Defense Handbook Qualified Products List (QPL)/ Qualified Manufacturer's List (QML) International Standardization Agreement (ISA) Program Unique Document
GG GG GGNAVSEA Drawing:
NAVSEA Instruction
NAVSEA Technical Manual/Publication
GG GG GGStandard
Type
OPNAV Instruction
TMSR or TMCR #:
GG GG GGDesign Data Sheet
Other (specify):
Naval Ships' Technical Manual (NSTM) Chapter
(DDS) B.4. Verify document record is entered and assigned in Human Capital Digital Dashboard (HCDD):
GG Yes GG No
B.5. Project Action: Check applicable box(es)
GG GGDevelop GG GGRevise GG GGInterim Revision GG GGChange
Amend Interim Amendment Cancel w/ Replacement Cancel w/out Replacement
GG Reinstate GG Inactivate GG Reactivate GG Transfer
GG Adopt (NGS only) GG Withdrawal of Adoption (NGS only) GG Administrative Notice GG Other:
I f you selected a DSP document in B.3 above, complete items B .6 - B.12; otherwise, skip to item B.15.
B.6. Environmental considerations
GG GGa. Does the document require the use of hazardous materials or environmentally damaging materials? No Yes, list:
b. Does the document consider the use of biobased materials? c. Does the document prohibit the use of biobased products?
GG GG Yes No Yes No
B.7. Coordination B.8. Classification Codes B.9. AMSC #: B. 10. Could an existing document be used
GG Full Limited
FSC/Area: NAICS:
GG(if applicable) as is or with a minor modification? Yes, Doc#:
No
GGB.12. Does the document implement an International Standardization Agreement (ISA)?
Yes, ISA#:
B. 11. Is qualification
GGrequired? Yes
GG No
No
B.13. Lead Standardization Activity
LSA POC Name
Government Activity
Phone #
Email Address
B.14. ASSIST Project #:
Date Assigned: MM/DD/YY
B.15. Technical Manual Management Activity (TMMA) (For Documents Specified as Technical Manual in B. 3 only)
TMMA Name
Government Activity
Phone #
Email Address
Discussion (for SEA 05S use only)
11 of 13
US00006092
For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandards(a)naw. mil.
NAVSEA PROJECT DATA SHEET (PDS)
APPENDIX B - 3.0 TECHNICAL STANDARDS AND PROCESSES
Project #:
B.16. Schedule/Deliverables (DSP Documents, NAVSEA Standard & Type Drawings, DDSs, and Technical Manuals/Publications)
a. Start date and/or date of receipt of funds. b. TWH (o r T e c h n ic al L ead er) to forward 1st draft to reviewers for Intermediate Review. C. TWH (o r T e c h n ic a l L e a d e r) Or DWO (o r G ro u p D ire c to r) to Submit proposed document to SEA 05 S for GIR/SIB Review. d. TWH (o r T e c h n ic a l L e a d e r) Or DWO (o r G ro u p D ire c to r) to Submit document to SEA 05 S following comment resolution for document publication. e. Publish document (depending on document type, completed by document owner or SEA 05S).
# of Days From Initial Receipt of
Funds
Planned Date
(M M /D D /Y Y )
M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y
Actual Date
(M M /D D /Y Y )
M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y
M M /D D /Y Y M M /D D /Y Y
M M /D D /Y Y M M /D D /Y Y
B.16. Schedule/Deliverables (NAVSEA & OPNAV Instructions and Other Documents Reviewed/Signed by the SEA 05 Front Office - see also B. 17)
a. Start date and/or date of receipt of funds. (Plan) b. TWH (o r T e c h n ic al L ead er) to forward 1st draft to reviewers for Intermediate Review. C. TWH (o r T e c h n ic a l L e a d e r) Or DWO (o r G ro u p D ire c to r) to Submit proposed document to SEA 05 S for SIB Review. (Writing Complete) d. TWH (o r T e c h n ic a l L e a d e r) Or DWO (o r G ro u p D ire c to r) to Submit document for concurrences. (Comments Adjudicated) e. TWH (o r T e c h n ic a l L e a d e r) Or DWO (o r G ro u p D ire c to r) fo Submit document fo SEA 05S for document publication. (Concurrences Complete) f. Publish document. (Sign)
# of Days From Initial Receipt of
Planned Date
Funds
(M M /D D /Y Y )
W. M M /D D /Y Y
M M /D D /Y Y
M M /D D /Y Y
M M /D D /Y Y
M M /D D /Y Y
M M /D D /Y Y
Actual Date
(M M /D D /Y Y ) M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y
M M /D D /Y Y
M M /D D /Y Y
M M /D D /Y Y
Discussion (for SEA 05S use only)
12 of 13
US00006093
For assistance with this PDS, please contact the Project Manager (if identified in #6.h) or SEA 05S at (202) 781-0074 or commandstandards(a)naw. mil.
NAVSEA PROJECT DATA SHEET (PDS)
APPENDIX B - 3.0 TECHNICAL STANDARDS AND PROCESSES
Project #:
B.17. NAVSEA & OPNAV Instructions and Other Documents Reviewed/Signed by the SEA 05 Front Office:
Name
Activity and Code
Concurrence Required Yes No
SEA 05B2 SEA 05B3 SEA 05C (TDM CE) SEA 05D (CSE SHIPS) SEA 05H (CSE IW S) SEA 05L (CSE LM W ) SEA 05M (TDM W SE LM W ) / NSW C PC DTD SEA 05N (TDM W SE Undersea) / NUW C NPT DTD SEA 05P (TDM SIPE) SEA 05S SEA 05T SEA 05U (CSE SUBS) SEA 05V (CSE CV) SEA 05W (TDM W SE Surface) / NSW C DL DTD SEA 05X SEA 05Z (TDM M E) NSWC CD DTD NSWC CO DTD NSWC CR DTD NSW C IHEODTECHDIV NSWC PH DTD NUWC KPT DTD SEA 00C (TDM OE) SEA 0 0 V W (NOSSA) SEA 04R (TDM IE) FFC N43 CPF N43
NSW C (Technical Dir) NSW C (Commander) NUW C (Technical Dir) NUW C (Commander) SEA 00V SEA05B SEA 05
(B rief Sheet) (Signature)
PEO IW S PEO LCS PEO Ships PEO Subs PEO Carriers CNRMC SEA 04 SEA 07 SEA 08 SEA 21
Concurrence Date
M M /D D /Y Y M M /D D /Y Y M M /D D /Y Y M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY M M /DD/YY
Discussion (for SEA 05S use only)
13 of 13
US00006094