Document EwVbv7odjM6jJ7jwwVbkL3gL

Region 6 - Enforcement & Compliance Assurance Division INSPECTION REPORT Inspection Date(s): Media Program: Regulatory Program(s) 03/13/2025 Water Clean Water Act-National Pollution Discharge Elimination System (Brine) Company Name: Facility Name: Facility Physical Location: (city, state, zip code) Mailing address: (city, state, zip code) County/Parish: Facility Phone Number Facility Contact: Calgary Energy, LLC Tidal Osage 1 Lease Latitude: 36.538962, Longitude: -96.397667 Hominy, OK, 74035 4444 E. 146th St. N Skiatook, OK, 74070 Tulsa 918-798-4510 Blaine Haag Co-Owner bhaag.calgaryenergyllc@gmail.com FRS Number: Identification/Permit Number: Media Identifier Number: NAICS: SIC: n/a OKU000893 n/a 211111 1311 Personnel participating in inspection: Matthew Allen EPA/Region 6 ECDW Inspector EPA Lead Inspector Signature/Date Supervisor Signature/Date MATTHEW ALLEN Date: 2025.03.26 11:37:16 -05'00' Digitally signed by MATTHEW ALLEN Matthew Allen Date JEANNE ECKHART Date: 2025.04.02 10:49:55 -05'00' Digitally signed by JEANNE ECKHART Jeanne Eckhart Date 6ENFORM-019-R8.2 (02/12/2020) 1 Calgary Energy, LLC / Tidal Osage 1 Lease CWA Inspection Date 03/11/2025 Section I - INTRODUCTION PURPOSE OF THE INSPECTION EPA Region 6 Inspector, Matthew Allen, arrived at the Calgary Energy, LLC / Tidal Osage 1 Lease (EPA ID No. OKU000893) at 10:30 AM on 03/13/2025 for a follow-up inspection. Calgary Energy, LLC employee, Toby Jones was present for portions of the inspection. This was an EPA inspection in response to an initial spill inspection (NRC No. 1425812) conducted 3/11/2025. The inspection was conducted by the authority of the Clean Water Act (CWA) to determine compliance with Environmental Protection Agency (EPA) regulations. There was no other federal, state, or local agency representative present at the time of the inspection. FACILITY DESCRIPTION EPA conducted a follow-up inspection at the Calgary Energy, LLC, Tidal Osage 1 Lease, where a 3-inch steel flowline ruptured releasing a company estimated 350 barrels of saltwater and 2.5 barrel of crude oil onto the ground. The spilled fluid migrated south into an unnamed tributary, then west eventually impacting Little Hominy Creek. Section II - OBSERVATIONS I observed the confluence of the impacted, unnamed tributary with Little Hominy Creek. Cleanup was ongoing during the inspection. I observed significantly less oil on the tributary than during the initial spill inspection conducted 3/11/2025. See photo No. 1. For additional GPS location information and photo metadata, please see Appendix 1 (photo log) attached to this report. At the low water bridge, I observed the floating, oil absorbent containment boom with crude oil being held back from further downstream migration. From this same location, along the bottom of Little Hominy Creek in the main channel, I observed a TDS field reading of 15,086 mg/L. This was the highest TDS observed during the inspection but did represent an improvement over the initial spill inspection observations. Se photos No. 2 & 3. I observed oil and oil sheen migrating downstream from the county road 5420 bridge crossing Little Hominy Creek at GPS (36.521017, -96.398967). This represented a downstream migration of spill impacts more than 1.5 miles (when following the creek channel) beyond the observed impacts from the initial spill inspection on 3/11/2025. I observed Calgary Energy, LLC employees installing containment booms on Little Hominy Creek approximately 2.5+ miles (when travelling in a straight line) downstream from the previously documented spill impacts. Booms were installed at GPS (36.495917, -96.394297). 2 Section III - AREAS OF CONCERN Calgary Energy, LLC / Tidal Osage 1 Lease CWA Inspection Date 03/11/2025 The primary area of concern was the unsecured spill impacts which had continued migrating down Little Hominy Creek since the initial spill inspection conducted on 3/11/2025. Additional areas of concern included the ruptured flowline, brine/oil impacted soil and vegetation along the overland flowpath, the impacted waters and banks of the unnamed tributary and the oil/brine impacts in the main channel and along the banks of Little Hominy Creek. Section IV - FOLLOW UP EPA inspector spoke with Blaine Haag via phone during the inspection to inform Calgary Energy, LLC that spill impacts were not yet secure and continued migrating downstream. Calgary responded by sending men and equipment to install the boom location (GPS 36.495917, -96.394297) referenced in the observations section above. EPA inspector received a follow-up call from Connor Haag on 3/18/2025 in reference to Calgary Energy, LLC's plan to repair the compromised flowline which was the release point of the spill. EPA inspector will conduct follow-up calls, field meetings and inspections to ensure the impacted area is returned to "pre spill" condition. Section V - LIST OF APPENDICES Appendix 1 - Photo Log - 3 photos taken 3/13/2025 There are no additional appendices. 3 Calgary Energy, LLC/ Tidal Osage 1 Lease (CWA) Inspection Date: 03/13/2025 Appendix 1 Photograph Log 3 Photos UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Photograph Log Location: 36.538962, -96.397667 City: Hominy Photo No. 1 County/Parish: Osage State: Oklahoma Photo File Name: R0010610 Orientation: WNW Date of Photo: 03/13/2025 Time of Photo: 10:38 AM Latitude: 36.538962 Longitude: -96.397667 Photographer: Matthew Allen Description: This was a view of the impacted, unnamed tributary as it spilled into Little Hominy Creek. This photo showed ongoing cleanup efforts and significant reduction in crude oil compared to the initial spill inspection. UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Photograph Log Location: 36.538962, -96.397667 City: Hominy Photo No. 2 County/Parish: Osage State: Oklahoma Photo File Name: R0010611 Orientation: SW Date of Photo: 03/13/2025 Time of Photo: 10:42 AM Latitude: 36.538627 Longitude: -96.398533 Photographer: Matthew Allen Description: This was the floating, oil absorbent containment boom with crude oil being held back from further downstream migration. UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Photograph Log Location: 36.538962, -96.397667 City: Hominy Photo No. 3 County/Parish: Osage State: Oklahoma Photo File Name: R0010612 Orientation: N/A Date of Photo: 03/13/2025 Time of Photo: 10:37 AM Latitude: 36.538627 Longitude: -96.398533 Photographer: Matthew Allen Description: This was a TDS field reading of 15,086 mg/L which was observed in the main channel of Little Hominy Creek immediately upstream from the cement low water crossing. This was the highest TDS observed during the inspection but showed improvement from the initial spill inspection conducted on 3/11/2025.