December 10, 1975 PCB Emergency Plan
TO Messrs.
R.E. Beal
- B2SB
D.R.' Bishop
- El
R. Davis
-- B2SF
W.H. Duffey
- EISA
M.E. Gibbs
-- W1A
C.P. Orr
- G2WD
W.B. Papageo^ge - B3NB
C. Paton S
- B2SK
C. Weber
-- B2SK
D. Wood
_ B2SD
J.J. Zeman
- B2SK
Attached is the penultimate draft of our Emergency Plan on PCB's for your review. We will finalize this in our meeting on Monday, December 15 (9'00 AM 11:00 --- B-291-S).
Also attached is a PCB Emergency Plan telephone list.
/bh Attachments
SW 1852-17 STLCOPCB4051463
PENULTIMATE
DRAFT
EMERGENCY PLAN - PCB's
Scenario - Immediate ban on production* sale or use of PCB before volume production of MCS 1238 is ready.
Responsibility for initiation of this plan and verification of acceptance of responsibilities: R.G. Potter
A. Immediate Actions upon notification of ban 1. Suspend chlorination operations. Suspend shipments from Krummrich Plant and warehouses (Santa Clara* .Elizabeth* Los Angeles). Do not recall shipments , enroute. Finish any distillation batches under way.
Responsibility: R.A. Pohl
Contacts: Krummrich Plant - A.E. Leisy R.W. Flint
Warehouses
- E.M. Potter C.B. Sigler
2. Make preliminary press release (prepared in advance) stating that operations have been suspended and supplying background information on our PCB control efforts* status of replacements.
' Responsibility: D.R. Bishop
Timing:
Upon notification from R.A. Pohl
that item A.l is complete.
qSVM 185218
STLCOPCB4051464
.
: 1I 1
|
3 . Communicate situation to other affected Monsanto operations.
a. Krummrich production planning - D.T. Mayer b. Process Chemicals Marketing (CS Acid, Muriatic) -
J.F. Winkler c. Anniston Plant (biphenyl) - W.E. Voss d. Purchasing (TCB, drums) - B. Byrne
Responsibility: E.M. Potter
Determine precise details of ban -- Marketing (D. Wood), Product Acceptability (J.C. Weber), Washington Office (W. Easley), Legal (W. Withers/ T. Bottini), and report to Business Director. Coordinating Responsibility: D. Wood
Review this plan to determine whether it fits the circumstances and make recommendations to the CAC on policy and implementation. Responsibility: R.G. Potter Timing: Within 2 business days
' *
B. Follow-up Actions after CAC approval of detailed policy
1. Appoint Administrative Coordinator for 3-6 month .
period.
.
- Responsibility: R.G. Potter
2. Briefing meeting (first day) to define policy and
announce appointment of coordinator to:
-k kcc-oMjJ <!*-*-*
'ML /jl sJdtl hx- ''oJJL
,r 'frvT^
DSW 185219
--------
STLCOPCB4051465
a. Business Group b. COP c. Sales Force d. Research e. P.R. f. Washington Office Responsibility: R.G. Potter
3. Notify customers by: a. Telephone to most senior management contact Marketing (first day) b. Certified express letter to: --Office of the President --Purchasing Manager of use locations --Confirmation to telephone contact
(Note - direct all immediate customer responses to marketing group.) Responsibility: D. Wood
4. Notify Corporate Engineering to minimize impact on operation of our Askarel units Responsibility: C.P. Orr
5. Resume production and shipments as permitted by the approved policy, if any. .Responsibility: R.A. Pohl E.M. Potter
os*'85*10
STLCOPCB4051466
6 . Brief corporate marketing directors with other sales to dielectric customers on policy (second day). Responsibility: D. Sliney
. 7. Notify Federal/State agencies of policies (3-5 days), Responsibility: Washington Office - W. Easley
8. a. P.R. release on policy (second day) b. P.R. prepare Q&A sheet on policy (third day). c. Series of paid advertisements (7-15 days). Responsibility: D.R. Bishop
Prepare form letters (third-fourth day). a. Transformer users b. Capacitor users Responsibility: D. Wood
I%Aju
A? ?
Brief U.S. Export Managers on export policy (fifth day). Responsibility: C. Paton/D. Wood
11. A*?
wuuu wcca;. ncspuiibxuxjLJ.^ , u, nuuu
.12 Notify U.S. export customers of policy (second week).
i** Responsibility: Area Managers
13. Upon completion of final customer shipments, move all
Monsanto PCB inventories to Krummrich incinerator. Responsibility: E.M. Potter 14. Initiate decontamination of Krummrich PCB facilities
Tot--oo Qco
(see detailed decontamination plan):
Responsibility: RA Pohl
STLCOPCB4051467
EMERGENCY PLAN - POLICY DECISIONS NEEDED FOR CAC APPROVAL
Domestic
1. Date of final production
2. Shipment of inventory.
3. Customer committment to orders on books but unshipped.
4. Incineration returns (maximum rate 300,000 lbs. per month).
a. All returns invoiced a price to fully cover incineration cost.
b. All customers given equal opportunity to use service.
c. COP to be set up to handle.
d. Alert other incinerator services of our policy.
5. No change in policy on refusal to ship transformer
makeup requirements to transformer users. They should
still obtain product from "Transformer manufacturer.
6. What assistance we will give on plant decontamination.
a. Capacitor/Transformer manufacturers.
b. End users - will refer to equipment manufacturers
(let them know we will do this).
.
7. Position on replacement fluid from Monsanto.
U.S. Export*
1. Recommend cease shipments two months after we cease
domestic shipments.
a. Documentation/L of Credit/Import licenses involve
longer lead time and possibility of legal liability
if we shut off immediately.
b. Additional flexibility in inventory run down.
c. In meantime MESA should avoid commitment to long
term supply contracts.
' DsW 185222
STLCOPCB4051468
Preliminary Actions
1. Persuade customers (capacitors) to buy and increase
. inventory of Aroclor/Capacitors/Inventories at users to
give 4-6 months bridge --' D. Wood
2. Persuade customers to accelerate MCS 1238 approval
programs -- D. Wood
3. Confirm no continuing contractual obligations to supply --
D. Wood
4. CED to prepare survey of Askarel equipment used by
Monsanto -- C.P. Orr
5. List corporate sales to all dielectric customers --
D. Wood
6. Prepare Tentative PR statement -- D.R. Bishop
7. List names of contacts to call at all customers -- D. Wood.
8. Define detailed decontamination procedure for use at
JCrummrich and possible adaptation for customers -- J.R. Savage
*3, hiIwt jLoh c0
(idjLtetesu jo
,o. JyUe. La-
oO
P<l&
DSW 185223
STLCOPCB4051469
PCB EMERGENCY PLAN - TELEPHONE LIST
e
R.G. Potter
Manufacturing
R.A. Pohl
A.E. Leisy R.W. Flint D.T. Mayer W.E. Voss
.
Marketing
-
C, Paton
D. Wood
,
RE. \4a--tton
Medical/Prdt. Acceptability
J.C. Weber Dr. G. Roush W.B. Papageorge
Legal
W.W. Withers T. Bottini
Distribution
E.M. Potter C.B. SiglefJ' R.A, Sipes
Washington Office
W.K. Easley
Public Relations
D.R. Bishop
Office 4-2142
4-2243 812-2019 812-2043 812-310 823-205-293
4-2529 4-2623
4-2027 4-2191 4-2086
4-2851 4-2872
4-2443 4-2428 4-2431
821-4548
4-2891
Home 469-1835
991-5455 966-5608 849-0758 618-286-3483 205-237-5834
227-7581 536-2161
961-7693 997-2234 878-3513
227-8345 725-0677
567-6043 618-234-9945 821-0938
301-299-9587
469-1377
DSW 185224
STLCOPCB4051470
PENULTIMATE
DRAFT
EMERGENCY PLAN - PCB's
Scenario - Immediate ban on production, sale or use of PCB before volume production of MCS 1238 is ready.
Responsibility for^ initiation of this plan and verification of acceptance of responsibilities: R.G. Potter
A. Immediate Actions upon notification of ban 1. Suspend chlorination operations. Suspend shipments from Krummrich Plant and warehouses (Santa Clara, . .Elizabeth, Los Angeles). Do not recall shipments . enroute. Finish any distillation batches under way.
Responsibility: R.A. Pohl
Contacts: Krummrich Plant - A.E. Leisy R.W. Flint
Warehouses
- E.M. Potter C.B. Sigler
2. Make preliminary press release (prepared in advance) stating that operations have been suspended and supplying background information on our PCB control efforts, status of replacements.
' Responsibility: D.R. Bishop
Timing:
Upon notification from R.A. Pohl
that item A.l is complete.
DSW 185225
STLCOPCB4051471
3. Communicate situation to other affected Monsanto operations.
a. Krummrich production planning - D.T. Mayer b. Process Chemicals Marketing (CS Acid, Muriatic) -
J.F. Winkler c. Anniston Plant (biphenyl) - W.E. Voss d. Purchasing (TCB, drums) - B. Byrne
Responsibility: E.M. Potter
4. Determine precise details of ban -- Marketing (D. Wood), Product Acceptability (J.C. Weber), Washington Office (W. Easley), Legal (W. Withers/ T. Bottini), and report to Business Director. Coordinating Responsibility: D. Wood
5. Review this plan to determine whether it fits the circumstances and make recommendations to the CAC on policy and implementation. Responsibility: R.G. Potter Timing: Within 2 business days
Follow-up Actions after CAC approval of detailed policy 1. Appoint Administrative Coordinator for 3-6 month
period. . Responsibility: R.G. Potter 2. Briefing meeting (first day) to define policy and
announce appointment of coordinator to:
qS\N 185226
STLCOPCB4051472
a. Business Group b. COP c. Sales Force d. Research e. P.R. f. Washington Office Responsibility: R.G. Potter
'
3. Notify customers by: a. Telephone to most senior management contact Marketing (first day) b. Certified express letter to: --Office of the President --Purchasing Manager of use locations --Confirmation to telephone contact
(Note - direct all immediate customer responses to marketing group.) Responsibility: D. Wood
4. Notify
to minimize impact on
operation of our Askarel units
Responsibility: G-.P-^-Qrr (Z PUJ ^
5. Resume production and shipments as permitted by the
approved policy, if any.
-Responsibility: R.A. Pohl E.M. Potter
DSW 185227
STLCOPCB4051473
6. Brief corporate marketing directors with other sales to dielectric customers on policy (second day). Responsibility: D. Sliney
7. Notify Federal/State agencies of policies (3-5 days). Responsibility: Washington Office - W. Easley
8. a. P.R. release on policy (second day) b. P.R. prepare Q&A sheet on policy (third day). c. Series of paid advertisements (7-15 days). Responsibility: D.R. Bishop
9. Prepare form letters (third-fourth day). a. Transformer users b. Capacitor users Responsibility: D. Wood
10. Brief U.S. Export Managers on export policy (fifth day). Responsibility: C. Paton/D. Wood
11. Management/Marketing meetings with customers (secondthird week). Responsibility: D. Wood
12. Notify U.S. export customers of policy (second week). Responsibility: Area Managers
13* Upon completion of final customer shipments, move all Monsanto PCB inventories to Krummrich incinerator.
Responsibility: E.M. Potter
14. Initiate decontamination of Krummrich PCB facilities
(see detailed decontamination plan): Responsibility: RA Pohl
OSVJ A85228
STLCOPCB4051474
EMERGENCY PLAN - POLICY DECISIONS NEEDED FOR CAC APPROVAL
Domestic 1. Date of final production 2. Shipment of inventory. 3. Customer committment to orders on books but unshipped. 4. Incineration returns (maximum rate 300,000 lbs. per month
a. All returns invoiced a price to fully cover incineration cost.
b. All customers given equal opportunity to use service. c. COP to be set up to handle. d. Alert other incinerator services of our policy. 5. No change in policy on refusal to ship transformer makeup requirements to transformer users. They should still obtain product from ~'i`ransformer manufacturer.
6. What assistance we will
a. Capacitor/Transformer manufacturers. b. End users - will refer to equipment manufacturers
(let theta know we will do this). 7. Position on replacement fluid from Monsanto.
U.S. Export
1. Recommend cease shipments two months after we cease
domestic shipments.
a. Documentation/L of Credit/Import licenses involve
longer lead time and possibility of legal liability
if we shut off immediately.
b. Additional flexibility in inventory run down. -O
b <6*<3r. In meantime MESA should avoid commitment to long-
^
4* vim n * irvri T it
n
DSW 185229
STLCOPCB4051475
Preliminary Actions
1. Persuade customers (capacitors) to buy and increase
. inventory of Aroclor/Capacitors/Inventories at users to
give k-6 months bridge -- D. Wood (
^ 1 (i ? /-m>\
2. Persuade customers to accelerate MCS 1238 approval
programs -- D. Wood
/`4 (** & ^
3. Confirm no continuing contractual obligations to supply -- D. Wood (W*' t O
4. -GES-to prepare survey of Askarel equipment used by
Monsanto ---e;-JV-rr.
/o Gcb
5. List corporate sales to all dielectric customers --
B. Wood ^
( 11* /"?> i ^ 3
6. Prepare Tentative PH statement -- D.R. Bishop Q f < 7. List names of contacts to call at all customers -- D. Wood (i z.fe1/'** j
8. Define detailed decontamination procedure for use at
Kruramrich and possible adaptation for customers -- J.R. Savage ,
J, .
.,,
,, (rri /'JJ / ' K )v. (l/i/u
/< .
AjUJ'
"
c^Q
^ P>1
C<_X>-t5--.
Cijs4L^<_CL X>
( ^ ( /~> ) '
DSW 185230
STLCOPCB4051476
PCB EMERGENCY PLAN - TELEPHONE LIST
R.G. Potter
Manufa cturing
R.A. Pohl A.E. Leisy R.W. Flint D.T. Mayer W.E. Voss
Marketing
C. Paton D. Wood
Medical/Prdt. Acceptability
J.C. Weber Dr. G. Roush W.B. Papageorge
Legal
W.W. Withers T. Bottini
Distribution
E.M. Potter C.B. Sigler R.A. Sipes
Washington Office
W.K. Easley
Public Relations
D.R. Bishop
Office 4-2142
4-2243 812-2019 812-2043 812-310 823-205-293
4-2529 4-2623
4-2027 4-2191 4-2086
4-2851 4-2872
4-2443 4-2428 4-2431
821-4548
4-2891
Home 469-1835
991-5455 966-5608 849-0758 618-286-3483 205-237-5834
227-7581 536-2161
961-7693 997-2234 878-3513
227-8345 725-0677
567-6043 618-234-9945 821-0938
301-299-9587
469-1377
DSW 185231
STLCOPCB4051477
DRAFT
Emergency Dielectric Plan - Marketing
Scenario - Immedia.t^rban on production of PCB at W.G.K.
^-6 months before volume production of MCS 1238 (.JLs1^ .available.
A. Action 1. Determine precise details of ban - Marketing, Product acceptability. Legal (immediate).
2. Review emergency plan, make detail policy
recommendation to CAC - Marketing/Business
Director (Day 2) .
^ vks
B. Following CAC approval of detail policy:
1. Briefing meeting to define policy to;
a) Business group
b) COP
c) Sales force
d) Research
e) P.R.
(B.l)
f) Washington office.
2 Notify customers by:
a) telephone to most senior management contact Marketing (B.l)
b) Certified express letter to: --Office of the President --Purchasing manager of use locations --Confirmation to telephone contact.
, (B-2) (Note - direct all immediate customer responses to marketing group.)
3. Brief corporate marketing directors with other sales to dielectric customers on policy (B.2) - Marketing' Director.
4. Notify Federal/State agencies of policies (B3-5) Washington Office
5. a) /P.R. release on policy plus series of paid advertisements (B-?)and B2-7).
b) P.R. prepare Q&A sheet on policy (B-3)
6. Prepare form letters
a) Transformer users b) Capacitor users - Marketing (B3-^).
7. Appoint Administrative Coordinator for 3-6 month period - Business Director (B-l).
8. Establish Central Record Center (B-2).
DSW 185232
STLCOPCB4051478
-2-
9. Management/Marketing meetings with customers
(B7 - B21).
,
10. Brief U.S. Export Managers on export policy (B-5).
11. Notify U.S. export customers of policy - Area Managers (B7-B14).
12. Notify corporate engineering (to minimize impact on operation our Askarel units (B-l).
DS\N 185233
STLCOPCB4051479
Policy must cover following Items.
Domestic
1. Date production will stop.
.2 Can we ship inventory, y
Shipments in transit should move to customer\ A-v-J 3. 4. Customer commitment to orders on books but unshipped^ (j^r
5. Incineration returns (man rate 300,000 lbs. per month?)
a) All returns invoiced a price to fully cover incinera tion cost.
b) All customers given equal opportunity to use service, cj COP to be set up to handle. d) Alert other incinerator services of our policy.
6. No change in policy on refusal to ship transformer makeup requirements to transformer users. They should still obtain product from T manufacturer.
7. Indemnification agreements (termination).
.8 What assistance we will give on plant decontamination.
a) Capacitor/Transformer manufacturers.^ b) End users - will refer to equipment manufacturers
(let them know we will do this).
9- Position on replacement fluid from Monsanto.
U.S. Export
1. Recommend cease shipments two months after we cease domestic shipments.
a) Documentstion/L of Credit/import licenses involve longer lead time and possibility of legal liability if we shut off immediately.
b) Additional flexibility in inventory run down.
Ex U.S.A.
A. Recommend we maintain U.K. production and take separate decision in 1 month following U.S. ban on future of U.K. production.
B. If we decide to cease production minimum 2 months after U.S. production shutdown.
C. In meantime MESA should avoid commitment to long-term supply contracts.
DSW 185234
STLCOPCB4051480
A number of preliminary actions should in any event be put in hand immediately. 1. Persuade customers (capacitors) to buy and increase
inventory of Aroclor/Capacitors/lnventories at users to give 4-6 months bridge - Marketing. 2. Persuade customers to accelerate MCS 1238 approval programs - Marketing. 3. In face of government ban define our legal position vs. (a) customers, (b) users, (c) government agencies who may file suit for supply or in case of agencies invoke defense priorities - Legal. 4. Confirm no continuing contractual obligations to supply - Marketing. 5. Define action to be taken on cancellation of indemnity agreements and legal status of these agreements following a ban - Legal. 6. Advise corporate engineering to prepare survey of Askarel equipment used by Monsanto - Marketing. 7. List corporate sales to all dielectric customers -
J^Jg rlrd Hnrr /MT QT>
A
DSW 185235
STLCOPCB4051481
PCB EMERGENCY PLAN - MANUFACTURING
Scenario: U.S. Government ban on PCB's without any lead time
for compliance. MCS 1238 availability 2-4 months away.
: <1? C ?
(1) Suspend chlorination operations. Finish
" '* Hat ion
batches underway. If at nij;ht or weekend* call "A.E. Leisy
Responsibility: Manufacturing Timing: Immediate (Teletype + Telephone)
(2) Suspend shipments from Krummrich and warehouses (Santa , Clara* Elizabeth* Los Angeles). Do not recall shipments
enroute. Responsibility: Materials Management Timing: Immediate (Teletype + Telephone)
(3) Communicate situation to WGK Production Planning (Mayer)
so that CS Acid/Muriatic priorities can be assessed and *
new schedules drawn up. Communicate to Process Chemicals
Marketing. Communicate to Anniston re biphenyl schedule.
Cancel orders for trichlorobenzene and special drums.
Responsibility: Materials Manag
Timing: Immediate (Telephone)
(4) (Detailed Marketing Plan will replace this item)
Determine customer requirements* if any. Will any customers
fight the ban* can we produce for export* etc.?
Can/will Monsanto supply a customer who is fighting a
ban on use?
DSW 185236
STLCOPCB4051482
Responsibility: Marketing Law Department Washington Office
Timing: Within 7 days
Decision: Via General Manager
Upon resolution of Item (4), restart production to
complete agreed-upon requirements, if any.
Responsibility: Manufacturing
Timing: As required.
'
Upon resolution of Item (4), resume shipments as agreed,
if any.
Responsibility: Materials Management
Timing: As agreed.
Ship PCB inventory from warehouses to Krummrich incinerator.
Transfer any production department inventory to incinerator.
Reassess incineration priorities in rest of plant.
.
Responsibility: Materials Management Manufacturing
Timing: Within l4 days of completion of Item (6).
,
Upon completion of Items (5), (6), and (7), commence the
decontamination procedure. Incinerate all combustible
waste materials. Mothball equipment pending dismantling
or conversion to other service.
Responsibility: Manufacturing
Timing: Within 30 days of final production. Disperse work force with'^Krummrich Plant. Establish C^Q-^'CCi^ -
tracking system to follow medical neeord'R* Responsibility: Manufacturing Timing: Upon completion of Item (7).
^ DSWI85237
STLCOPCB4051483
Other Plausible Scenarios (the "what-if" game)
- Effluent regulations in one or more states make capacitor
manufacture impossible within their jurisdiction.
'
- Government uses (e.g. defense priorities) demand a continuing supply.
- State of Illinois action against Krummrich
- ban on PCB manufacture; - ban on bringing in waste PCB for incineration from
outside Illinois; - operating permit for incinerator withdrawn.
- Government imposes extended moratorium on replacements pending safety/environmental testing.
- Plant disaster (Krummrich or Anniston) destroys PCB
manufacturing capability (several
to restore).
- Government or Industry asks us to take the 1043/1016 route.
- Selective ban on transformer application (or transformer makers drop out).
- Major customers consider the ban illegal and want us to supply while fighting it.